IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v229y2020ics0925527320301699.html
   My bibliography  Save this article

Spatial-temporal hedging coordination in prefabricated housing production

Author

Listed:
  • Zhai, Yue
  • Choi, Tsan-Ming
  • Shao, Saijun
  • Xu, Su Xiu
  • Huang, George Q.

Abstract

This paper studies the spatial-temporal hedging coordination problem. In the prefabricated housing production, the heavy double handling cost is the major reason that causes profit loss of project manager. The spatial-temporal method is capable of mitigating this double handling cost by reducing assembly time uncertainty and on-site congestion probability substantially. However, adopting hedging methods adds extra cost and pressure to the adopters. To encourage the building contractor who makes the temporal hedging decision to choose a larger assembly time hedging (ATH) amount, a hedging effort-sharing (HES) mechanism is proposed. In this research, we built an analytical model to investigate how HES mechanism affects spatial-temporal hedging decisions, the performance of the building contractor, project manager as well as the whole supply chain. Three scenarios with fixed HES terms under decentralized setting are examined: (I) Nash model, (II) Building contractor led Stackelberg model, and (III) Project manager led Stackelberg model. Closed-form results regarding the optimal spatial-temporal hedging decisions are obtained. Besides, we derive the threshold of the HES terms, under which a win-win coordination can be achieved. Furthermore, an integrated setting with negotiable HES terms is explored. We derive the optimal values of HES terms, which incents the individual optimal spatial-temporal hedging decisions identical with that obtained in the centralized setting. By conducting numerical studies, it is found that a higher site congestion probability and a lower demand uncertainty encourage the project manager to share more ATH effort, while a lower unit ATH cost and higher site space hedging effort-sharing rate entice the building contractor to burden more ATH effort. Surprisingly, in the proposed HES mechanism, the building contractor's profit is increasing in site congestion probability and the project manager's profit increases in the demand uncertainty.

Suggested Citation

  • Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
  • Handle: RePEc:eee:proeco:v:229:y:2020:i:c:s0925527320301699
    DOI: 10.1016/j.ijpe.2020.107792
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527320301699
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2020.107792?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ernst, Ricardo & Powell, Stephen G., 1998. "Manufacturer incentives to improve retail service levels," European Journal of Operational Research, Elsevier, vol. 104(3), pages 437-450, February.
    2. Oussama Ben-Ammar & Belgacem Bettayeb & Alexandre Dolgui, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," Post-Print hal-02415332, HAL.
    3. Becker-Peth, Michael & Thonemann, Ulrich W., 2016. "Reference points in revenue sharing contracts—How to design optimal supply chain contracts," European Journal of Operational Research, Elsevier, vol. 249(3), pages 1033-1049.
    4. Yue Zhai & Ray Y. Zhong & Zhi Li & George Huang, 2017. "Production lead-time hedging and coordination in prefabricated construction supply chain management," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 3984-4002, July.
    5. Leng, Mingming & Zhu, An, 2009. "Side-payment contracts in two-person nonzero-sum supply chain games: Review, discussion and applications," European Journal of Operational Research, Elsevier, vol. 196(2), pages 600-618, July.
    6. Chen, Xu & Wang, Xiaojun & Chan, Hing Kai, 2016. "Channel coordination through subsidy contract design in the mobile phone industry," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 97-104.
    7. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    8. Li, Gang & Fan, Huan & Lee, Peter K.C. & Cheng, T.C.E., 2015. "Joint supply chain risk management: An agency and collaboration perspective," International Journal of Production Economics, Elsevier, vol. 164(C), pages 83-94.
    9. Yue Zhai & Yelin Fu & Gangyan Xu & George Huang, 2019. "Multi-period hedging and coordination in a prefabricated construction supply chain," International Journal of Production Research, Taylor & Francis Journals, vol. 57(7), pages 1949-1971, April.
    10. Ma, Peng & Wang, Haiyan & Shang, Jennifer, 2013. "Contract design for two-stage supply chain coordination: Integrating manufacturer-quality and retailer-marketing efforts," International Journal of Production Economics, Elsevier, vol. 146(2), pages 745-755.
    11. Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
    12. Choi, Tsan-Ming, 2018. "Launching the right new product among multiple product candidates in fashion: Optimal choice and coordination with risk consideration," International Journal of Production Economics, Elsevier, vol. 202(C), pages 162-171.
    13. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    14. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    15. Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
    16. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    17. Hu, Yinan & Guan, Yongpei & Liu, Tieming, 2011. "Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games," European Journal of Operational Research, Elsevier, vol. 210(2), pages 231-240, April.
    18. Salameh, M. K. & Ghattas, R. E., 2001. "Optimal just-in-time buffer inventory for regular preventive maintenance," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 157-161, December.
    19. Xin Xu & Yao Zhao & Ching-Yu Chen, 2016. "Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects," Annals of Operations Research, Springer, vol. 241(1), pages 225-247, June.
    20. Pero, Margherita & Stößlein, Martin & Cigolini, Roberto, 2015. "Linking product modularity to supply chain integration in the construction and shipbuilding industries," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 602-615.
    21. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    22. Zhai, Yue & Zhong, Ray Y. & Huang, George Q., 2018. "Buffer space hedging and coordination in prefabricated construction supply chain management," International Journal of Production Economics, Elsevier, vol. 200(C), pages 192-206.
    23. Gary D. Eppen, 1979. "Note--Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem," Management Science, INFORMS, vol. 25(5), pages 498-501, May.
    24. Hsu, Shu-Lu & Lee, Chun Chen, 2009. "Replenishment and lead time decisions in manufacturer-retailer chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(3), pages 398-408, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
    2. Zhaoqing Yu & Jiakun Sun, 2023. "Green Cooperation Strategy of Prefabricated Building Supply Chain Based on Smart Construction Management Platform," Sustainability, MDPI, vol. 15(22), pages 1-19, November.
    3. Wen Jiang & Menglin Liu & Lu Gan & Chong Wang, 2021. "Optimal Pricing, Ordering, and Coordination for Prefabricated Building Supply Chain with Power Structure and Flexible Cap-and-Trade," Mathematics, MDPI, vol. 9(19), pages 1-22, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
    2. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    3. Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
    4. Yue Zhai & Ray Y. Zhong & Zhi Li & George Huang, 2017. "Production lead-time hedging and coordination in prefabricated construction supply chain management," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 3984-4002, July.
    5. Xiao, Tiaojun & Choi, Tsan-Ming & Cheng, T.C.E., 2016. "Delivery leadtime and channel structure decisions for make-to-order duopoly under different game scenarios," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 113-129.
    6. Zhai, Yue & Zhong, Ray Y. & Huang, George Q., 2018. "Buffer space hedging and coordination in prefabricated construction supply chain management," International Journal of Production Economics, Elsevier, vol. 200(C), pages 192-206.
    7. Sajjad Aslani Khiavi & Hamid Khaloozadeh & Fahimeh Soltanian, 2021. "Suboptimal sliding manifold For nonlinear supply chain with time delay," Journal of Combinatorial Optimization, Springer, vol. 42(1), pages 151-173, July.
    8. Pei Dang & Zhanwen Niu & Shang Gao & Lei Hou & Guomin Zhang, 2020. "Critical Factors Influencing the Sustainable Construction Capability in Prefabrication of Chinese Construction Enterprises," Sustainability, MDPI, vol. 12(21), pages 1-21, October.
    9. Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
    10. Songtao Zhang & Yanting Hou & Siqi Zhang & Min Zhang, 2017. "Fuzzy Control Model and Simulation for Nonlinear Supply Chain System with Lead Times," Complexity, Hindawi, vol. 2017, pages 1-11, September.
    11. Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
    12. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    13. Wen Jiang & Yichao Hua & Meng Yuan & Igor Martek & Weiling Jiang, 2024. "Pricing Models under Three-Echelon Prefabricated Construction Supply Chains with Consumer Preferences," Sustainability, MDPI, vol. 16(2), pages 1-25, January.
    14. Wen Jiang & Meng Yuan, 2022. "Coordination of Prefabricated Construction Supply Chain under Cap-and-Trade Policy Considering Consumer Environmental Awareness," Sustainability, MDPI, vol. 14(9), pages 1-22, May.
    15. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    16. Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
    17. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
    18. Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
    19. Rabin Kumar Mallick & Kartik Patra & Shyamal Kumar Mondal, 2020. "Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments," Annals of Operations Research, Springer, vol. 292(1), pages 341-369, September.
    20. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:229:y:2020:i:c:s0925527320301699. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.