IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v67y2016i8d10.1057_jors.2016.13.html
   My bibliography  Save this article

Joint-replenishment problem under stochastic demands with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost

Author

Listed:
  • Marcello Braglia

    (Università di Pisa)

  • Davide Castellano

    (Università di Pisa)

  • Marco Frosolini

    (Università di Pisa)

Abstract

In this paper, we study the periodic-review stochastic Joint-replenishment Problem (JRP), with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost. The purpose is to determine a strict cyclic replenishment policy, the length of lead times, and the major ordering cost that minimize the total system cost. We first present an effective heuristic algorithm to approach the problem. However, results illustrate how computationally expensive the algorithm would be for a practical application. Hence, we then propose an efficient and more practically applicable solution procedure. In particular, approximating part of the cost function with its second-order Taylor series expansion, we obtain an expression that resembles the deterministic cost structure. Therefore, the problem can be approached exploiting a standard algorithm suitable for the deterministic JRP. Numerical tests compare the performances of the algorithms developed and show that the approximated approach is actually promising for a practical application.

Suggested Citation

  • Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "Joint-replenishment problem under stochastic demands with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1108-1120, August.
  • Handle: RePEc:pal:jorsoc:v:67:y:2016:i:8:d:10.1057_jors.2016.13
    DOI: 10.1057/jors.2016.13
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/jors.2016.13
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/jors.2016.13?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Wang, Daqin & Tang, Ou, 2014. "Dynamic inventory rationing with mixed backorders and lost sales," International Journal of Production Economics, Elsevier, vol. 149(C), pages 56-67.
    3. Eynan, Amit & Kropp, Dean H., 2007. "Effective and simple EOQ-like solutions for stochastic demand periodic review systems," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1135-1143, August.
    4. Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
    5. Tsao, Yu-Chung & Sheen, Gwo-Ji, 2012. "A multi-item supply chain with credit periods and weight freight cost discounts," International Journal of Production Economics, Elsevier, vol. 135(1), pages 106-115.
    6. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    7. Amaya, Ciro Alberto & Carvajal, Jimmy & Castaño, Fabian, 2013. "A heuristic framework based on linear programming to solve the constrained joint replenishment problem (C-JRP)," International Journal of Production Economics, Elsevier, vol. 144(1), pages 243-247.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xuefei Shi & Haiyan Wang, 2022. "Design of the cost allocation rule for joint replenishment to an overseas warehouse with a piecewise linear holding cost rate," Operational Research, Springer, vol. 22(5), pages 4905-4929, November.
    2. Cui, Ligang & Deng, Jie & Liu, Rui & Xu, Dongyang & Zhang, Yajun & Xu, Maozeng, 2020. "A stochastic multi-item replenishment and delivery problem with lead-time reduction initiatives and the solving methodologies," Applied Mathematics and Computation, Elsevier, vol. 374(C).
    3. Zhang, Ren-Qian & Yi, Meng & Wang, Qi-Qi & Xiang, Chen, 2018. "Polynomial algorithm of inventory model with complete backordering and correlated demand caused by cross-selling," International Journal of Production Economics, Elsevier, vol. 199(C), pages 193-198.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huang, Di & Ouyang, Lian Qun & Zhou, Hong, 2012. "Note on: Managing multi-echelon multi-item channels with trade allowances under credit period," International Journal of Production Economics, Elsevier, vol. 138(1), pages 117-124.
    2. Davide Castellano & Mosè Gallo & Liberatina C. Santillo, 2021. "A periodic review policy for a coordinated single vendor-multiple buyers supply chain with controllable lead time and distribution-free approach," 4OR, Springer, vol. 19(3), pages 347-388, September.
    3. Cui, Ligang & Deng, Jie & Liu, Rui & Xu, Dongyang & Zhang, Yajun & Xu, Maozeng, 2020. "A stochastic multi-item replenishment and delivery problem with lead-time reduction initiatives and the solving methodologies," Applied Mathematics and Computation, Elsevier, vol. 374(C).
    4. Ji Seong Noh & Jong Soo Kim & Biswajit Sarkar, 2019. "Stochastic joint replenishment problem with quantity discounts and minimum order constraints," Operational Research, Springer, vol. 19(1), pages 151-178, March.
    5. Nima Kazemi & Salwa Hanim Abdul-Rashid & Ehsan Shekarian & Eleonora Bottani & Roberto Montanari, 2016. "A fuzzy lot-sizing problem with two-stage composite human learning," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 5010-5025, August.
    6. Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
    7. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
    8. Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
    9. Gharaei, Abolfazl & Almehdawe, Eman, 2020. "Economic growing quantity," International Journal of Production Economics, Elsevier, vol. 223(C).
    10. Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    11. Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
    12. Nguyen, Christine & Dessouky, Maged & Toriello, Alejandro, 2014. "Consolidation strategies for the delivery of perishable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 108-121.
    13. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    14. He-Yau Kang & Amy H.I. Lee & Chien-Wei Wu & Cheng-Han Lee, 2017. "An efficient method for dynamic-demand joint replenishment problem with multiple suppliers and multiple vehicles," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1065-1084, February.
    15. Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
    16. Mou, Qiong & Cheng, Yunlong & Liao, Huchang, 2017. "A note on “lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand”," International Journal of Production Economics, Elsevier, vol. 193(C), pages 827-831.
    17. Jen-Yen Lin & Ming-Jong Yao, 2020. "The joint replenishment problem with trade credits," Journal of Global Optimization, Springer, vol. 76(2), pages 347-382, February.
    18. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    19. Huang, Shupeng & Potter, Andrew & Eyers, Daniel & Li, Qinyun, 2021. "The influence of online review adoption on the profitability of capacitated supply chains," Omega, Elsevier, vol. 105(C).
    20. Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:67:y:2016:i:8:d:10.1057_jors.2016.13. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.