IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i17p10704-d899861.html
   My bibliography  Save this article

Exploring the Impact Mechanism of Interface Management Performance of Sustainable Prefabricated Construction: The Perspective of Stakeholder Engagement

Author

Listed:
  • Haiying Luan

    (School of Management Engineering, Qingdao University of Technology, Qingdao 266520, China)

  • Long Li

    (School of Management Engineering, Qingdao University of Technology, Qingdao 266520, China)

  • Shengxi Zhang

    (Department of Construction Management, Dalian University of Technology, Dalian 116000, China)

Abstract

Prefabricated construction (PC) activities are geographically fragmented, temporally disrupted, resulting in numerous and complex interfaces. It is stakeholder collaboration by integrating diverse resources within the PC industry to potentially address the factors that impact interface management performance. Previous studies have explored the impact factors of interface management performance without deeply considering the stakeholder and their linkages with the impact factors of interface management. Therefore, this study used a two-mode social network to investigate the impact of the interface management performance of sustainable PC from a stakeholder perspective. Firstly, 24 factors impact interface management of sustainable PC, as well as 12 stakeholders with power to address the factors, were identified based on a literature review and interviews with experts. Subsequently, Stakeholder-factors relationships were judged by a designed questionnaire. Then, the centrality and core-periphery structure analysis methods were adopted to study the network. The findings revealed that developers, general contractors, subcontractors, designers, and suppliers are the core stakeholders, with improved collaboration between these five stakeholders (42%) able to address 18 core factors (75%). The factors that have the most significant impact on the interface management performance of prefabricated construction include understanding and trust, communication and learning, and cooperative attitudes among participants, the effectiveness and timeliness of information communication, formal interface management processes, technical innovation, and the perfection of standards and specifications. By prioritizing these factors, the complexity of the network can be successfully decreased and interface management performance can be improved. This study not only contributes to identifying the impact mechanism of stakeholders on the factors of interface management performance, but also contributes to promoting stakeholder cooperation to improve the sustainability of prefabricated construction.

Suggested Citation

  • Haiying Luan & Long Li & Shengxi Zhang, 2022. "Exploring the Impact Mechanism of Interface Management Performance of Sustainable Prefabricated Construction: The Perspective of Stakeholder Engagement," Sustainability, MDPI, vol. 14(17), pages 1-18, August.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:17:p:10704-:d:899861
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/17/10704/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/17/10704/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Nawal Abdunasseer Hmidah & Nuzul Azam Haron & Aidi Hizami Alias & Teik Hua Law & Abubaker Basheer Abdalwhab Altohami & Raja Ahmad Azmeer Raja Ahmad Effendi, 2022. "The Role of the Interface and Interface Management in the Optimization of BIM Multi-Model Applications: A Review," Sustainability, MDPI, vol. 14(3), pages 1-29, February.
    2. Prapatpaow Awakul & Stephen Ogunlana, 2002. "The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study," Construction Management and Economics, Taylor & Francis Journals, vol. 20(4), pages 365-377.
    3. Chris Goodier & Alistair Gibb, 2007. "Future opportunities for offsite in the UK," Construction Management and Economics, Taylor & Francis Journals, vol. 25(6), pages 585-595.
    4. Zezhou Wu & Lirong Luo & Heng Li & Ying Wang & Guoqiang Bi & Maxwell Fordjour Antwi-Afari, 2021. "An Analysis on Promoting Prefabrication Implementation in Construction Industry towards Sustainability," IJERPH, MDPI, vol. 18(21), pages 1-21, October.
    5. Shengxi Zhang & Zhongfu Li & Shengbin Ma & Long Li & Mengqi Yuan, 2022. "Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China," Sustainability, MDPI, vol. 14(9), pages 1-20, April.
    6. Menoka Bal & David Bryde & Damian Fearon & Edward Ochieng, 2013. "Stakeholder Engagement: Achieving Sustainability in the Construction Sector," Sustainability, MDPI, vol. 5(2), pages 1-16, February.
    7. Kexi Xu & Geoffrey Qiping Shen & Guiwen Liu & Igor Martek, 2019. "Demolition of Existing Buildings in Urban Renewal Projects: A Decision Support System in the China Context," Sustainability, MDPI, vol. 11(2), pages 1-22, January.
    8. Long Li & Zhongfu Li & Guangdong Wu & Xiaodan Li, 2018. "Critical Success Factors for Project Planning and Control in Prefabrication Housing Production: A China Study," Sustainability, MDPI, vol. 10(3), pages 1-17, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Shengxi Zhang & Mengqi Yuan & Long Li, 2022. "Exploring the Impact Mechanism of Interface Management of Prefabricated Construction Projects," Sustainability, MDPI, vol. 14(21), pages 1-20, November.
    2. Adityawarman Adil & Rizal Syarief & Widiatmaka & Mukhamad Najib, 2022. "Stakeholder Analysis and Prioritization of Sustainable Organic Farming Management: A Case Study of Bogor, Indonesia," Sustainability, MDPI, vol. 14(24), pages 1-16, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shengxi Zhang & Zhongfu Li & Shengbin Ma & Long Li & Mengqi Yuan, 2022. "Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China," Sustainability, MDPI, vol. 14(9), pages 1-20, April.
    2. Shengxi Zhang & Mengqi Yuan & Long Li, 2022. "Exploring the Impact Mechanism of Interface Management of Prefabricated Construction Projects," Sustainability, MDPI, vol. 14(21), pages 1-20, November.
    3. Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2018. "Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model," Sustainability, MDPI, vol. 10(1), pages 1-22, January.
    4. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    5. Mahsa Mesgar & Diego Ramirez-Lovering & Mohamed El-Sioufi, 2021. "Tension, Conflict, and Negotiability of Land for Infrastructure Retrofit Practices in Informal Settlements," Land, MDPI, vol. 10(12), pages 1-15, November.
    6. Jean Baptiste Habumuremyi & Thomas K Tarus, 2021. "Effect of Stakeholders’ Participation on Sustainability of Community Projects in Ruhango District, Rwanda," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(09), pages 429-433, September.
    7. Sang-Guk Yum & Kiyoung Son & Seunghyun Son & Ji-Myong Kim, 2020. "Identifying Risk Indicators for Natural Hazard-Related Power Outages as a Component of Risk Assessment: An Analysis Using Power Outage Data from Hurricane Irma," Sustainability, MDPI, vol. 12(18), pages 1-15, September.
    8. Shabir Hussain Malik & Weizhong Fu & Samma Faiz Rasool & Gowhar Ahmad Wani & Shah Zaman & Najaf Ali Wani, 2023. "Investigating the Impact of Communication Factors and Stakeholders Engagement on Renewable Energy Projects in Pakistan," Sustainability, MDPI, vol. 15(14), pages 1-14, July.
    9. Satheeskumar Navaratnam, 2022. "Selecting a Suitable Sustainable Construction Method for Australian High-Rise Building: A Multi-Criteria Analysis," Sustainability, MDPI, vol. 14(12), pages 1-17, June.
    10. Pei Dang & Zhanwen Niu & Shang Gao & Lei Hou & Guomin Zhang, 2020. "Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
    11. Zhou, Yulin & Lan, Feng & Zhou, Tao, 2021. "An experience-based mining approach to supporting urban renewal mode decisions under a multi-stakeholder environment in China," Land Use Policy, Elsevier, vol. 106(C).
    12. Shiyao Zhu & Dezhi Li & Haibo Feng & Tiantian Gu & Jiawei Zhu, 2019. "AHP-TOPSIS-Based Evaluation of the Relative Performance of Multiple Neighborhood Renewal Projects: A Case Study in Nanjing, China," Sustainability, MDPI, vol. 11(17), pages 1-17, August.
    13. Andri Ottesen & Dieter Thom & Rupali Bhagat & Rola Mourdaa, 2023. "Learning from the Future of Kuwait: Scenarios as a Learning Tool to Build Consensus for Actions Needed to Realize Vision 2035," Sustainability, MDPI, vol. 15(9), pages 1-25, April.
    14. Houchao Sun & Yuwei Fang & Minggan Yin & Feiting Shi, 2023. "Research on the Restrictive Factors of Vigorous Promotion of Prefabricated Buildings in Yancheng under the Background of “Double Carbon”," Sustainability, MDPI, vol. 15(2), pages 1-21, January.
    15. Yongwoon Cha & Jonghyeob Kim & Chang-taek Hyun & Sangwon Han, 2018. "Development of a Program Definition Rating Index for the Performance Prediction of Construction Programs," Sustainability, MDPI, vol. 10(8), pages 1-18, August.
    16. Anat Anaqie Zahidy & Shahryar Sorooshian & Zahidy Abd Hamid, 2019. "Critical Success Factors for Corporate Social Responsibility Adoption in the Construction Industry in Malaysia," Sustainability, MDPI, vol. 11(22), pages 1-24, November.
    17. Hosang Hyun & Hyung-Geun Kim & Jin-Sung Kim, 2022. "Integrated Off-Site Construction Design Process including DfMA Considerations," Sustainability, MDPI, vol. 14(7), pages 1-20, March.
    18. Agata Klaus-Rosińska & Joanna Iwko, 2021. "Stakeholder Management—One of the Clues of Sustainable Project Management—As an Underestimated Factor of Project Success in Small Construction Companies," Sustainability, MDPI, vol. 13(17), pages 1-27, September.
    19. Zhengqi He & Dechun Huang & Changzheng Zhang & Junmin Fang, 2018. "Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis," Sustainability, MDPI, vol. 10(4), pages 1-15, April.
    20. George Mgendi & Mao Shiping & Cheng Xiang, 2019. "A Review of Agricultural Technology Transfer in Africa: Lessons from Japan and China Case Projects in Tanzania and Kenya," Sustainability, MDPI, vol. 11(23), pages 1-19, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:17:p:10704-:d:899861. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.