A coupled process configuration, lot-sizing and scheduling model for production planning in the molded pulp industry

Author

Listed:
  • Martínez, Karim Pérez
  • Morabito, Reinaldo
  • Toso, Eli Angela Vitor

Abstract

This paper proposes an application-oriented model for a coupled process configuration, lot-sizing and scheduling problem in the molded pulp industry. In this case, products are obtained by alternative process configurations, which can produce one or more types of product simultaneously. A process configuration consists of defining a feasible setup state for the main components of the production line, i.e., the molding machine, where molds to shape the products are attached, and a set of conveyors, where products are transported. Production quantities depend on the configurations selected and the time that each one is used over the planning horizon. The number of possible configurations is large and sensitive to the characteristics of the production environment, the size of the molding machine and the number of conveyors. Therefore, determining all possibilities beforehand is a challenging and extensive task. We propose a novel formulation to support production decisions in molded pulp companies, which generates the process configurations implicitly at the same time that lot-sizing and sequencing decisions are made. This optimization problem involves challenging operational and synchronization constraints, and sequencing decisions which include three types of setups. The objective is to minimize the total setup, inventory and backlogging costs. Several sets of instances based on real data and market information were tested. Computational experiments using a commercial Mixed Integer Programming (MIP) solver show the capability of this approach to represent the problem decisions and to provide production schedules for different production environments. Comparisons with real schedules and others formulations show the practical savings and the advantages of this formulation over enumerating modeling approaches. A simplified version of this new formulation is also presented to solve more efficiently particular problem instances. In addition, a heuristic solution strategy is proposed to find feasible production plans for all data sets in shorter computing times.

Suggested Citation

  • Martínez, Karim Pérez & Morabito, Reinaldo & Toso, Eli Angela Vitor, 2018. "A coupled process configuration, lot-sizing and scheduling model for production planning in the molded pulp industry," International Journal of Production Economics, Elsevier, vol. 204(C), pages 227-243.
  • Handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:227-243
    DOI: 10.1016/j.ijpe.2018.07.018
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318302834
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.07.018?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Valerio de Carvalho, J. M., 2002. "LP models for bin packing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 141(2), pages 253-273, September.
    2. Almada-Lobo, Bernardo & Oliveira, José F. & Carravilla, Maria Antónia, 2008. "Production planning and scheduling in the glass container industry: A VNS approach," International Journal of Production Economics, Elsevier, vol. 114(1), pages 363-375, July.
    3. José Roberto Dale Luche & Reinaldo Morabito & Vitória Pureza, 2009. "Combining Process Selection And Lot Sizing Models For Production Scheduling Of Electrofused Grains," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 26(03), pages 421-443.
    4. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    5. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2014. "Modeling lotsizing and scheduling problems with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 239(3), pages 644-662.
    6. P. C. Gilmore & R. E. Gomory, 1961. "A Linear Programming Approach to the Cutting-Stock Problem," Operations Research, INFORMS, vol. 9(6), pages 849-859, December.
    7. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.
    8. P. C. Gilmore & R. E. Gomory, 1963. "A Linear Programming Approach to the Cutting Stock Problem---Part II," Operations Research, INFORMS, vol. 11(6), pages 863-888, December.
    9. Fleischmann, B. & Meyr, H., 1997. "The General Lotsizing and Scheduling Problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36068, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Gothe-Lundgren, Maud & T. Lundgren, Jan & A. Persson, Jan, 2002. "An optimization model for refinery production scheduling," International Journal of Production Economics, Elsevier, vol. 78(3), pages 255-270, August.
    11. Hajizadeh, Iman & Lee, Chi-Guhn, 2007. "Alternative configurations for cutting machines in a tube cutting mill," European Journal of Operational Research, Elsevier, vol. 183(3), pages 1385-1396, December.
    12. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    13. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Herbert Meyr & Mirko Kiel, 2022. "Minimizing setups and waste when printing labels of consumer goods," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(3), pages 733-761, September.
    2. Ma, Yujie & Du, Gang & Jiao, Roger J., 2020. "Optimal crowdsourcing contracting for reconfigurable process planning in open manufacturing: A bilevel coordinated optimization approach," International Journal of Production Economics, Elsevier, vol. 228(C).
    3. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
    4. Miloš Milenković & Susana Val & Nebojša Bojović, 2023. "Simultaneous lot sizing and scheduling in the animal feed premix industry," Operational Research, Springer, vol. 23(2), pages 1-40, June.
    5. Silva, Eduardo M. & Melega, Gislaine M. & Akartunalı, Kerem & de Araujo, Silvio A., 2023. "Formulations and theoretical analysis of the one-dimensional multi-period cutting stock problem with setup cost," European Journal of Operational Research, Elsevier, vol. 304(2), pages 443-460.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    2. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    3. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    4. Gislaine Mara Melega & Silvio Alexandre de Araujo & Reinaldo Morabito, 2020. "Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems," Annals of Operations Research, Springer, vol. 295(2), pages 695-736, December.
    5. Alyne Toscano & Deisemara Ferreira & Reinaldo Morabito, 2019. "A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 142-173, March.
    6. Meyr, Herbert & Mann, Matthias, 2013. "A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines," European Journal of Operational Research, Elsevier, vol. 229(3), pages 718-731.
    7. Mac Cawley, Alejandro & Maturana, Sergio & Pascual, Rodrigo & Tortorella, Guilherme Luz, 2022. "Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach," European Journal of Operational Research, Elsevier, vol. 303(2), pages 819-839.
    8. Dražen Popović & Nenad Bjelić & Milorad Vidović & Branislava Ratković, 2023. "Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective," Mathematics, MDPI, vol. 11(9), pages 1-23, April.
    9. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    10. Sônia Poltroniere & Kelly Poldi & Franklina Toledo & Marcos Arenales, 2008. "A coupling cutting stock-lot sizing problem in the paper industry," Annals of Operations Research, Springer, vol. 157(1), pages 91-104, January.
    11. Silva, Eduardo M. & Melega, Gislaine M. & Akartunalı, Kerem & de Araujo, Silvio A., 2023. "Formulations and theoretical analysis of the one-dimensional multi-period cutting stock problem with setup cost," European Journal of Operational Research, Elsevier, vol. 304(2), pages 443-460.
    12. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.
    13. de Lima, Vinícius L. & Alves, Cláudio & Clautiaux, François & Iori, Manuel & Valério de Carvalho, José M., 2022. "Arc flow formulations based on dynamic programming: Theoretical foundations and applications," European Journal of Operational Research, Elsevier, vol. 296(1), pages 3-21.
    14. Herbert Meyr & Mirko Kiel, 2022. "Minimizing setups and waste when printing labels of consumer goods," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(3), pages 733-761, September.
    15. Kelly Cristina Poldi & Silvio Alexandre Araujo, 2016. "Mathematical models and a heuristic method for the multiperiod one-dimensional cutting stock problem," Annals of Operations Research, Springer, vol. 238(1), pages 497-520, March.
    16. Sierra-Paradinas, María & Soto-Sánchez, Óscar & Alonso-Ayuso, Antonio & Martín-Campo, F. Javier & Gallego, Micael, 2021. "An exact model for a slitting problem in the steel industry," European Journal of Operational Research, Elsevier, vol. 295(1), pages 336-347.
    17. Rohaninejad, Mohammad & Hanzálek, Zdeněk, 2023. "Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches," International Journal of Production Economics, Elsevier, vol. 263(C).
    18. Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
    19. Oliveira, Washington A. & Fiorotto, Diego J. & Song, Xiang & Jones, Dylan F., 2021. "An extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problem," European Journal of Operational Research, Elsevier, vol. 295(3), pages 996-1007.
    20. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:204:y:2018:i:c:p:227-243. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.