IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v59y2008i1d10.1057_palgrave.jors.2602303.html
   My bibliography  Save this article

Single machine scheduling with time deteriorating job values

Author

Listed:
  • S Raut

    (Indian Institute of Technology)

  • J N D Gupta

    (University of Alabama in Huntsville)

  • S Swami

    (Indian Institute of Technology)

Abstract

This paper considers the problem of scheduling n jobs on a single machine where the job value deteriorates with its starting time. The objective of the problem is to maximize the cumulative value of all jobs. The problem is motivated from the real-life applications, such as movie scheduling, remanufacturing of high-technology products, web object transmission, and banner advertising. Unrestricted, truncated, and capacity constrained job value functions are considered. Some special cases of the problem, such as the unrestricted linear job value function, are polynomially solvable. The general problem is shown to be unary NP-hard and is modelled as a time index integer program. For the NP-hard cases, several heuristics are proposed. Results of the empirical evaluation of the relative performance of the proposed heuristics on critical parameters are reported.

Suggested Citation

  • S Raut & J N D Gupta & S Swami, 2008. "Single machine scheduling with time deteriorating job values," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(1), pages 105-118, January.
  • Handle: RePEc:pal:jorsoc:v:59:y:2008:i:1:d:10.1057_palgrave.jors.2602303
    DOI: 10.1057/palgrave.jors.2602303
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602303
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602303?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sanjeev Swami & Jehoshua Eliashberg & Charles B. Weinberg, 1999. "SilverScreener: A Modeling Approach to Movie Screens Management," Marketing Science, INFORMS, vol. 18(3), pages 352-372.
    2. Voutsinas, Theodore G. & Pappis, Costas P., 2002. "Scheduling jobs with values exponentially deteriorating over time," International Journal of Production Economics, Elsevier, vol. 79(3), pages 163-169, October.
    3. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Raut, Sumit & Swami, Sanjeev & Gupta, Jatinder N.D., 2008. "Scheduling a capacitated single machine with time deteriorating job values," International Journal of Production Economics, Elsevier, vol. 114(2), pages 769-780, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Raut, Sumit & Swami, Sanjeev & Gupta, Jatinder N.D., 2008. "Scheduling a capacitated single machine with time deteriorating job values," International Journal of Production Economics, Elsevier, vol. 114(2), pages 769-780, August.
    2. Sanjeev Swami, 2006. "—Research Perspectives at the Interface of Marketing and Operations: Applications to the Motion Picture Industry," Marketing Science, INFORMS, vol. 25(6), pages 670-673, 11-12.
    3. Kumar, V.N.S.A. & Kumar, V. & Brady, M. & Garza-Reyes, Jose Arturo & Simpson, M., 2017. "Resolving forward-reverse logistics multi-period model using evolutionary algorithms," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 458-469.
    4. Sumit Raut & Sanjeev Swami & Eunkyu Lee & Charles B. Weinberg, 2008. "How Complex Do Movie Channel Contracts Need to Be?," Marketing Science, INFORMS, vol. 27(4), pages 627-641, 07-08.
    5. Zhiguo Wang & Lufei Huang & Cici Xiao He, 2021. "A multi-objective and multi-period optimization model for urban healthcare waste’s reverse logistics network design," Journal of Combinatorial Optimization, Springer, vol. 42(4), pages 785-812, November.
    6. Metin Türkay & Öztürk Saraçoğlu & Mehmet Can Arslan, 2016. "Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective," PLOS ONE, Public Library of Science, vol. 11(1), pages 1-18, January.
    7. Gregory A. DeCroix & Jing-Sheng Song & Paul H. Zipkin, 2009. "Managing an Assemble-to-Order System with Returns," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 144-159, October.
    8. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    9. Deishin Lee, 2012. "Turning Waste into By-Product," Manufacturing & Service Operations Management, INFORMS, vol. 14(1), pages 115-127, January.
    10. Long He & Ying Rong & Zuo‐Jun Max Shen, 2020. "Product Sourcing and Distribution Strategies under Supply Disruption and Recall Risks," Production and Operations Management, Production and Operations Management Society, vol. 29(1), pages 9-23, January.
    11. S. Maryam Masoumi & Nima Kazemi & Salwa Hanim Abdul-Rashid, 2019. "Sustainable Supply Chain Management in the Automotive Industry: A Process-Oriented Review," Sustainability, MDPI, vol. 11(14), pages 1-30, July.
    12. Konstantaras, I. & Papachristos, S., 2007. "Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options," European Journal of Operational Research, Elsevier, vol. 178(2), pages 433-448, April.
    13. Feng, Yan & Viswanathan, S., 2014. "Heuristics with guaranteed performance bounds for a manufacturing system with product recovery," European Journal of Operational Research, Elsevier, vol. 232(2), pages 322-329.
    14. Krikke, Harold & Hofenk, Dianne & Wang, Yacan, 2013. "Revealing an invisible giant: A comprehensive survey into return practices within original (closed-loop) supply chains," Resources, Conservation & Recycling, Elsevier, vol. 73(C), pages 239-250.
    15. Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
    16. van der Laan, Erwin, 2003. "An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 81(1), pages 317-331, January.
    17. Michael Krapp & Johannes B. Kraus, 2019. "Coordination contracts for reverse supply chains: a state-of-the-art review," Journal of Business Economics, Springer, vol. 89(7), pages 747-792, September.
    18. Joan Calzada & Tommaso M. Valletti, 2012. "Intertemporal Movie Distribution: Versioning When Customers Can Buy Both Versions," Marketing Science, INFORMS, vol. 31(4), pages 649-667, July.
    19. Janiak, Adam & Krysiak, Tomasz & Pappis, Costas P. & Voutsinas, Theodore G., 2009. "A scheduling problem with job values given as a power function of their completion times," European Journal of Operational Research, Elsevier, vol. 193(3), pages 836-848, March.
    20. Janiak, Adam & Krysiak, Tomasz, 2012. "Scheduling jobs with values dependent on their completion times," International Journal of Production Economics, Elsevier, vol. 135(1), pages 231-241.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:59:y:2008:i:1:d:10.1057_palgrave.jors.2602303. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.