IDEAS home Printed from https://ideas.repec.org/p/arz/wpaper/eres2021_191.html
   My bibliography  Save this paper

Process Gaps of Model-Based Construction Cost Estimation from Selected Constellation of Actors

Author

Listed:
  • Sara Bender
  • Christian Stoy

Abstract

The corresponding and determining success factors of construction projects are essentially quality, deadlines and costs. Cost planning is therefore already a component of the planning service in early phases and has a significant influence on the pros and cons of project implementation. Digital tools and new process flows have been established in the construction industry as part of the digitalization process. Model-based construction cost estimation is used in BIM-based construction projects and obtains element sets and information from digital building models, which consist of objects with alphanumeric and graphic properties. The model-based cost planning processes are not sufficiently scientifically proven and are not subject to a standardized procedure. An ideal-typical model-based target cost estimation process is determined via literature sources. This cost estimation process is reviewed by expert interviews and their analysis by a qualitative content analysis. The result is an actual cost estimation process from current practice, which describes approach and shows process gaps in the area of integration of specialist planner models as well as cost control and cost management.

Suggested Citation

  • Sara Bender & Christian Stoy, 2021. "Process Gaps of Model-Based Construction Cost Estimation from Selected Constellation of Actors," ERES eres2021_191, European Real Estate Society (ERES).
  • Handle: RePEc:arz:wpaper:eres2021_191
    as

    Download full text from publisher

    File URL: https://eres.architexturez.net/doc/oai-eres-id-eres2021-191
    Download Restriction: no

    File URL: https://architexturez.net/system/files/P_20210520111447_9145.pdf
    Download Restriction: no
    ---><---

    More about this item

    Keywords

    BIM; Cost Estimation; Process; project planning;
    All these keywords.

    JEL classification:

    • R3 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Real Estate Markets, Spatial Production Analysis, and Firm Location

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arz:wpaper:eres2021_191. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Architexturez Imprints (email available below). General contact details of provider: https://edirc.repec.org/data/eressea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.