IDEAS home Printed from https://ideas.repec.org/a/spr/operea/v23y2023i2d10.1007_s12351-023-00772-y.html
   My bibliography  Save this article

Simultaneous lot sizing and scheduling in the animal feed premix industry

Author

Listed:
  • Miloš Milenković

    (The Faculty of Transport and Traffic Engineering)

  • Susana Val

    (Zaragoza Logistic Center)

  • Nebojša Bojović

    (The Faculty of Transport and Traffic Engineering)

Abstract

Feed represents a significant contributor to the total costs of animal production. Improved efficiency of animal food production may reduce feed cost and gain a positive impact on supply as well as the demand in animal food production. In this paper a discrete-time MILP-based scheduling model is proposed for optimization of animal food premix production process. The objective of the model is to minimize the total production and manpower costs while maximizing the utilization of parallel equipment units at the same time. The set of constraints captures all operational constraints from a specific production plant. Testing on a real case study proves the superiority of proposed approach in comparison to the current practice and paves the way for its industrial implementation. A framework for industrial application of the proposed model is described. In terms of capabilities, the proposed tailor-made solution represents a superior alternative to the general purpose software currently available on the market.

Suggested Citation

  • Miloš Milenković & Susana Val & Nebojša Bojović, 2023. "Simultaneous lot sizing and scheduling in the animal feed premix industry," Operational Research, Springer, vol. 23(2), pages 1-40, June.
  • Handle: RePEc:spr:operea:v:23:y:2023:i:2:d:10.1007_s12351-023-00772-y
    DOI: 10.1007/s12351-023-00772-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12351-023-00772-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12351-023-00772-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Richard L. Daniels & Joseph B. Mazzola, 1994. "Flow Shop Scheduling with Resource Flexibility," Operations Research, INFORMS, vol. 42(3), pages 504-522, June.
    2. Martinez, Michael A. & Newman, Alexandra M., 2011. "A solution approach for optimizing long- and short-term production scheduling at LKAB's Kiruna mine," European Journal of Operational Research, Elsevier, vol. 211(1), pages 184-197, May.
    3. Fang, Kan & Wang, Shijin & Pinedo, Michael L. & Chen, Lin & Chu, Feng, 2021. "A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions," European Journal of Operational Research, Elsevier, vol. 291(1), pages 128-146.
    4. Ferreira, Deisemara & Morabito, Reinaldo & Rangel, Socorro, 2009. "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 196(2), pages 697-706, July.
    5. Ríos-Solís, Yasmín Á & Ibarra-Rojas, Omar J. & Cabo, Marta & Possani, Edgar, 2020. "A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production," European Journal of Operational Research, Elsevier, vol. 284(3), pages 861-873.
    6. Richard L. Daniels & Joseph B. Mazzola & Dailun Shi, 2004. "Flow Shop Scheduling with Partial Resource Flexibility," Management Science, INFORMS, vol. 50(5), pages 658-669, May.
    7. Seifi, Cinna & Schulze, Marco & Zimmermann, Jürgen, 2021. "A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers," European Journal of Operational Research, Elsevier, vol. 292(1), pages 27-42.
    8. Olivier Guyon & Pierre Lemaire & Éric Pinson & David Rivreau, 2014. "Solving an integrated job-shop problem with human resource constraints," Annals of Operations Research, Springer, vol. 213(1), pages 147-171, February.
    9. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2014. "Modeling lotsizing and scheduling problems with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 239(3), pages 644-662.
    10. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.
    11. Marco Schulze & Jürgen Zimmermann, 2017. "Staff and machine shift scheduling in a German potash mine," Journal of Scheduling, Springer, vol. 20(6), pages 635-656, December.
    12. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    13. Martínez, Karim Pérez & Morabito, Reinaldo & Toso, Eli Angela Vitor, 2018. "A coupled process configuration, lot-sizing and scheduling model for production planning in the molded pulp industry," International Journal of Production Economics, Elsevier, vol. 204(C), pages 227-243.
    14. Kopanos, Georgios M. & Méndez, Carlos A. & Puigjaner, Luis, 2010. "MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry," European Journal of Operational Research, Elsevier, vol. 207(2), pages 644-655, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mac Cawley, Alejandro & Maturana, Sergio & Pascual, Rodrigo & Tortorella, Guilherme Luz, 2022. "Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach," European Journal of Operational Research, Elsevier, vol. 303(2), pages 819-839.
    2. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    3. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.
    4. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    5. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
    6. Lee, Younsoo & Lee, Kyungsik, 2023. "Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 310(1), pages 201-216.
    7. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    8. Dražen Popović & Nenad Bjelić & Milorad Vidović & Branislava Ratković, 2023. "Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective," Mathematics, MDPI, vol. 11(9), pages 1-23, April.
    9. Cinna Seifi & Marco Schulze & Jürgen Zimmermann, 2021. "Solution procedures for block selection and sequencing in flat-bedded potash underground mines," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(2), pages 409-440, June.
    10. Dirk Briskorn & Philipp Zeise, 2019. "A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 895-942, December.
    11. Gultekin, Hakan, 2012. "Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibility," International Journal of Production Economics, Elsevier, vol. 140(2), pages 900-911.
    12. Alyne Toscano & Deisemara Ferreira & Reinaldo Morabito, 2019. "A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 142-173, March.
    13. Martínez, Karim Pérez & Morabito, Reinaldo & Toso, Eli Angela Vitor, 2018. "A coupled process configuration, lot-sizing and scheduling model for production planning in the molded pulp industry," International Journal of Production Economics, Elsevier, vol. 204(C), pages 227-243.
    14. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    15. Amorim, P. & Günther, H.-O. & Almada-Lobo, B., 2012. "Multi-objective integrated production and distribution planning of perishable products," International Journal of Production Economics, Elsevier, vol. 138(1), pages 89-101.
    16. Herbert Meyr & Mirko Kiel, 2022. "Minimizing setups and waste when printing labels of consumer goods," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(3), pages 733-761, September.
    17. Ma, Ran & Guo, Sainan & Miao, Cuixia, 2021. "A semi-online algorithm and its competitive analysis for parallel-machine scheduling problem with rejection," Applied Mathematics and Computation, Elsevier, vol. 392(C).
    18. King, Barry & Goycoolea, Marcos & Newman, A., 2017. "Optimizing the open pit-to-underground mining transition," European Journal of Operational Research, Elsevier, vol. 257(1), pages 297-309.
    19. Dayal Madhukar & Verma, Sanjay, 2015. "Multi-processor Exact Procedures for Regular Measures of the Multi-mode RCPSP," IIMA Working Papers WP2015-03-25, Indian Institute of Management Ahmedabad, Research and Publication Department.
    20. Nakousi, C. & Pascual, R. & Anani, A. & Kristjanpoller, F. & Lillo, P., 2018. "An asset-management oriented methodology for mine haul-fleet usage scheduling," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 336-344.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:23:y:2023:i:2:d:10.1007_s12351-023-00772-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.