The integration of resource allocation and time buffering for bi-objective robust project scheduling

Author

Listed:
  • Yangyang Liang
  • Nanfang Cui
  • Xuejun Hu
  • Erik Demeulemeester

Abstract

In the recent decades, the recognition that uncertainty lies at the heart of modern project management has induced considerable research efforts on robust project scheduling for dealing with uncertainty in a scheduling environment. The literature generally provides two main strategies for the development of a robust predictive project schedule, namely robust resource allocation and time buffering. Yet, the previous studies seem to have neglected the potential benefits of an integration between the two. Besides, few efforts have been made to protect simultaneously the project due date and the activity start times against disruptions during execution, which is desperately demanded in practice. In this paper, we aim at constructing a proactive schedule that is not only short in time but also less vulnerable to disruptions. Firstly, a bi-objective optimisation model with a proper normalisation of the two components is proposed in the presence of activity duration variability. Then a two-stage heuristic algorithm is developed which deals with a robust resource allocation problem in the first stage and optimally determines the position and the size of time buffers using a simulated annealing algorithm in the second stage. Finally, an extensive computational experiment on the PSPLIB network instances demonstrates the superiority of the combination between resource allocation and time buffering as well as the effectiveness of the proposed two-stage algorithm for generating proactive project schedules with composite robustness.

Suggested Citation

  • Yangyang Liang & Nanfang Cui & Xuejun Hu & Erik Demeulemeester, 2020. "The integration of resource allocation and time buffering for bi-objective robust project scheduling," International Journal of Production Research, Taylor & Francis Journals, vol. 58(13), pages 3839-3854, July.
  • Handle: RePEc:taf:tprsxx:v:58:y:2020:i:13:p:3839-3854
    DOI: 10.1080/00207543.2019.1636319
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2019.1636319
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2019.1636319?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:58:y:2020:i:13:p:3839-3854. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.