Optimal workforce assignment to operations of a paced assembly line

Author

Listed:
  • Dolgui, Alexandre
  • Kovalev, Sergey
  • Kovalyov, Mikhail Y.
  • Malyutin, Sergey
  • Soukhal, Ameur

Abstract

We study a paced assembly line intended for manufacturing different products. Workers with identical skills perform non-preemptable operations whose assignment to stations is known. Operations assigned to the same station are executed sequentially, and they should follow the given precedence relations. Operations assigned to different stations can be performed in parallel. The operation’s processing time depends on the number of workers performing this operation. The problem consists in assigning workers to operations such that the maximal number of workers employed simultaneously in the assembly line is minimized, the line cycle time is not exceeded and the box constraints specifying the possible number of workers for each operation are not violated. We show that the general problem is NP-hard in the strong sense, develop conventional and randomized heuristics, propose a reduction to a series of feasibility problems, present a MILP model for the feasibility problem, show relation of the feasibility problem to multi-mode project scheduling and multiprocessor scheduling, establish computational complexity of several special cases based on this relation and provide computer experiments with real and simulated data.

Suggested Citation

  • Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
  • Handle: RePEc:eee:ejores:v:264:y:2018:i:1:p:200-211
    DOI: 10.1016/j.ejor.2017.06.017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221717305350
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.06.017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Giard, Vincent & Jeunet, Jully, 2010. "Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line," International Journal of Production Economics, Elsevier, vol. 123(2), pages 290-300, February.
    2. George Vairaktarakis & Janice Kim Winch, 1999. "Worker Cross-Training in Paced Assembly Lines," Manufacturing & Service Operations Management, INFORMS, vol. 1(2), pages 112-131.
    3. Demeulemeester, Erik L. & Herroelen, Willy S. & Elmaghraby, Salah E., 1996. "Optimal procedures for the discrete time/cost trade-off problem in project networks," European Journal of Operational Research, Elsevier, vol. 88(1), pages 50-68, January.
    4. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    5. Lutz, CM & Davis, KR & Turner III, CF, 1994. "Development of operator assignment schedules: A DSS approach," Omega, Elsevier, vol. 22(1), pages 57-67, January.
    6. Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
    7. Jacek Błażewicz & Maciej Machowiak & Jan Węglarz & Mikhail Kovalyov & Denis Trystram, 2004. "Scheduling Malleable Tasks on Parallel Processors to Minimize the Makespan," Annals of Operations Research, Springer, vol. 129(1), pages 65-80, July.
    8. Corominas, Albert & Pastor, Rafael & Plans, Joan, 2008. "Balancing assembly line with skilled and unskilled workers," Omega, Elsevier, vol. 36(6), pages 1126-1132, December.
    9. Marcus Ritt & Alysson M. Costa & Cristóbal Miralles, 2016. "The assembly line worker assignment and balancing problem with stochastic worker availability," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 907-922, February.
    10. Araújo, Felipe F.B. & Costa, Alysson M. & Miralles, Cristóbal, 2012. "Two extensions for the ALWABP: Parallel stations and collaborative approach," International Journal of Production Economics, Elsevier, vol. 140(1), pages 483-495.
    11. Drozdowski, Maciej, 1996. "Scheduling multiprocessor tasks -- An overview," European Journal of Operational Research, Elsevier, vol. 94(2), pages 215-230, October.
    12. Chung-Yee Lee & George L. Vairaktarakis, 1997. "Workforce Planning in Mixed Model Assembly Systems," Operations Research, INFORMS, vol. 45(4), pages 553-567, August.
    13. repec:dau:papers:123456789/2861 is not listed on IDEAS
    14. Rainer Kolisch & Arno Sprecher & Andreas Drexl, 1995. "Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems," Management Science, INFORMS, vol. 41(10), pages 1693-1703, October.
    15. Clyde L. Monma & Alexander Schrijver & Michael J. Todd & Victor K. Wei, 1990. "Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions," Mathematics of Operations Research, INFORMS, vol. 15(4), pages 736-748, November.
    16. Errol L. Lloyd, 1981. "Concurrent Task Systems," Operations Research, INFORMS, vol. 29(1), pages 189-201, February.
    17. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79439, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    18. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
    19. J Blazewicz & T C E Cheng & M Machowiak & C Oguz, 2011. "Berth and quay crane allocation: a moldable task scheduling model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1189-1197, July.
    20. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    21. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
    22. Otto, Alena & Otto, Christian & Scholl, Armin, 2013. "Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 228(1), pages 33-45.
    23. Vairaktarakis, George L. & Cai, Xiaoqiang & Lee, Chung-Yee, 2002. "Workforce planning in synchronous production systems," European Journal of Operational Research, Elsevier, vol. 136(3), pages 551-572, February.
    24. Salewski, Frank & Schirmer, Andreas & Drexl, Andreas, 1997. "Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application," European Journal of Operational Research, Elsevier, vol. 102(1), pages 88-110, October.
    25. Kolisch, Rainer & Sprecher, Arno, 1997. "PSPLIB - A project scheduling problem library : OR Software - ORSEP Operations Research Software Exchange Program," European Journal of Operational Research, Elsevier, vol. 96(1), pages 205-216, January.
    26. Moreira, Mayron César O. & Costa, Alysson M., 2013. "Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers," International Journal of Production Economics, Elsevier, vol. 141(2), pages 552-560.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
    2. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    3. Fang, Kan & Wang, Shijin & Pinedo, Michael L. & Chen, Lin & Chu, Feng, 2021. "A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions," European Journal of Operational Research, Elsevier, vol. 291(1), pages 128-146.
    4. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
    5. Lai, David S.W. & Leung, Janny M.Y. & Dullaert, Wout & Marques, Inês, 2020. "A graph-based formulation for the shift rostering problem," European Journal of Operational Research, Elsevier, vol. 284(1), pages 285-300.
    6. Wu, Fangfang & Zhang, Xiandong & Chen, Bo, 2023. "An improved approximation algorithm for scheduling monotonic moldable tasks," European Journal of Operational Research, Elsevier, vol. 306(2), pages 567-578.
    7. Fangfang Wu & Zhongyi Jiang & Run Zhang & Xiandong Zhang, 2023. "Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms," Journal of Scheduling, Springer, vol. 26(4), pages 383-398, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
    2. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
    3. Olcay Polat & Can B. Kalayci & Özcan Mutlu & Surendra M. Gupta, 2016. "A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 722-741, February.
    4. George Vairaktarakis & Joseph G. Szmerekovsky & Jiayan Xu, 2016. "Level workforce planning for multistage transfer lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(7), pages 577-590, October.
    5. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    6. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
    7. Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
    8. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    9. Zhilan Lou & Wanchen Jie & Shuzhu Zhang, 2020. "Multi-Objective Optimization for Order Assignment in Food Delivery Industry with Human Factor Considerations," Sustainability, MDPI, vol. 12(19), pages 1-17, September.
    10. Wu, Lingxiao & Wang, Shuaian, 2018. "Exact and heuristic methods to solve the parallel machine scheduling problem with multi-processor tasks," International Journal of Production Economics, Elsevier, vol. 201(C), pages 26-40.
    11. Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2021. "Scheduling Human-Robot Teams in collaborative working cells," International Journal of Production Economics, Elsevier, vol. 235(C).
    12. Lotfi Hidri & Achraf Gazdar & Mohammed M. Mabkhot, 2020. "Optimized Procedure to Schedule Physicians in an Intensive Care Unit: A Case Study," Mathematics, MDPI, vol. 8(11), pages 1-24, November.
    13. Fowler, John W. & Wirojanagud, Pornsarun & Gel, Esma S., 2008. "Heuristics for workforce planning with worker differences," European Journal of Operational Research, Elsevier, vol. 190(3), pages 724-740, November.
    14. George L. Vairaktarakis & Chung‐Yee Lee, 2004. "Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(1), pages 44-59, February.
    15. Zhang, Zizhen & Qin, Hu & Wang, Kai & He, Huang & Liu, Tian, 2017. "Manpower allocation and vehicle routing problem in non-emergency ambulance transfer service," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 106(C), pages 45-59.
    16. Eleni Hadjiconstantinou & Evelina Klerides, 2010. "A new path-based cutting plane approach for the discrete time-cost tradeoff problem," Computational Management Science, Springer, vol. 7(3), pages 313-336, July.
    17. Mick Van Den Eeckhout & Broos Maenhout & Mario Vanhoucke, 2020. "Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs," Annals of Operations Research, Springer, vol. 292(1), pages 133-160, September.
    18. Snauwaert, Jakob & Vanhoucke, Mario, 2023. "A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 307(1), pages 1-19.
    19. Oguz, C. & Fikret Ercan, M. & Edwin Cheng, T. C. & Fung, Y. F., 2003. "Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop," European Journal of Operational Research, Elsevier, vol. 149(2), pages 390-403, September.
    20. Zsolt T. Kosztyán & István Szalkai, 2020. "Multimode resource-constrained project scheduling in flexible projects," Journal of Global Optimization, Springer, vol. 76(1), pages 211-241, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:264:y:2018:i:1:p:200-211. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.