IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v62y1999i3p181-200.html
   My bibliography  Save this item

A review of the stochastic lot scheduling problem

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Soman, Chetan Anil & Pieter van Donk, Dirk & Gaalman, Gerard, 2006. "Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand," International Journal of Production Economics, Elsevier, vol. 104(2), pages 441-453, December.
  2. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
  3. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
  4. Smits, Sanne R. & Wagner, Michael & G. de Kok, Ton, 2004. "Determination of an order-up-to policy in the stochastic economic lot scheduling model," International Journal of Production Economics, Elsevier, vol. 90(3), pages 377-389, August.
  5. Arruda, E.F. & Fragoso, M.D. & do Val, J.B.R., 2011. "Approximate dynamic programming via direct search in the space of value function approximations," European Journal of Operational Research, Elsevier, vol. 211(2), pages 343-351, June.
  6. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
  7. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
  8. George Liberopoulos & Dimitrios Pandelis & Olympia Hatzikonstantinou, 2013. "The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers," Annals of Operations Research, Springer, vol. 209(1), pages 179-205, October.
  9. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
  10. Tempelmeier, Horst, 2011. "A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint," Omega, Elsevier, vol. 39(6), pages 627-633, December.
  11. Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
  12. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
  13. Beraldi, Patrizia & Ghiani, Gianpaolo & Guerriero, Emanuela & Grieco, Antonio, 2006. "Scenario-based planning for lot-sizing and scheduling with uncertain processing times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 140-149, May.
  14. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
  15. Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
  16. Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
  17. Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
  18. Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
  19. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
  20. Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
  21. Wei-Min Lan & Tava Lennon Olsen, 2006. "Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules," Operations Research, INFORMS, vol. 54(3), pages 505-522, June.
  22. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
  23. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
  24. Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
  25. Donald D. Eisenstein, 2005. "Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies," Operations Research, INFORMS, vol. 53(4), pages 675-688, August.
  26. Ashayeri, J. & Heuts, R.J.M. & Lansdaal, H.G.L. & Strijbosch, L.W.G., 2006. "Cyclic production-inventory planning and control in the pre-Deco industry: A case study," International Journal of Production Economics, Elsevier, vol. 103(2), pages 715-725, October.
  27. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
  28. Curcio, Eduardo & Amorim, Pedro & Zhang, Qi & Almada-Lobo, Bernardo, 2018. "Adaptation and approximate strategies for solving the lot-sizing and scheduling problem under multistage demand uncertainty," International Journal of Production Economics, Elsevier, vol. 202(C), pages 81-96.
  29. Fujimoto, Takahiro & Park, Young Won, 2014. "Balancing supply chain competitiveness and robustness through “virtual dual sourcing”: Lessons from the Great East Japan Earthquake," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 429-436.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.