Performance-Based Contracting Approaches

In: Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting

Author

Listed:
  • Kishor Shrestha

Abstract

Today, agencies use several contracting approaches to outsource their work. When they contract out to private contractors, they must consider a few issues, including how the contractors perform their work, what the contractors’ responsibilities are, what risks will be transferred to the contractors, and how the contractors will be paid. In other words, the agencies must determine what specifications they want to use for the contractors to perform their work. Based on specifications used in typical contracting approaches, two outsourcing methods are common in the construction industry: method-based contracting (MBC) and performance-based contracting (PBC).Since the PBC method is comparatively a newer contracting approach, it warrants a more in-depth look. PBC use does not have a very long history, being first used in British Columbia, Canada, in 1988 to maintain roadway and bridge assets. The PBC method uses performance specification, which allows contractors freedom related to performing a given scope of work. More specifically, the performance specification does not bind the contractor, as does the traditional method-based specification, as far as ‘how to do’, ‘when to do’, and ‘what to do’ are concerned. The PBC approach also provides incentives and disincentives to the contractor based on the work quality produced.Today, the PBC approach is being used globally. Agencies who have used this approach have benefited in various ways through saved cost, increased level of service (LOS), etc. Globally, transportation agencies have used the PBC approach for several types of work, such as roadway and bridge construction and maintenance, rest stop area operations, and mowing activities, to name a few. There is also a history of agencies implementing the PBC approach in building projects, including the service providing works of buildings in the operational phase, by reducing utility costs for example. Studies have shown that the main benefits of using the PBC approach are economic and managerial.This chapter explains the reasons for using the PBC approach, types of PBC approaches, and PBC approach implementation in various project types, as well as case studies, their findings, and the challenges and lessons learned from past PBC contracts.

Suggested Citation

  • Kishor Shrestha, 2023. "Performance-Based Contracting Approaches," World Scientific Book Chapters, in: Giovanni C Migliaccio & Pramen P Shrestha (ed.), Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting, chapter 11, pages 199-231, World Scientific Publishing Co. Pte. Ltd..
  • Handle: RePEc:wsi:wschap:9789811224782_0011
    as

    Download full text from publisher

    File URL: https://www.worldscientific.com/doi/pdf/10.1142/9789811224782_0011
    Download Restriction: Ebook Access is available upon purchase.

    File URL: https://www.worldscientific.com/doi/abs/10.1142/9789811224782_0011
    Download Restriction: Ebook Access is available upon purchase.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    More about this item

    Keywords

    Construction; Engineering; Project Delivery; Procurement; Contracting;
    All these keywords.

    JEL classification:

    • L74 - Industrial Organization - - Industry Studies: Primary Products and Construction - - - Construction
    • O2 - Economic Development, Innovation, Technological Change, and Growth - - Development Planning and Policy

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:wschap:9789811224782_0011. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscientific.com/page/worldscibooks .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.