Abstract

Workload control (WLC) is a lean oriented system that reduces queues and waiting times, by imposing a cap to the workload released to the shop floor. Unfortunately, WLC performance does not systematically outperform that of push operating systems, with undersaturated utilizations levels and optimized dispatching rules. To address this issue, many scientific works made use of complex job-release mechanisms and sophisticated dispatching rules, but this makes WLC too complicated for industrial applications. So, in this study, we propose a complementary approach. At first, to reduce queuing time variability, we introduce a simple WLC system; next we integrate it with a predictive tool that, based on the system state, can accurately forecast the total time needed to manufacture and deliver a job. Due to the non-linearity among dependent and independent variables, forecasts are made using a multi-layer-perceptron; yet, to have a comparison, the effectiveness of both linear and non-linear multi regression model has been tested too. Anyhow, if due dates are endogenous (i.e. set by the manufacturer), they can be directly bound to this internal estimate. Conversely, if they are exogenous (i.e. set by the customer), this approach may not be enough to minimize the percentage of tardy jobs. So, we also propose a negotiation scheme, which can be used to extend exogenous due dates considered too tight, with respect to the internal estimate. This is the main contribution of the paper, as it makes the forecasting approach truly useful in many industrial applications. To test our approach, we simulated a 6-machines job-shop controlled with WLC and equipped with the proposed forecasting system. Obtained performances, namely WIP levels, percentage of tardy jobs and negotiated due dates, were compared with those of a set classical benchmark, and demonstrated the robustness and the quality of our approach, which ensures minimal delays.

Suggested Citation

  • Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
  • Handle: RePEc:spr:flsman:v:33:y:2021:i:4:d:10.1007_s10696-020-09396-2
    DOI: 10.1007/s10696-020-09396-2
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10696-020-09396-2
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10696-020-09396-2?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    2. M. Rosário Moreira & Rui Alves, 2006. "A new input-output control order release mechanism: how workload control improves manufacturing operations in a job shop," FEP Working Papers 210, Universidade do Porto, Faculdade de Economia do Porto.
    3. Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
    4. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    5. Harrod, Steven & Kanet, John J., 2013. "Applying work flow control in make-to-order job shops," International Journal of Production Economics, Elsevier, vol. 143(2), pages 620-626.
    6. Matthias Thürer & Mark Stevenson & Cristovao Silva & Martin J. Land & Lawrence D. Fredendall & Steven A. Melnyk, 2014. "Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release," Production and Operations Management, Production and Operations Management Society, vol. 23(3), pages 463-476, March.
    7. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    8. MILLER, Bruce L., 1969. "A queueing reward system with several customer classes," LIDAM Reprints CORE 41, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    9. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    10. Bruce L. Miller, 1969. "A Queueing Reward System with Several Customer Classes," Management Science, INFORMS, vol. 16(3), pages 234-245, November.
    11. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    12. Land, Martin J., 2009. "Cobacabana (control of balance by card-based navigation): A card-based system for job shop control," International Journal of Production Economics, Elsevier, vol. 117(1), pages 97-103, January.
    13. van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
    14. Matthias Thürer & Mark Stevenson & Martin J. Land & Larry D. Fredendall, 2019. "On the combined effect of due date setting, order release, and output control: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1741-1755, March.
    15. M. Rosário Moreira & Rui Alves, 2006. "Does Order Negotiation Improve The Job-Shop Workload Control?," FEP Working Papers 213, Universidade do Porto, Faculdade de Economia do Porto.
    16. Nuno O. Fernandes & Martin J. Land & S. Carmo-Silva, 2016. "Aligning workload control theory and practice: lot splitting and operation overlapping issues," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 2965-2975, May.
    17. K. C. Bhosale & P. J. Pawar, 2019. "Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)," Flexible Services and Manufacturing Journal, Springer, vol. 31(2), pages 381-423, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Weiwei Chen & Siyang Gao & Michael Pinedo & Lixin Tang, 2022. "Modeling and data analytics in manufacturing and supply chain operations," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 235-237, June.
    2. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    2. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    3. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
    4. Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
    5. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
    6. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
    7. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
    8. Thürer, Matthias & Stevenson, Mark, 2021. "Improving superfluous load avoidance release (SLAR): A new load-based SLAR mechanism," International Journal of Production Economics, Elsevier, vol. 231(C).
    9. Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
    10. Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
    11. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    12. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    13. Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
    14. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    15. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
    16. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    17. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
    18. Yarong Chen & Hongming Zhou & Peiyu Huang & FuhDer Chou & Shenquan Huang, 2022. "A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance," Annals of Operations Research, Springer, vol. 311(1), pages 65-79, April.
    19. Thürer, Matthias & Stevenson, Mark & Protzman, Charles W., 2015. "COBACABANA (Control of Balance by Card Based Navigation): An alternative to kanban in the pure flow shop?," International Journal of Production Economics, Elsevier, vol. 166(C), pages 143-151.
    20. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:33:y:2021:i:4:d:10.1007_s10696-020-09396-2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.