IDEAS home Printed from https://ideas.repec.org/p/iim/iimawp/wp00024.html
   My bibliography  Save this paper

Comments on the Draft Electricity Bill 2001

Author

Listed:
  • Morris, Sebastian

Abstract

These comments on the Draft Bill 2001, had been widely circulated in September 2001. Discussions on the Bill have again revived in the media and elsewhere, as the reform of the power sector has made little headway, and there is much concern that something needs to be done. Little progress or changes have been made in the Bill, so that most of the comments made then remain valid. Essentially the Bill is maimed because it is not clear enough, does not lay a path for reform and for the evolution of the sector, and in no way reduces the policy and regulatory uncertainties. While it attempts to bring about open access, that objective would not be realised since cross subsidies are to be loaded on to the transmission charge thereby killing whatever little prospect there is the Bill for a market in power. There is no specification at all of the mode of transmission pricing and the crucial role of transmission pricing is not recognised in the Bill. The Bill does not recognise that cross-subsidies via differential prices would continue to keep open the "price-arbitrage" opportunity (the root of corruption and the source of all ills in the system), so that no real change would be possible. The Bill gives legal status to far too many "authorities" and bodies, some of them quite unnecessary and vestiges of the past. The coordination problems between these are likely to take the system (if ever what is envisaged materialises) far from the optimal. The special opportunity in inter-regional trade in power cannot be realised unless the law limits the barriers to interregional trade. Most importantly the Bill virtually rules out incentive regulation of the modern varieties such as price cap regulation. Through the sub-clauses it brings in cost plus regulation. Cost plus regulation has been particularly problematic in India, and can be expected to bring inefficiencies and cost padding if not regulatory capture.

Suggested Citation

  • Morris, Sebastian, 2002. "Comments on the Draft Electricity Bill 2001," IIMA Working Papers WP2002-07-03, Indian Institute of Management Ahmedabad, Research and Publication Department.
  • Handle: RePEc:iim:iimawp:wp00024
    as

    Download full text from publisher

    File URL: https://www.iima.ac.in/sites/default/files/rnpfiles/2002-07-03SebastianMorris.pdf
    File Function: English Version
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:iim:iimawp:wp00024. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://edirc.repec.org/data/eciimin.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.