IDEAS home Printed from https://ideas.repec.org/a/taf/uiiexx/v51y2019i12p1383-1401.html
   My bibliography  Save this article

Integrated pricing and production scheduling of multiple customized products with a common base product

Author

Listed:
  • Qing Yue
  • Zhi-Long Chen
  • Guohua Wan

Abstract

Make-To-Order (MTO) is a popular production strategy commonly used by manufacturers selling customized products. Dynamic pricing is a popular tactical tool commonly used by sellers to match supply with demand when there is a limited capacity and high demand uncertainty over time. In this article, we consider joint pricing and production scheduling decisions faced by a manufacturer that uses an MTO strategy to sell a number of customized products made from a common base product. At the beginning of each period in a planning horizon, the manufacturer sets the price of the base product, which in turn sets the prices for the customized products accordingly. Given the prices, orders for the products arrive. In each period, together with the pricing decision, the manufacturer needs to make a production scheduling decision for processing accepted orders on a single production line. The manufacturer’s objective is to maximize the total revenue of the processed orders minus a scheduling penalty over the planning horizon. Three specific problems with different order acceptance rules and objective functions are studied. In the first problem, the manufacturer has to accept all the incoming orders and treats the total weighted completion time of the orders as a part of the objective function. In the second problem, the manufacturer has to accept all incoming orders, but is allowed to complete some orders after their due dates with tardiness penalties. In the third problem, the manufacturer may reject some incoming orders, but must complete all the accepted orders by their due dates. We show that all these problems are NP-hard, propose optimal pseudo-polynomial-time dynamic programming algorithms and fully-polynomial-time approximation schemes for solving these problems, and conduct computational experiments to show the performance of the proposed algorithms. Furthermore, we derive several managerial insights through computational experiments.

Suggested Citation

  • Qing Yue & Zhi-Long Chen & Guohua Wan, 2019. "Integrated pricing and production scheduling of multiple customized products with a common base product," IISE Transactions, Taylor & Francis Journals, vol. 51(12), pages 1383-1401, December.
  • Handle: RePEc:taf:uiiexx:v:51:y:2019:i:12:p:1383-1401
    DOI: 10.1080/24725854.2019.1589659
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/24725854.2019.1589659
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/24725854.2019.1589659?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Zhixin & Lu, Liang & Qi, Xiangtong, 2020. "Price quotation for orders with different due dates," International Journal of Production Economics, Elsevier, vol. 220(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uiiexx:v:51:y:2019:i:12:p:1383-1401. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/uiie .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.