Author
Listed:
- Fleitas, Sebastian
- Hendel, Igal E
- Mendez Galain, Ramon
Abstract
For more than three decades, the energy transition has been driven primarily by climate objectives, but on-shore wind and solar are now the lowest-cost sources of electricity in most markets worldwide, making the case for renewables increasingly economic rather than purely environmental. Despite this, renewable generation continues to fall short of demand growth, not because of technological or cost limitations, but because electricity market rules and regulatory frameworks were designed for systems dominated by thermal generation. As variable renewable energy (VRE) penetration rises, spot energy markets lose their allocative role, capacity mechanisms become more important, and investor risk grows increasingly unpredictable. This paper proposes a new regulatory and market design framework built on three integrated instruments: the use of an open-source, system-wide expansion model that simulates operations across all relevant time scales; periodic technology-specific competitive auctions for long-term contracts; and remuneration schemes tailored to each technology's contribution to system value, with VRE paid per unit of energy delivered under pay-as-produced, take-or-pay contracts. The proposal draws on the experience of Uruguay, which achieved 99.1\% renewable electricity penetration within a decade while cutting generation costs roughly in half, primarily through long-term contracting and minimal reliance on spot markets. We show that this framework requires no more regulation and no less competition than existing systems, and is applicable across monopolistic, competitive, public, and private power sectors. The proposal preserves the role of markets, but investors compete for the market rather than in the market. Achieving high shares of renewable electricity, we argue, is no longer primarily a technological challenge but a matter of regulatory and market design.
Suggested Citation
Fleitas, Sebastian & Hendel, Igal E & Mendez Galain, Ramon, 2026.
"A Proposal for Enabling and Operating Power Systems with High Shares of Renewable Energy,"
CEPR Discussion Papers
21952, Centre for Economic Policy Research.
Handle:
RePEc:cpr:ceprdp:21952
Download full text from publisher
More about this item
Keywords
;
;
;
JEL classification:
- Q42 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Energy - - - Alternative Energy Sources
- Q48 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Energy - - - Government Policy
- L51 - Industrial Organization - - Regulation and Industrial Policy - - - Economics of Regulation
- L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities
Statistics
Access and download statistics
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cpr:ceprdp:21952. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CEPR (email available below). General contact details of provider: https://cepr.org/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.