IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v10y2018i4p1178-d141015.html
   My bibliography  Save this article

Multi-Criterion Two-Sided Matching of Public–Private Partnership Infrastructure Projects: Criteria and Methods

Author

Listed:
  • Ru Liang

    (School of Management and Engineering, Nanjing University, Nanjing 210093, China)

  • Changzhi Wu

    (Australasian Joint Research Centre for Building Information Modelling, School of Built Environment, Curtin University, Bentley, WA 6102, Australia)

  • Zhaohan Sheng

    (School of Management and Engineering, Nanjing University, Nanjing 210093, China)

  • Xiangyu Wang

    (School of Built Environment, Curtin University, Perth, WA 6102, Australia
    Department of Housing and Interior Design, Kyung Hee University, Seoul 130701, Korea)

Abstract

Two kinds of evaluative criteria are associated with Public–Private Partnership (PPP) infrastructure projects, i.e., private evaluative criteria and public evaluative criteria. These evaluative criteria are inversely related, that is, the higher the public benefits; the lower the private surplus. To balance evaluative criteria in the Two-Sided Matching (TSM) decision, this paper develops a quantitative matching decision model to select an optimal matching scheme for PPP infrastructure projects based on the Hesitant Fuzzy Set (HFS) under unknown evaluative criterion weights. In the model, HFS is introduced to describe values of the evaluative criteria and multi-criterion information is fully considered given by groups. The optimal model is built and solved by maximizing the whole deviation of each criterion so that the evaluative criterion weights are determined objectively. Then, the match-degree of the two sides is calculated and a multi-objective optimization model is introduced to select an optimal matching scheme via a min-max approach. The results provide new insights and implications of the influence on evaluative criteria in the TSM decision.

Suggested Citation

  • Ru Liang & Changzhi Wu & Zhaohan Sheng & Xiangyu Wang, 2018. "Multi-Criterion Two-Sided Matching of Public–Private Partnership Infrastructure Projects: Criteria and Methods," Sustainability, MDPI, vol. 10(4), pages 1-22, April.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:4:p:1178-:d:141015
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/4/1178/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/4/1178/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Kasperski, Adam & Zielinski, Pawel, 2007. "On combinatorial optimization problems on matroids with uncertain weights," European Journal of Operational Research, Elsevier, vol. 177(2), pages 851-864, March.
    2. Scandizzo, Pasquale L. & Ventura, Marco, 2010. "Sharing risk through concession contracts," European Journal of Operational Research, Elsevier, vol. 207(1), pages 363-370, November.
    3. Luiz Eduardo Brandao & Eduardo Saraiva, 2008. "The option value of government guarantees in infrastructure projects," Construction Management and Economics, Taylor & Francis Journals, vol. 26(11), pages 1171-1180.
    4. Marcus Ahadzi & Graeme Bowles, 2004. "Public-private partnerships and contract negotiations: an empirical study," Construction Management and Economics, Taylor & Francis Journals, vol. 22(9), pages 967-978.
    5. Chou, Jui-Sheng & Ping Tserng, H. & Lin, Chieh & Yeh, Chun-Pin, 2012. "Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects," Transport Policy, Elsevier, vol. 22(C), pages 36-48.
    6. Oliveira, Carla & Antunes, Carlos Henggeler, 2007. "Multiple objective linear programming models with interval coefficients - an illustrated overview," European Journal of Operational Research, Elsevier, vol. 181(3), pages 1434-1463, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Qin Yang & Jinfeng Liu & Xing Liu & Cejun Cao & Wei Zhang, 2019. "A Two-Sided Matching Model for Task Distribution in Ridesharing: A Sustainable Operations Perspective," Sustainability, MDPI, vol. 11(7), pages 1-16, April.
    2. Anna Wojewnik-Filipkowska & Joanna Węgrzyn, 2019. "Understanding of Public–Private Partnership Stakeholders as a Condition of Sustainable Development," Sustainability, MDPI, vol. 11(4), pages 1-16, February.
    3. Jinyu Wei & Zihan Liang & Yaoxi Liu & Xin Yang, 2023. "Resource Matching in the Supply Chain Based on Environmental Friendliness under a Smart Contract," Sustainability, MDPI, vol. 15(2), pages 1-22, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Buso, Marco & Moretto, Michele & Zormpas, Dimitrios, 2021. "Excess returns in Public-Private Partnerships: Do governments pay too much?," Economic Modelling, Elsevier, vol. 102(C).
    2. Marco Buso & Cesare Dosi & Michele Moretto, 2021. "Do exit options increase the value for money of public–private partnerships?," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 30(4), pages 721-742, November.
    3. Marco Buso & Cesare Dosi & Michele Moretto, 2018. "Termination Fees and Contract Design in Public-Private Partnerships," Working Papers 2018.32, Fondazione Eni Enrico Mattei.
    4. Jin, Hongyu & Liu, Shijing & Sun, Jide & Liu, Chunlu, 2021. "Determining concession periods and minimum revenue guarantees in public-private-partnership agreements," European Journal of Operational Research, Elsevier, vol. 291(2), pages 512-524.
    5. Silaghi, Florina & Sarkar, Sudipto, 2021. "Agency problems in public-private partnerships investment projects," European Journal of Operational Research, Elsevier, vol. 290(3), pages 1174-1191.
    6. Nur, Suardi & Burton, Bruce & Bergmann, Ariel, 2023. "Evidence on optimal risk allocation models for Indonesian geothermal projects under PPP contracts," Utilities Policy, Elsevier, vol. 81(C).
    7. Dranichak, Garrett M. & Wiecek, Margaret M., 2019. "On highly robust efficient solutions to uncertain multiobjective linear programs," European Journal of Operational Research, Elsevier, vol. 273(1), pages 20-30.
    8. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    9. Kuei-Hu Chang & Yung-Chia Chang & Kai Chain & Hsiang-Yu Chung, 2016. "Integrating Soft Set Theory and Fuzzy Linguistic Model to Evaluate the Performance of Training Simulation Systems," PLOS ONE, Public Library of Science, vol. 11(9), pages 1-29, September.
    10. Rachael Nsasira & Benon C. Basheka & Pross. N. Oluka, 2013. "Public Private Partnerships (PPPs) and Enhanced Service Delivery in Uganda: Implications from the Energy Sector," International Journal of Business Administration, International Journal of Business Administration, Sciedu Press, vol. 4(3), pages 48-60, May.
    11. Marzouk, Mohamed & Ali, Mohamed, 2018. "Mitigating risks in wastewater treatment plant PPPs using minimum revenue guarantee and real options," Utilities Policy, Elsevier, vol. 53(C), pages 121-133.
    12. Rothengatter, Werner, 2019. "Megaprojects in transportation networks," Transport Policy, Elsevier, vol. 75(C), pages 1-15.
    13. Ales S. Berk & Dejan Podhraski, 2018. "Superiority of Monte Carlo simulation in valuing real options within public–private partnerships," Risk Management, Palgrave Macmillan, vol. 20(1), pages 1-28, February.
    14. Shiang-Tai Liu & Yueh-Chiang Lee, 2021. "Fuzzy measures for fuzzy cross efficiency in data envelopment analysis," Annals of Operations Research, Springer, vol. 300(2), pages 369-398, May.
    15. Zhou, Feng & Huang, Gordon H. & Chen, Guo-Xian & Guo, Huai-Cheng, 2009. "Enhanced-interval linear programming," European Journal of Operational Research, Elsevier, vol. 199(2), pages 323-333, December.
    16. Han, Qingye & Zhu, Yuming & Ke, Ginger Y. & Hipel, Keith W., 2019. "Public private partnership in brownfield remediation projects in China: Identification and structure analysis of risks," Land Use Policy, Elsevier, vol. 84(C), pages 87-104.
    17. Marian MOSZORO, 2014. "Efficient Public-Private Capital Structures," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 85(1), pages 103-126, March.
    18. Fedorov, Semyon & Lavrutich, Maria & Hagspiel, Verena & Lerdahl, Thomas, 2022. "Risk and benefit sharing schemes in oil exploration and production," Energy Economics, Elsevier, vol. 116(C).
    19. Arias, Juan F. & Bachmann, Chris, 2022. "Quantifying the relative importance of rapid transit implementation barriers: Evidence from ecuador," Journal of Transport Geography, Elsevier, vol. 100(C).
    20. Wu, Yunna & Song, Zixin & Li, Lingwenying & Xu, Ruhang, 2018. "Risk management of public-private partnership charging infrastructure projects in China based on a three-dimension framework," Energy, Elsevier, vol. 165(PA), pages 1089-1101.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:4:p:1178-:d:141015. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.