IDEAS home Printed from https://ideas.repec.org/h/spr/oprchp/978-3-642-29210-1_69.html
   My bibliography  Save this book chapter

Mid-Term Model-Plant Allocation for Flexible Production Networks in the Automotive Industry

In: Operations Research Proceedings 2011

Author

Listed:
  • Kai Wittek

    (Technische Universität Braunschweig)

  • Achim Koberstein

    (Universität Paderborn)

  • Thomas S. Spengler

    (Technische Universität Braunschweig)

Abstract

In order to match capacity with volatile demand, original equipment manufacturers in the automotive industry increase plant flexibility. This allows for car models to be re-allocated between plants over time, to optimally use available capacity. The planning problem moves from the strategic to the tactical level. Decision support in the form of mathematical planning models accounting for the increased flexibility and characteristics of the mid-term planning situation is required. Two different modeling approaches are considered in this work and compared for their applicability to the planning situation: An approach based on a single time index model formulation and an approach based on a double time index formulation. They differ in their computational time and ability to integrate lost customer rates.

Suggested Citation

  • Kai Wittek & Achim Koberstein & Thomas S. Spengler, 2012. "Mid-Term Model-Plant Allocation for Flexible Production Networks in the Automotive Industry," Operations Research Proceedings, in: Diethard Klatte & Hans-Jakob Lüthi & Karl Schmedders (ed.), Operations Research Proceedings 2011, edition 127, pages 433-438, Springer.
  • Handle: RePEc:spr:oprchp:978-3-642-29210-1_69
    DOI: 10.1007/978-3-642-29210-1_69
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wochner, Sina & Grunow, Martin & Staeblein, Thomas & Stolletz, Raik, 2016. "Planning for ramp-ups and new product introductions in the automotive industry: Extending sales and operations planning," International Journal of Production Economics, Elsevier, vol. 182(C), pages 372-383.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:oprchp:978-3-642-29210-1_69. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.