IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i3p845-857.html
   My bibliography  Save this article

Simulating operator learning during production ramp-up in parallel vs. serial flow production

Author

Listed:
  • W. Patrick Neumann
  • Per Medbo

Abstract

The aim of this research is to demonstrate how human learning models can be integrated into discrete event simulation to examine ramp-up time differences between serial and parallel flow production strategies. The experimental model examined three levels of learning rate and minimum cycle times. Results show that while the parallel flow system had longer ramp-up times than serial flow systems, they also had higher maximum throughput capacity. As a result, the parallel flow system frequently outperformed lines within the first weeks of operation. There is a critical lack of empirical evidence or methods that would allow designers to accurately determine what the critical learning paramters might be in their specific operations, and further research is needed to create predictive tools in this important area.

Suggested Citation

  • W. Patrick Neumann & Per Medbo, 2017. "Simulating operator learning during production ramp-up in parallel vs. serial flow production," International Journal of Production Research, Taylor & Francis Journals, vol. 55(3), pages 845-857, February.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:3:p:845-857
    DOI: 10.1080/00207543.2016.1217362
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2016.1217362
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2016.1217362?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chen, Xi & Hewitt, Mike & Thomas, Barrett W., 2018. "An approximate dynamic programming method for the multi-period technician scheduling problem with experience-based service times and stochastic customers," International Journal of Production Economics, Elsevier, vol. 196(C), pages 122-134.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:3:p:845-857. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.