IDEAS home Printed from https://ideas.repec.org/a/eee/jomega/v93y2020ics0305048318305632.html
   My bibliography  Save this article

A strategic and global manufacturing capacity management optimisation model: A Scenario-based multi-stage stochastic programming approach

Author

Listed:
  • Sabet, Ehsan
  • Yazdani, Baback
  • Kian, Ramez
  • Galanakis, Kostas

Abstract

Large-scale multinational manufacturing firms often require a significant investment in production capacity and extensive management efforts in strategic planning in an uncertain business environment. In this research we first discuss what decision terms and boundary conditions a holistic capacity management model for the manufacturing industry must contain. To better understand how these decision terms and constraints have been employed by the recent model developers in the area of capacity and resource management modelling for manufacturing, 69 optimisation-based (deterministic and stochastic) models have been carefully selected from 2000 to 2018 for a brief comparative analysis. The results of this comparison shows although applying uncertainty into capacity modelling (in stochastic form) has received a greater deal of attention most recently (since 2010), the existing stochastic models are yet very simplistic, and not all the strategic terms have been employed in the current model developments in the field. This lack of a holistic approach although is evident in deterministic models too, the existing stochastic counterparts proved to include much less decision terms and inclusive constraints, which limits them to a limited applications and may cause sub-optimal solutions. Employing this set of holistic decision terms and boundary conditions, this work develops a scenario-based multi-stage stochastic capacity management model, which is capable of modelling different strategic terms such as capacity level management (slight, medium and large capacity volume adjustment to increase/decrease capacity), location/relocation decisions, merge/decomposition options, and product management (R&D, new product launch, product-to-plant and product-to-market allocation, and product phase-out management). Possibility matrix, production rates, different financial terms and international taxes, inflation rates, machinery depreciation, investment lead-time and product cycle-time are also embedded in the model in order to make it more practical, realistic and sensitive to strategic decisions and scenarios. A step-by-step open-box validation has been followed while designing the model and a holistic black-box validation plan has been designed and employed to widely validate the model. The model then has been verified by deploying a real-scaled case of Toyota Motors UK (TMUK) decision of mothballing one of their production lines in the UK after the global recession in 2010.

Suggested Citation

  • Sabet, Ehsan & Yazdani, Baback & Kian, Ramez & Galanakis, Kostas, 2020. "A strategic and global manufacturing capacity management optimisation model: A Scenario-based multi-stage stochastic programming approach," Omega, Elsevier, vol. 93(C).
  • Handle: RePEc:eee:jomega:v:93:y:2020:i:c:s0305048318305632
    DOI: 10.1016/j.omega.2019.01.004
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305048318305632
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.omega.2019.01.004?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hammami, Ramzi & Frein, Yannick & Hadj-Alouane, Atidel B., 2008. "Supply chain design in the delocalization context: Relevant features and new modeling tendencies," International Journal of Production Economics, Elsevier, vol. 113(2), pages 641-656, June.
    2. Hanan Luss, 1982. "Operations Research and Capacity Expansion Problems: A Survey," Operations Research, INFORMS, vol. 30(5), pages 907-947, October.
    3. Geng, Na & Jiang, Zhibin & Chen, Feng, 2009. "Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity," European Journal of Operational Research, Elsevier, vol. 198(3), pages 899-908, November.
    4. Ricardo Hamad & Nicolau Fares Gualda, 2008. "Model for Facilities or Vendors Location in a Global Scale Considering Several Echelons in the Chain," Networks and Spatial Economics, Springer, vol. 8(2), pages 297-307, September.
    5. Kauder, S. & Meyr, H., 2009. "Strategic network planning for an international automotive manufacturer," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36058, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. Melo, M.T. & Nickel, S. & Saldanha-da-Gama, F., 2009. "Facility location and supply chain management - A review," European Journal of Operational Research, Elsevier, vol. 196(2), pages 401-412, July.
    7. Francisco Barahona & Stuart Bermon & Oktay Günlük & Sarah Hood, 2005. "Robust capacity planning in semiconductor manufacturing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 459-468, August.
    8. Nickel, Stefan & Saldanha-da-Gama, Francisco & Ziegler, Hans-Peter, 2012. "A multi-stage stochastic supply network design problem with financial decisions and risk management," Omega, Elsevier, vol. 40(5), pages 511-524.
    9. Azaron, A. & Brown, K.N. & Tarim, S.A. & Modarres, M., 2008. "A multi-objective stochastic programming approach for supply chain design considering risk," International Journal of Production Economics, Elsevier, vol. 116(1), pages 129-138, November.
    10. Francas, David & Kremer, Mirko & Minner, Stefan & Friese, Markus, 2009. "Strategic process flexibility under lifecycle demand," International Journal of Production Economics, Elsevier, vol. 121(2), pages 427-440, October.
    11. Snyder, Lawrence V. & Daskin, Mark S. & Teo, Chung-Piaw, 2007. "The stochastic location model with risk pooling," European Journal of Operational Research, Elsevier, vol. 179(3), pages 1221-1238, June.
    12. Wu, Cheng-Hung & Chuang, Ya-Tang, 2010. "An innovative approach for strategic capacity portfolio planning under uncertainties," European Journal of Operational Research, Elsevier, vol. 207(2), pages 1002-1013, December.
    13. Ahmed, Shabbir & Sahinidis, Nikolaos V., 2008. "Selection, acquisition, and allocation of manufacturing technology in a multi-period environment," European Journal of Operational Research, Elsevier, vol. 189(3), pages 807-821, September.
    14. Gary D. Eppen & R. Kipp Martin & Linus Schrage, 1989. "OR Practice—A Scenario Approach to Capacity Planning," Operations Research, INFORMS, vol. 37(4), pages 517-527, August.
    15. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    16. Nima Hamta & M. Akbarpour Shirazi & S.M.T. Fatemi Ghomi & Sara Behdad, 2015. "Supply chain network optimization considering assembly line balancing and demand uncertainty," International Journal of Production Research, Taylor & Francis Journals, vol. 53(10), pages 2970-2994, May.
    17. Gang Chen & Mark S. Daskin & Zuo‐Jun Max Shen & Stanislav Uryasev, 2006. "The α‐reliable mean‐excess regret model for stochastic facility location modeling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(7), pages 617-626, October.
    18. Chandra, Charu & Everson, Mark & Grabis, Janis, 2005. "Evaluation of enterprise-level benefits of manufacturing flexibility," Omega, Elsevier, vol. 33(1), pages 17-31, February.
    19. Hammami, Ramzi & Frein, Yannick & Hadj-Alouane, Atidel B., 2009. "A strategic-tactical model for the supply chain design in the delocalization context: Mathematical formulation and a case study," International Journal of Production Economics, Elsevier, vol. 122(1), pages 351-365, November.
    20. Bernhard Fleischmann & Sonja Ferber & Peter Henrich, 2006. "Strategic Planning of BMW’s Global Production Network," Interfaces, INFORMS, vol. 36(3), pages 194-208, June.
    21. Lee, Chia-Yen & Johnson, Andrew L., 2014. "Proactive data envelopment analysis: Effective production and capacity expansion in stochastic environments," European Journal of Operational Research, Elsevier, vol. 232(3), pages 537-548.
    22. Chakravarty, Amiya K., 2005. "Global plant capacity and product allocation with pricing decisions," European Journal of Operational Research, Elsevier, vol. 165(1), pages 157-181, August.
    23. Lin, James T. & Chen, Tzu-Li & Chu, Hsiao-Ching, 2014. "A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 148(C), pages 21-36.
    24. Pimentel, Bruno S. & Mateus, Geraldo R. & Almeida, Franklin A., 2013. "Stochastic capacity planning and dynamic network design," International Journal of Production Economics, Elsevier, vol. 145(1), pages 139-149.
    25. Bhutta, Khurrum S. & Huq, Faizul & Frazier, Greg & Mohamed, Zubair, 2003. "An integrated location, production, distribution and investment model for a multinational corporation," International Journal of Production Economics, Elsevier, vol. 86(3), pages 201-216, December.
    26. Wang, Kung-Jeng & Nguyen, Phuc Hong, 2017. "Capacity planning with technology replacement by stochastic dynamic programming," European Journal of Operational Research, Elsevier, vol. 260(2), pages 739-750.
    27. Stephen C. Graves, 2011. "Uncertainty and Production Planning," International Series in Operations Research & Management Science, in: Karl G. Kempf & Pınar Keskinocak & Reha Uzsoy (ed.), Planning Production and Inventories in the Extended Enterprise, chapter 0, pages 83-101, Springer.
    28. Julka, Nirupam & Baines, Tim & Tjahjono, Benny & Lendermann, Peter & Vitanov, Val, 2007. "A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid," International Journal of Production Economics, Elsevier, vol. 106(2), pages 607-621, April.
    29. Verter, Vedat & Dasci, Abdullah, 2002. "The plant location and flexible technology acquisition problem," European Journal of Operational Research, Elsevier, vol. 136(2), pages 366-382, January.
    30. Olhager, Jan & Rudberg, Martin & Wikner, Joakim, 2001. "Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning," International Journal of Production Economics, Elsevier, vol. 69(2), pages 215-225, January.
    31. Chien, Chen-Fu & Wu, Cheng-Hung & Chiang, Yu-Shian, 2012. "Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties," International Journal of Production Economics, Elsevier, vol. 135(2), pages 860-869.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kim, Yun Geon & Chung, Byung Do, 2022. "Closed-loop supply chain network design considering reshoring drivers," Omega, Elsevier, vol. 109(C).
    2. Sawik, Tadeusz, 2023. "Reshore or not Reshore: A Stochastic Programming Approach to Supply Chain Optimization," Omega, Elsevier, vol. 118(C).
    3. Liu, Kanglin & Liu, Changchun & Xiang, Xi & Tian, Zhili, 2023. "Testing facility location and dynamic capacity planning for pandemics with demand uncertainty," European Journal of Operational Research, Elsevier, vol. 304(1), pages 150-168.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jahani, Hamed & Abbasi, Babak & Sheu, Jiuh-Biing & Klibi, Walid, 2024. "Supply chain network design with financial considerations: A comprehensive review," European Journal of Operational Research, Elsevier, vol. 312(3), pages 799-839.
    2. Martínez-Costa, Carme & Mas-Machuca, Marta & Benedito, Ernest & Corominas, Albert, 2014. "A review of mathematical programming models for strategic capacity planning in manufacturing," International Journal of Production Economics, Elsevier, vol. 153(C), pages 66-85.
    3. Blossey, Gregor & Hahn, Gerd J. & Koberstein, Achim, 2022. "Planning pharmaceutical manufacturing networks in the light of uncertain production approval times," International Journal of Production Economics, Elsevier, vol. 244(C).
    4. Zhang, Abraham & Luo, Hao & Huang, George Q., 2013. "A bi-objective model for supply chain design of dispersed manufacturing in China," International Journal of Production Economics, Elsevier, vol. 146(1), pages 48-58.
    5. Lin, James T. & Chen, Tzu-Li & Chu, Hsiao-Ching, 2014. "A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 148(C), pages 21-36.
    6. Häntsch, Marius & Huchzermeier, Arnd, 2016. "Correct accounting for duty drawbacks with outward and inward processing in global production networks," Omega, Elsevier, vol. 58(C), pages 111-127.
    7. Fattahi, Mohammad & Govindan, Kannan & Keyvanshokooh, Esmaeil, 2017. "Responsive and resilient supply chain network design under operational and disruption risks with delivery lead-time sensitive customers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 176-200.
    8. Georgiadis, Patroklos & Athanasiou, Efstratios, 2013. "Flexible long-term capacity planning in closed-loop supply chains with remanufacturing," European Journal of Operational Research, Elsevier, vol. 225(1), pages 44-58.
    9. Moritz Julius Ziegler & Kilian Seifried & Philipp Kuske & Moritz Fleischmann, 2019. "TRUMPF Uses a Mixed Integer Model as Decision Support for Strategic Production Network Design," Interfaces, INFORMS, vol. 49(3), pages 213-226, May.
    10. Longinidis, Pantelis & Georgiadis, Michael C., 2011. "Integration of financial statement analysis in the optimal design of supply chain networks under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 129(2), pages 262-276, February.
    11. Hahn, G.J. & Kuhn, H., 2012. "Simultaneous investment, operations, and financial planning in supply chains: A value-based optimization approach," International Journal of Production Economics, Elsevier, vol. 140(2), pages 559-569.
    12. Jakubovskis, Aldis, 2017. "Flexible production resources and capacity utilization rates: A robust optimization perspective," International Journal of Production Economics, Elsevier, vol. 189(C), pages 77-85.
    13. Jakubovskis, Aldis, 2017. "Strategic facility location, capacity acquisition, and technology choice decisions under demand uncertainty: Robust vs. non-robust optimization approaches," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1095-1104.
    14. Govindan, Kannan & Fattahi, Mohammad, 2017. "Investigating risk and robustness measures for supply chain network design under demand uncertainty: A case study of glass supply chain," International Journal of Production Economics, Elsevier, vol. 183(PC), pages 680-699.
    15. Wang, Mengyue & Huang, Hongxuan, 2019. "The design of a flexible capital-constrained global supply chain by integrating operational and financial strategies," Omega, Elsevier, vol. 88(C), pages 40-62.
    16. Melo, M.T. & Nickel, S. & Saldanha-da-Gama, F., 2009. "Facility location and supply chain management - A review," European Journal of Operational Research, Elsevier, vol. 196(2), pages 401-412, July.
    17. M. Fattahi & M. Mahootchi & S. M. Moattar Husseini, 2016. "Integrated strategic and tactical supply chain planning with price-sensitive demands," Annals of Operations Research, Springer, vol. 242(2), pages 423-456, July.
    18. Hasani, Aliakbar & Khosrojerdi, Amirhossein, 2016. "Robust global supply chain network design under disruption and uncertainty considering resilience strategies: A parallel memetic algorithm for a real-life case study," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 20-52.
    19. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    20. Longinidis, Pantelis & Georgiadis, Michael C., 2014. "Integration of sale and leaseback in the optimal design of supply chain networks," Omega, Elsevier, vol. 47(C), pages 73-89.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:93:y:2020:i:c:s0305048318305632. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.