IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v35y1989i3p353-366.html
   My bibliography  Save this item

Capacitated Lot Sizing with Setup Times

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Marshall Fisher & Kamalini Ramdas & Yu-Sheng Zheng, 2001. "Ending Inventory Valuation in Multiperiod Production Scheduling," Management Science, INFORMS, vol. 47(5), pages 679-692, May.
  2. François Vanderbeck, 1998. "Lot-Sizing with Start-Up Times," Management Science, INFORMS, vol. 44(10), pages 1409-1425, October.
  3. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
  4. Kelly Cristina Poldi & Silvio Alexandre Araujo, 2016. "Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem," Annals of Operations Research, Springer, vol. 238(1), pages 497-520, March.
  5. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
  6. Amanda O. C. Ayres & Betania S. C. Campello & Washington A. Oliveira & Carla T. L. S. Ghidini, 2021. "A Bi-Integrated Model for coupling lot-sizing and cutting-stock problems," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(4), pages 1047-1076, December.
  7. Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
  8. Bouchriha, Hanen & Ouhimmou, Mustapha & D'Amours, Sophie, 2007. "Lot sizing problem on a paper machine under a cyclic production approach," International Journal of Production Economics, Elsevier, vol. 105(2), pages 318-328, February.
  9. Mehmet Önal & H. Edwin Romeijn, 2010. "Multi‐item capacitated lot‐sizing problems with setup times and pricing decisions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(2), pages 172-187, March.
  10. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Other publications TiSEM 0cf065b7-4836-4cdd-9317-0, Tilburg University, School of Economics and Management.
  11. Amorim, P. & Belo-Filho, M.A.F. & Toledo, F.M.B. & Almeder, C. & Almada-Lobo, B., 2013. "Lot sizing versus batching in the production and distribution planning of perishable goods," International Journal of Production Economics, Elsevier, vol. 146(1), pages 208-218.
  12. Absi, Nabil & Kedad-Sidhoum, Safia, 2008. "The multi-item capacitated lot-sizing problem with setup times and shortage costs," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1351-1374, March.
  13. Salvietti, Luciano & Smith, Neale R., 2008. "A profit-maximizing economic lot scheduling problem with price optimization," European Journal of Operational Research, Elsevier, vol. 184(3), pages 900-914, February.
  14. Wu, Tao & Shi, Leyuan & Geunes, Joseph & AkartunalI, Kerem, 2011. "An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging," European Journal of Operational Research, Elsevier, vol. 214(2), pages 428-441, October.
  15. Önal, Mehmet & van den Heuvel, Wilco & Dereli, Meryem Merve & Albey, Erinç, 2023. "Economic lot sizing problem with tank scheduling," European Journal of Operational Research, Elsevier, vol. 308(1), pages 166-182.
  16. Silvio Alexandre de Araujo & Bert De Reyck & Zeger Degraeve & Ioannis Fragkos & Raf Jans, 2015. "Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 431-448, August.
  17. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
  18. Hadi Farhangi, 2021. "Multi-Echelon Supply Chains with Lead Times and Uncertain Demands," SN Operations Research Forum, Springer, vol. 2(3), pages 1-25, September.
  19. Absi, Nabil & van den Heuvel, Wilco, 2019. "Worst case analysis of Relax and Fix heuristics for lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 279(2), pages 449-458.
  20. Camargo, Victor C.B. & Toledo, Franklina M.B. & Almada-Lobo, Bernardo, 2014. "HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 266-277.
  21. Gondzio, Jacek & González-Brevis, Pablo & Munari, Pedro, 2013. "New developments in the primal–dual column generation technique," European Journal of Operational Research, Elsevier, vol. 224(1), pages 41-51.
  22. Jenny Carolina Saldana Cortés, 2011. "Programación semidefinida aplicada a problemas de cantidad económica de pedido," Documentos CEDE 8735, Universidad de los Andes, Facultad de Economía, CEDE.
  23. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
  24. Gramani, Maria Cristina N. & França, Paulo M. & Arenales, Marcos N., 2011. "An Exact Approach to the Relaxed Combined Production Planning Model," Insper Working Papers wpe_178, Insper Working Paper, Insper Instituto de Ensino e Pesquisa.
  25. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
  26. Sônia Poltroniere & Kelly Poldi & Franklina Toledo & Marcos Arenales, 2008. "A coupling cutting stock-lot sizing problem in the paper industry," Annals of Operations Research, Springer, vol. 157(1), pages 91-104, January.
  27. Ozdamar, Linet & Birbil, Sevket Ilker, 1998. "Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions," European Journal of Operational Research, Elsevier, vol. 110(3), pages 525-547, November.
  28. Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
  29. Chen, Haoxun, 2015. "Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems," Omega, Elsevier, vol. 56(C), pages 25-36.
  30. Akartunalı, Kerem & Dauzère-Pérès, Stéphane, 2022. "Dynamic lot sizing with stochastic demand timing," European Journal of Operational Research, Elsevier, vol. 302(1), pages 221-229.
  31. Alyne Toscano & Deisemara Ferreira & Reinaldo Morabito, 2019. "A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 142-173, March.
  32. Oliveira, Washington A. & Fiorotto, Diego J. & Song, Xiang & Jones, Dylan F., 2021. "An extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problem," European Journal of Operational Research, Elsevier, vol. 295(3), pages 996-1007.
  33. M Denizel & H Süral, 2006. "On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 389-399, April.
  34. Kelly Poldi & Silvio Araujo, 2016. "Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem," Annals of Operations Research, Springer, vol. 238(1), pages 497-520, March.
  35. Rizk, Nafee & Martel, Alain & Ramudhin, Amar, 2006. "A Lagrangean relaxation algorithm for multi-item lot-sizing problems with joint piecewise linear resource costs," International Journal of Production Economics, Elsevier, vol. 102(2), pages 344-357, August.
  36. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Research Memorandum FEW 579, Tilburg University, School of Economics and Management.
  37. Nadjib Brahimi & Tarik Aouam, 2016. "Multi-item production routing problem with backordering: a MILP approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1076-1093, February.
  38. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
  39. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
  40. dos Santos-Meza, Elisangela & Oliveira dos Santos, Maristela & Nereu Arenales, Marcos, 2002. "A lot-sizing problem in an automated foundry," European Journal of Operational Research, Elsevier, vol. 139(3), pages 490-500, June.
  41. Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
  42. Gabriel Amaro & Diego Jacinto Fiorotto & Washington Alves Oliveira, 2023. "Impact analysis of flexibility on the integrated lot sizing and supplier selection problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(1), pages 236-266, April.
  43. Mohan Gopalakrishnan & Ke Ding & Jean-Marie Bourjolly & Srimathy Mohan, 2001. "A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover," Management Science, INFORMS, vol. 47(6), pages 851-863, June.
  44. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
  45. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
  46. Armentano, Vinícius A. & França, Paulo M. & de Toledo, Franklina M. B., 1999. "A network flow model for the capacitated lot-sizing problem," Omega, Elsevier, vol. 27(2), pages 275-284, April.
  47. Tao Wu, 2022. "Predictive Search for Capacitated Multi-Item Lot Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 34(1), pages 385-406, January.
  48. Haugen, Kjetil K. & Lokketangen, Arne & Woodruff, David L., 2001. "Progressive hedging as a meta-heuristic applied to stochastic lot-sizing," European Journal of Operational Research, Elsevier, vol. 132(1), pages 116-122, July.
  49. Tao Wu & Zhe Liang & Canrong Zhang, 2018. "Analytics Branching and Selection for the Capacitated Multi-Item Lot Sizing Problem with Nonidentical Machines," INFORMS Journal on Computing, INFORMS, vol. 30(2), pages 236-258, May.
  50. Okhrin, Irena & Richter, Knut, 2011. "An O(T3) algorithm for the capacitated lot sizing problem with minimum order quantities," European Journal of Operational Research, Elsevier, vol. 211(3), pages 507-514, June.
  51. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
  52. Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
  53. Rowshannahad, Mehdi & Absi, Nabil & Dauzère-Pérès, Stéphane & Cassini, Bernard, 2018. "Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products," International Journal of Production Economics, Elsevier, vol. 198(C), pages 25-37.
  54. Samadi, Mohammadreza & Nikolaev, Alexander & Nagi, Rakesh, 2016. "A subjective evidence model for influence maximization in social networks," Omega, Elsevier, vol. 59(PB), pages 263-278.
  55. Karla E. Bourland & Candace Arai Yano, 1996. "Lot sizing when yields increase during the production run," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1035-1047, December.
  56. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
  57. Andreas Goerler & Stefan Voß, 2016. "Dynamic lot-sizing with rework of defective items and minimum lot-size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2284-2297, April.
  58. Grubbstrom, Robert W. & Wang, Zhiping, 2003. "A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 483-494, January.
  59. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
  60. Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Dairi, Meriem, 2021. "Dynamic lot-sizing with short-term financing and external deposits for a capital-constrained manufacturer," International Journal of Production Economics, Elsevier, vol. 242(C).
  61. Haugen, Kjetil K. & Olstad, Asmund & Pettersen, Bard I., 2007. "The profit maximizing capacitated lot-size (PCLSP) problem," European Journal of Operational Research, Elsevier, vol. 176(1), pages 165-176, January.
  62. Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Ranjan, Ravi Prakash, 2023. "Dynamic lot-sizing in a two-stage supply chain with liquidity constraints and financing options," International Journal of Production Economics, Elsevier, vol. 258(C).
  63. Bian, Yuan & Lemoine, David & Yeung, Thomas G. & Bostel, Nathalie & Hovelaque, Vincent & Viviani, Jean-laurent & Gayraud, Fabrice, 2018. "A dynamic lot-sizing-based profit maximization discounted cash flow model considering working capital requirement financing cost with infinite production capacity," International Journal of Production Economics, Elsevier, vol. 196(C), pages 319-332.
  64. Liang, Zhe & He, Yan & Wu, Tao & Zhang, Canrong, 2015. "An informative column generation and decomposition method for a production planning and facility location problem," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 88-96.
  65. Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
  66. Pedro L. Miranda & Reinaldo Morabito & Deisemara Ferreira, 2018. "Optimization model for a production, inventory, distribution and routing problem in small furniture companies," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 26(1), pages 30-67, April.
  67. Muller, Laurent Flindt & Spoorendonk, Simon & Pisinger, David, 2012. "A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times," European Journal of Operational Research, Elsevier, vol. 218(3), pages 614-623.
  68. I. Karakayali & E. Akçalı & S. Çetinkaya & H. Üster, 2013. "Capacitated replenishment and disposal planning for multiple products with resalable returns," Annals of Operations Research, Springer, vol. 203(1), pages 325-350, March.
  69. Ozdamar, Linet & Barbarosoglu, Gulay, 2000. "An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 68(3), pages 319-331, December.
  70. Absi, Nabil & Archetti, Claudia & Dauzère-Pérès, Stéphane & Feillet, Dominique & Speranza, M. Grazia, 2018. "Comparing sequential and integrated approaches for the production routing problem," European Journal of Operational Research, Elsevier, vol. 269(2), pages 633-646.
  71. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  72. Drexl, Andreas & Haase, Knut, 1993. "Sequential-analysis-based randomized-regret-methods for lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 323, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  73. Dziuba, Daryna & Almeder, Christian, 2023. "New construction heuristic for capacitated lot sizing problems," European Journal of Operational Research, Elsevier, vol. 311(3), pages 906-920.
  74. Degraeve, Z. & Jans, R.F., 2003. "A New Dantzig-Wolfe Reformulation And Branch-And-Price Algorithm For The Capacitated Lot Sizing Problem With Set Up Times," ERIM Report Series Research in Management ERS-2003-010-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  75. Fiorotto, Diego Jacinto & Jans, Raf & Alexandre de Araujo, Silvio, 2018. "Process flexibility and the chaining principle in lot sizing problems," International Journal of Production Economics, Elsevier, vol. 204(C), pages 244-263.
  76. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
  77. Nadjib Brahimi & Stéphane Dauzère-Pérès & Najib M. Najid, 2006. "Capacitated Multi-Item Lot-Sizing Problems with Time Windows," Operations Research, INFORMS, vol. 54(5), pages 951-967, October.
  78. Ioannis Fragkos & Zeger Degraeve & Bert De Reyck, 2016. "A Horizon Decomposition Approach for the Capacitated Lot-Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 28(3), pages 465-482, August.
  79. Taş, Duygu & Gendreau, Michel & Jabali, Ola & Jans, Raf, 2019. "A capacitated lot sizing problem with stochastic setup times and overtime," European Journal of Operational Research, Elsevier, vol. 273(1), pages 146-159.
  80. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
  81. Süral, Haldun & Denizel, Meltem & Van Wassenhove, Luk N., 2009. "Lagrangean relaxation based heuristics for lot sizing with setup times," European Journal of Operational Research, Elsevier, vol. 194(1), pages 51-63, April.
  82. Stadtler, Hartmut & Sahling, Florian, 2013. "A lot-sizing and scheduling model for multi-stage flow lines with zero lead times," European Journal of Operational Research, Elsevier, vol. 225(3), pages 404-419.
  83. Diego Fiorotto & Silvio Araujo, 2014. "Reformulation and a Lagrangian heuristic for lot sizing problem on parallel machines," Annals of Operations Research, Springer, vol. 217(1), pages 213-231, June.
  84. Jans, R.F., 2006. "Solving Lotsizing Problems on Parallel Identical Machines Using Symmetry Breaking Constraints," ERIM Report Series Research in Management ERS-2006-051-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  85. AkartunalI, Kerem & Miller, Andrew J., 2009. "A heuristic approach for big bucket multi-level production planning problems," European Journal of Operational Research, Elsevier, vol. 193(2), pages 396-411, March.
  86. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
  87. K S Hindi & K Fleszar & C Charalambous, 2003. "An effective heuristic for the CLSP with set-up times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 490-498, May.
  88. Fumero, Francesca & Vercellis, Carlo, 1997. "Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation," International Journal of Production Economics, Elsevier, vol. 49(1), pages 45-54, March.
  89. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.