A quantitative study of post contract award design changes in construction

Author

Listed:
  • I. D. Cox
  • J. P. Morris
  • J. H. Rogerson
  • G. E. Jared

Abstract

The investigation reported forms part of a wider study into the applicability of design for manufacture (DFM) thinking to the total construction process, and the ways in which this could be implemented. Historical data from change order request procedures were examined for several case studies which were considered to be successful projects. These procedures are intended to capture information about design modifications, and thus can be considered to be analogous to the rework procedures used in manufacturing. It was found that in monetary terms alone, the direct cost of post contract design changes amounts to 5.1-7.6% of the total project cost. Although the case studies used here were a convenience sample, the typical financial opportunity for controlling design changes better is likely to be considerably greater than this. Frequently cited reasons for design changes included: employer has changed his requirements, designer's omission in tender documents and new information on existing site conditions. Little commonality between case studies was found at the work package level. In contrast to manufacturing, the availability and accessibility of data relating to rework is problematic.

Suggested Citation

  • I. D. Cox & J. P. Morris & J. H. Rogerson & G. E. Jared, 1999. "A quantitative study of post contract award design changes in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 17(4), pages 427-439.
  • Handle: RePEc:taf:conmgt:v:17:y:1999:i:4:p:427-439
    DOI: 10.1080/014461999371358
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461999371358
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461999371358?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
    2. Verweij, Stefan & Meerkerk, Ingmar van, 2020. "Do public-private partnerships perform better? A comparative analysis of costs for additional work and reasons for contract changes in Dutch transport infrastructure projects," Transport Policy, Elsevier, vol. 99(C), pages 430-438.
    3. Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:17:y:1999:i:4:p:427-439. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.