IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v44y1990i3p337-348.html
   My bibliography  Save this item

The discrete lot-sizing and scheduling problem

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
  2. François Vanderbeck, 1998. "Lot-Sizing with Start-Up Times," Management Science, INFORMS, vol. 44(10), pages 1409-1425, October.
  3. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
  4. Rohaninejad, Mohammad & Hanzálek, Zdeněk, 2023. "Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches," International Journal of Production Economics, Elsevier, vol. 263(C).
  5. Wichmann, Matthias Gerhard & Johannes, Christoph & Spengler, Thomas Stefan, 2019. "Energy-oriented Lot-Sizing and Scheduling considering energy storages," International Journal of Production Economics, Elsevier, vol. 216(C), pages 204-214.
  6. Jordan, Carsten, 1995. "A two-phase genetic algorithm to solve variants of the batch sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 363, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  7. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Other publications TiSEM 0cf065b7-4836-4cdd-9317-0, Tilburg University, School of Economics and Management.
  8. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
  9. Fandel, Gunter & Stammen-Hegene, Cathrin, 2006. "Simultaneous lot sizing and scheduling for multi-product multi-level production," International Journal of Production Economics, Elsevier, vol. 104(2), pages 308-316, December.
  10. Drexl, Andreas & Haase, Knut, 1995. "Proportional lotsizing and scheduling," International Journal of Production Economics, Elsevier, vol. 40(1), pages 73-87, June.
  11. Hartmut Stadtler, 2003. "Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows," Operations Research, INFORMS, vol. 51(3), pages 487-502, June.
  12. Tempelmeier, Horst & Buschkühl, Lisbeth, 2008. "Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource," International Journal of Production Economics, Elsevier, vol. 113(1), pages 401-412, May.
  13. Kimms, Alf & Drexl, Andreas, 1996. "Shortcomings of MRP II and a new planning meta-method," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 404, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  14. Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  15. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
  16. Kimms, Alf, 1996. "Improved lower bounds for the proportional lot sizing and scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 414, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  17. Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  18. Ozdamar, Linet & Birbil, Sevket Ilker, 1998. "Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions," European Journal of Operational Research, Elsevier, vol. 110(3), pages 525-547, November.
  19. Kimms, A., 1996. "Multi-level, single-machine lot sizing and scheduling (with initial inventory)," European Journal of Operational Research, Elsevier, vol. 89(1), pages 86-99, February.
  20. Carsten Jordan & Andreas Drexl, 1998. "Discrete Lotsizing and Scheduling by Batch Sequencing," Management Science, INFORMS, vol. 44(5), pages 698-713, May.
  21. Masoumeh Mahdieh & Alistair Clark & Mehdi Bijari, 2018. "A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations," Flexible Services and Manufacturing Journal, Springer, vol. 30(4), pages 884-923, December.
  22. Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
  23. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
  24. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
  25. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
  26. Alyne Toscano & Deisemara Ferreira & Reinaldo Morabito, 2019. "A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 142-173, March.
  27. Alf Kimms, 1998. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Schmalenbach Journal of Business Research, Springer, vol. 50(7), pages 641-655, July.
  28. Haase, Knut, 1994. "Capacitated lot-sizing with sequence dependent setup costs," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 340, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  29. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Research Memorandum FEW 579, Tilburg University, School of Economics and Management.
  30. Haase, Knut & Kimms, Alf, 1996. "Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 393, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  31. Andrew J. Miller & Laurence A. Wolsey, 2003. "Tight Mip Formulation for Multi-Item Discrete Lot-Sizing Problems," Operations Research, INFORMS, vol. 51(4), pages 557-565, August.
  32. Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
  33. Martin Wörbelauer & Herbert Meyr & Bernardo Almada-Lobo, 2019. "Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 1-43, March.
  34. Yokoyama, Masao, 1999. "The eclectic model for stochastic dynamic production cycling problem," International Journal of Production Economics, Elsevier, vol. 60(1), pages 359-367, April.
  35. Suerie, Christopher, 2006. "Modeling of period overlapping setup times," European Journal of Operational Research, Elsevier, vol. 174(2), pages 874-886, October.
  36. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
  37. Kimms, Alf & Drexl, Andreas, 1996. "Proportional lot sizing and scheduling: Some extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 407, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  38. Drexl, Andreas & Haase, Knut, 1997. "Vorbeugende Instandhaltung und Eilaufträge in der Produktionsplanung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 450, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  39. Lee, Younsoo & Lee, Kyungsik, 2020. "Lot-sizing and scheduling in flat-panel display manufacturing process," Omega, Elsevier, vol. 93(C).
  40. Schirmer, Andreas, 1996. "New insights on the complexity of resource-constrained project scheduling: Two cases of multi-mode scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 391, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  41. Gaetan Belvaux & Laurence A. Wolsey, 2000. "bc --- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems," Management Science, INFORMS, vol. 46(5), pages 724-738, May.
  42. Kumar Rajaram & Uday S. Karmarkar, 2002. "Product Cycling With Uncertain Yields: Analysis and Application to the Process Industry," Operations Research, INFORMS, vol. 50(4), pages 680-691, August.
  43. Jordan, Carsten & Drexl, Andreas, 1994. "Lotsizing and scheduling by batch sequencing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 343, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  44. Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
  45. Drexl, Andreas & Kimms, Alf, 1996. "Lot sizing and scheduling: Survey and extensions," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 421, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  46. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  47. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  48. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
  49. Otto, Alena & Li, Xiyu, 2020. "Product sequencing in multiple-piece-flow assembly lines," Omega, Elsevier, vol. 91(C).
  50. Gicquel, C. & Lisser, A. & Minoux, M., 2014. "An evaluation of semidefinite programming based approaches for discrete lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 237(2), pages 498-507.
  51. Bruggemann, Wolfgang & Jahnke, Hermann, 2000. "The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability," European Journal of Operational Research, Elsevier, vol. 124(3), pages 511-528, August.
  52. Kimms, Alf, 1996. "A genetic algorithm for multi-level, multi-machine lot sizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 415, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  53. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
  54. Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
  55. BELVAUX, Gaetan & WOLSEY, Laurence A., 1998. "Lot-sizing problems: modelling issues and a specialized branch-and-cut system BC-PROD," LIDAM Discussion Papers CORE 1998049, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  56. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
  57. Weidenhiller, Andreas & Jodlbauer, Herbert, 2009. "Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 199(1), pages 139-149, November.
  58. Drexl, Andreas & Fleischmann, B. & Günther, H.-O. & Stadtler, H. & Tempelmeier, H., 1993. "Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 315, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  59. Drexl, Andreas & Haase, Knut, 1992. "A new type of model for multi-item capacitated dynamic lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 286, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  60. Drexl, Andreas & Haase, Knut, 1993. "Sequential-analysis-based randomized-regret-methods for lotsizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 323, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  61. Kaczmarczyk, Waldemar, 2020. "Valid inequalities for proportional lot-sizing and scheduling problem with fictitious microperiods," International Journal of Production Economics, Elsevier, vol. 219(C), pages 236-247.
  62. Ferreira, Deisemara & Morabito, Reinaldo & Rangel, Socorro, 2009. "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 196(2), pages 697-706, July.
  63. Kimms, Alf & Drexl, Andreas, 1996. "Some insights into proportional lot sizing and scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 406, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  64. Salomon, Marc & Solomon, Marius M. & Van Wassenhove, Luk N. & Dumas, Yvan & Dauzere-Peres, Stephane, 1997. "Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows," European Journal of Operational Research, Elsevier, vol. 100(3), pages 494-513, August.
  65. Haase, Knut & Göpfert, Lars, 1995. "Engpaßorientierte Fertigungssteuerung bei reihenfolgeabhängigen Rüstvorgängen in einem Unternehmen der Satz- und Drucktechnik," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 373, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  66. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.
  67. Matthias Gerhard Wichmann & Christoph Johannes & Thomas Stefan Spengler, 2019. "An extension of the general lot-sizing and scheduling problem (GLSP) with time-dependent energy prices," Journal of Business Economics, Springer, vol. 89(5), pages 481-514, July.
  68. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
  69. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
  70. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.