IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v178y2007i2p433-448.html
   My bibliography  Save this article

Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options

Author

Listed:
  • Konstantaras, I.
  • Papachristos, S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Konstantaras, I. & Papachristos, S., 2007. "Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options," European Journal of Operational Research, Elsevier, vol. 178(2), pages 433-448, April.
  • Handle: RePEc:eee:ejores:v:178:y:2007:i:2:p:433-448
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00104-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    2. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    3. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
    4. Richter, Knut & Weber, Jens, 2001. "The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 447-456, May.
    5. Richter, Knut, 1987. "Stability of the constant cost dynamic lot size model," European Journal of Operational Research, Elsevier, vol. 31(1), pages 61-65, July.
    6. Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
    7. Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
    8. Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
    9. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ferrer, Geraldo & Swaminathan, Jayashankar M., 2010. "Managing new and differentiated remanufactured products," European Journal of Operational Research, Elsevier, vol. 203(2), pages 370-379, June.
    2. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    3. Dey, Oshmita & Chakraborty, Debjani, 2009. "Fuzzy periodic review system with fuzzy random variable demand," European Journal of Operational Research, Elsevier, vol. 198(1), pages 113-120, October.
    4. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Teunter, R.H. & Bayindir, Z.P. & van den Heuvel, W., 2005. "Dynamic lot sizing with product returns," Econometric Institute Research Papers EI 2005-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    3. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    4. Li, Yongjian & Chen, Jian & Cai, Xiaoqiang, 2007. "Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 105(2), pages 301-317, February.
    5. Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
    6. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    7. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.
    8. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
    9. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    10. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    11. Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
    12. Guan, Yongpei & Liu, Tieming, 2010. "Stochastic lot-sizing problem with inventory-bounds and constant order-capacities," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1398-1409, December.
    13. Adel A. Alamri, 2023. "A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times," Sustainability, MDPI, vol. 15(12), pages 1-23, June.
    14. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    15. Sifaleras, Angelo & Konstantaras, Ioannis & Mladenović, Nenad, 2015. "Variable neighborhood search for the economic lot sizing problem with product returns and recovery," International Journal of Production Economics, Elsevier, vol. 160(C), pages 133-143.
    16. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    17. Jian Yang & Boaz Golany & Gang Yu, 2005. "A concave‐cost production planning problem with remanufacturing options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 443-458, August.
    18. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
    19. Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
    20. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:178:y:2007:i:2:p:433-448. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.