A scheduling problem with job values given as a power function of their completion times

Contents:

Author Info

  • Janiak, Adam
  • Krysiak, Tomasz
  • Pappis, Costas P.
  • Voutsinas, Theodore G.
Registered author(s):

    Abstract

    This paper deals with a problem of scheduling jobs on the identical parallel machines, where job values are given as a power function of the job completion times. Minimization of the total loss of job values is considered as a criterion. We establish the computational complexity of the problem - strong NP-hardness of its general version and NP-hardness of its single machine case. Moreover, we solve some special cases of the problem in polynomial time. Finally, we construct and experimentally test branch and bound algorithm (along with some elimination properties improving its efficiency) and several heuristic algorithms for the general case of the problem.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.sciencedirect.com/science/article/B6VCT-4R3357R-D/2/3d5a1f4356a5e877a99e0bf33590c65e
    Download Restriction: Full text for ScienceDirect subscribers only

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by Elsevier in its journal European Journal of Operational Research.

    Volume (Year): 193 (2009)
    Issue (Month): 3 (March)
    Pages: 836-848

    as in new window
    Handle: RePEc:eee:ejores:v:193:y:2009:i:3:p:836-848

    Contact details of provider:
    Web page: http://www.elsevier.com/locate/eor

    Related research

    Keywords: Computational complexity Job value Branch and bound Heuristic Experimental analysis;

    References

    References listed on IDEAS
    Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
    as in new window
    1. Voutsinas, Theodore G. & Pappis, Costas P., 2002. "Scheduling jobs with values exponentially deteriorating over time," International Journal of Production Economics, Elsevier, vol. 79(3), pages 163-169, October.
    2. Bachman, Aleksander & Janiak, Adam, 2000. "Minimizing maximum lateness under linear deterioration," European Journal of Operational Research, Elsevier, vol. 126(3), pages 557-566, November.
    3. W. Townsend, 1978. "The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution," Management Science, INFORMS, vol. 24(5), pages 530-534, January.
    4. Wlodzimierz Szwarc & Marc E. Posner & John J. Liu, 1988. "The Single Machine Problem with a Quadratic Cost Function of Completion Times," Management Science, INFORMS, vol. 34(12), pages 1480-1488, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as in new window

    Cited by:
    1. Janiak, Adam & Krysiak, Tomasz, 2012. "Scheduling jobs with values dependent on their completion times," International Journal of Production Economics, Elsevier, vol. 135(1), pages 231-241.

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:193:y:2009:i:3:p:836-848. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Zhang, Lei).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.