Making investment decisions during a property’s planning process in terms of life-cycle costing means to consider both the immediate, initial costs (construction costs) and the long-term, follow-up costs (occupancy costs) - summarily a building’s life-cycle costs. Therefore, the calculation model has to be clearly defined and to follow an appropriate data structure. Besides, the processes during the life cycle have to be priced to enable the investment calculation. This approach is ideally executed with specific and realistic values for the building. However, today’s life-cycle costing, especially for laboratory buildings, is characterized by a high degree of standardization, uniform calculation parameters and "fixed" specific values i.e. for the purpose of benchmarking in the context of sustainability certifications.The aim of this study is to identify and operationalize specific cost-influential factors on operating costs of laboratory buildings in order to develop specific life-cycle costing through reference to a practical tool for planning costs. Likewise, this tool could even allow benchmarking within sustainability certifications. In this context, cost-influential factors won from literature and existing data pools are integrated in an interview guide to conduct qualitative expert interviews. These serve to filter the essential cost-influential factors on laboratory buildings’ operating costs. Therefore, the cost drivers are structured after six categories: strategy, use, construction and technological characteristics, location, and miscellaneous. In the interview, the expert assesses and explains the cost-influential factors regarding their impact on the different cost groups like supply, disposal, cleaning, inspection, levies and contributions, and security services. The weighting and shaping of the cost-influential factors will help afterwards to specify the operating costs for each cost group in life-cycle costing of laboratory buildings.The object of investigation is narrowed to laboratory buildings with an exhaust air volume flow of 12,5 – 25 [m³/(m² UFA)] per hour which corresponds to an 4-8-way air exchange. (UFA - Usable Floor Area
Suggested Citation
Verena Walter & Christian Stoy, 2017.
"Specifying cost-influential factors on operating costs of laboratory buildings,"
ERES
eres2017_6, European Real Estate Society (ERES).
Handle:
RePEc:arz:wpaper:eres2017_6
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arz:wpaper:eres2017_6. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Architexturez Imprints (email available below). General contact details of provider: https://edirc.repec.org/data/eressea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.