IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v41y1995i1-3p343-354.html
   My bibliography  Save this article

Genetic algorithm for assembly line balancing

Author

Listed:
  • Rubinovitz, J.
  • Levitin, G.

Abstract

No abstract is available for this item.

Suggested Citation

  • Rubinovitz, J. & Levitin, G., 1995. "Genetic algorithm for assembly line balancing," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 343-354, October.
  • Handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:343-354
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00059-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. E. M. Dar-El & Y. Rubinovitch, 1979. "Must--A Multiple Solutions Technique for Balancing Single Model Assembly Lines," Management Science, INFORMS, vol. 25(11), pages 1105-1114, November.
    2. F. Brian Talbot & James H. Patterson & William V. Gehrlein, 1986. "A Comparative Evaluation of Heuristic Line Balancing Techniques," Management Science, INFORMS, vol. 32(4), pages 430-454, April.
    3. Anthony A. Mastor, 1970. "An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques," Management Science, INFORMS, vol. 16(11), pages 728-746, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Borba, Leonardo & Ritt, Marcus & Miralles, Cristóbal, 2018. "Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 270(1), pages 146-156.
    2. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2013. "Cold-standby sequencing optimization considering mission cost," Reliability Engineering and System Safety, Elsevier, vol. 118(C), pages 28-34.
    3. Sadok Turki & Stanislav Didukh & Christophe Sauvey & Nidhal Rezg, 2017. "Optimization and Analysis of a Manufacturing–Remanufacturing–Transport–Warehousing System within a Closed-Loop Supply Chain," Sustainability, MDPI, vol. 9(4), pages 1-20, April.
    4. Hager Triki & Ahmed Mellouli & Faouzi Masmoudi, 2017. "A multi-objective genetic algorithm for assembly line resource assignment and balancing problem of type 2 (ALRABP-2)," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 371-385, February.
    5. Xiang, Yanping & Levitin, Gregory, 2011. "Service task partition and distribution in star topology computer grid subject to data security constraints," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1507-1514.
    6. Hui Xiao & Kunxiang Yi & Gang Kou & Liudong Xing, 2020. "Reliability of a two‐dimensional demand‐based networked system with multistate components," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(6), pages 453-468, September.
    7. Xiaofeng, Hu & Erfei, Wu & Jinsong, Bao & Ye, Jin, 2010. "A branch-and-bound algorithm to minimize the line length of a two-sided assembly line," European Journal of Operational Research, Elsevier, vol. 206(3), pages 703-707, November.
    8. Levitin, Gregory & Dai, Yuan-Shun, 2008. "Optimal service task partition and distribution in grid system with star topology," Reliability Engineering and System Safety, Elsevier, vol. 93(1), pages 152-159.
    9. Hamta, Nima & Fatemi Ghomi, S.M.T. & Jolai, F. & Akbarpour Shirazi, M., 2013. "A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect," International Journal of Production Economics, Elsevier, vol. 141(1), pages 99-111.
    10. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    11. Lapierre, Sophie D. & Ruiz, Angel & Soriano, Patrick, 2006. "Balancing assembly lines with tabu search," European Journal of Operational Research, Elsevier, vol. 168(3), pages 826-837, February.
    12. Otto, Alena & Otto, Christian & Scholl, Armin, 2013. "Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 228(1), pages 33-45.
    13. Levitin, Gregory & Rubinovitz, Jacob & Shnits, Boris, 2006. "A genetic algorithm for robotic assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 811-825, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    2. Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
    3. Cohen, Yuval & Vitner, Gad & Sarin, Subhash C., 2006. "Optimal allocation of work in assembly lines for lots with homogenous learning," European Journal of Operational Research, Elsevier, vol. 168(3), pages 922-931, February.
    4. Amen, Matthias, 2001. "Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time," International Journal of Production Economics, Elsevier, vol. 69(3), pages 255-264, February.
    5. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    6. Sprecher, Arno, 2000. "SALBLIB: Challenging instances for assembly line balancing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 526, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    7. Amen, Matthias, 2006. "Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds," European Journal of Operational Research, Elsevier, vol. 168(3), pages 747-770, February.
    8. Otto, Alena & Otto, Christian & Scholl, Armin, 2013. "Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 228(1), pages 33-45.
    9. Fatih Ugurdag, H. & Rachamadugu, Ram & Papachristou, Christos A., 1997. "Designing paced assembly lines with fixed number of stations," European Journal of Operational Research, Elsevier, vol. 102(3), pages 488-501, November.
    10. M. Vanhoucke & J. Coelho & L. V. Tavares & D. Debels, 2004. "On The Morphological Structure Of A Network," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 04/272, Ghent University, Faculty of Economics and Business Administration.
    11. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    12. Roemer, Thomas A. & Ahmadi, Reza, 2010. "Models for concurrent product and process design," European Journal of Operational Research, Elsevier, vol. 203(3), pages 601-613, June.
    13. Miltenburg, John, 1998. "Balancing U-lines in a multiple U-line facility," European Journal of Operational Research, Elsevier, vol. 109(1), pages 1-23, August.
    14. Van Peteghem, Vincent & Vanhoucke, Mario, 2014. "An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances," European Journal of Operational Research, Elsevier, vol. 235(1), pages 62-72.
    15. Mario Vanhoucke & Erik Demeulemeester & Willy Herroelen, 2001. "On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints," Management Science, INFORMS, vol. 47(8), pages 1113-1121, August.
    16. Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
    17. Debels, D. & Vanhoucke, M., 2006. "Pre-emptive resource-constrained project scheduling with setup times," Vlerick Leuven Gent Management School Working Paper Series 2006-19, Vlerick Leuven Gent Management School.
    18. Urban, Timothy L. & Chiang, Wen-Chyuan, 2016. "Designing energy-efficient serial production lines: The unpaced synchronous line-balancing problem," European Journal of Operational Research, Elsevier, vol. 248(3), pages 789-801.
    19. Anulark Pinnoi & Wilbert E. Wilhelm, 1998. "Assembly System Design: A Branch and Cut Approach," Management Science, INFORMS, vol. 44(1), pages 103-118, January.
    20. M. H. Alavidoost & M. H. Fazel Zarandi & Mosahar Tarimoradi & Yaser Nemati, 2017. "Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 313-336, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:41:y:1995:i:1-3:p:343-354. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.