Achieving Shojinka by Integrated Balancing of Multiple Straight Lines with Resource Dependent Task Times

In: Lean and Green Supply Chain Management

Author

Listed:
  • Yakup Atasagun

    (Konya Technical University)

  • Yakup Kara

    (Konya Technical University)

  • Gözde Can Atasagun

    (Konya Technical University)

Abstract

The concept of Shojinka, which is an important element of Just in Time production system, is attaining flexibility on the number of workers in a workshop due to demand variations. Even though Just in Time production system adopts U-shaped line layout, traditional straight lines can be combined and balanced in an integrated manner to obtain the advantages of Shojinka. In this case, the problem, which is called Integrated Balancing of Multiple Straight Lines, arises. On the other hand, the basic assumption of assembly line balancing is that every task’s time is fixed. However, in practice, different resource alternatives such as equipment or assistant worker may be available to process a task with different times. The problem in this case is to assign tasks and resources to stations that minimise total cost. In this study, a binary integer mathematical model is presented for integrated balancing of multiple straight lines, assuming that task times are resource dependent. The proposed model is illustrated and validated using several examples. An experimental analysis is also conducted to emphasize the advantages of the integrated balancing concept, compared to the situation in which the lines are balanced independent from each other. The experimental results show that, when multiple straight assembly lines are balanced in an integrated manner with resource dependent task times, an average total cost improvement of 23.105% can be obtained compared to the independent balances of the lines. This is a significant improvement that emphasizes the importance of balancing multiple straight lines in an integrated manner, to take the advantages of shojinka and to adhere to the main philosophy of Just in Time.

Suggested Citation

  • Yakup Atasagun & Yakup Kara & Gözde Can Atasagun, 2019. "Achieving Shojinka by Integrated Balancing of Multiple Straight Lines with Resource Dependent Task Times," International Series in Operations Research & Management Science, in: Turan Paksoy & Gerhard-Wilhelm Weber & Sandra Huber (ed.), Lean and Green Supply Chain Management, pages 253-273, Springer.
  • Handle: RePEc:spr:isochp:978-3-319-97511-5_9
    DOI: 10.1007/978-3-319-97511-5_9
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-3-319-97511-5_9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.