IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v23y2005i2p127-145.html
   My bibliography  Save this article

Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects

Author

Listed:
  • K. C. Lam
  • C. M. Tang
  • W. C. Lee

Abstract

Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.

Suggested Citation

  • K. C. Lam & C. M. Tang & W. C. Lee, 2005. "Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects," Construction Management and Economics, Taylor & Francis Journals, vol. 23(2), pages 127-145.
  • Handle: RePEc:taf:conmgt:v:23:y:2005:i:2:p:127-145
    DOI: 10.1080/0144619042000202834
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/0144619042000202834
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0144619042000202834?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Zhaoxia Li & Michael Anson & Guangming Li, 2001. "A procedure for quantitatively evaluating site layout alternatives," Construction Management and Economics, Taylor & Francis Journals, vol. 19(5), pages 459-467.
    2. C. M. Tam & Thomas Tong, 2003. "GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction," Construction Management and Economics, Taylor & Francis Journals, vol. 21(3), pages 257-266.
    3. Emad Elbeltagi & Tarek Hegazy & Abdel Hady Hosny & Adel Eldosouky, 2001. "Schedule-dependent evolution of site layout planning," Construction Management and Economics, Taylor & Francis Journals, vol. 19(7), pages 689-697.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Eleftheria Touloupaki & Theodoros Theodosiou, 2017. "Performance Simulation Integrated in Parametric 3D Modeling as a Method for Early Stage Design Optimization—A Review," Energies, MDPI, vol. 10(5), pages 1-18, May.
    2. Briskorn, Dirk & Dienstknecht, Michael, 2020. "Covering polygons with discs: The problem of crane selection and location on construction sites," Omega, Elsevier, vol. 97(C).
    3. Xuefeng Zhao & Haodong Chen & Jing Liu & Jiaqi Liu & Meng Zhang & Yibing Tao & Junbo Li & Xuyang Wang, 2023. "Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction," Sustainability, MDPI, vol. 15(17), pages 1-17, August.
    4. Pém Attila & Mályusz Levente, 2016. "Arrangement of material depots for line segment– modeled structures using continuous conditions," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1518-1527, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:23:y:2005:i:2:p:127-145. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.