IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v64y2013i7p982-994.html
   My bibliography  Save this article

Joint optimization of fleet size and maintenance capacity in a fork-join cyclical transportation system

Author

Listed:
  • R Pascual

    (Department of Mining Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile)

  • A Martínez

    (Department of Mining Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile)

  • R Giesen

    (Department of Transport Engineering and Logistics, Pontificia Universidad Católica de Chile, Santiago, Chile)

Abstract

This article presents an asset management-oriented multi-criteria methodology for the joint estimation of a mobile equipment fleet size, and the maintenance capacity to be allocated in a productive system. Using a business-centred life-cycle perspective, we propose an integrated analytical model and evaluate it using global cost rate, availability and throughput as performance indicators. The global cost components include: (i) opportunity costs associated with lost production, (ii) vehicle idle time costs, and (iii) maintenance resources idle time costs. This multi-criteria approach allows a balanced scorecard to be built that identifies the main trade-offs in the system. The methodology uses an improved closed network queueing model approach to describe the production and maintenance areas. We test the proposed methodology using an underground mining operation case study. The decision variables are the size of a load-haul-dump fleet and specialized maintenance crew levels. Our model achieves savings of 20.6% in global cost terms with respect to a benchmark case. We also optimize the system to achieve desired targets of vehicle availability and system throughput (based on system utilization). The results show increments of 7.1% in vehicle availability and 13.5% in system throughput with respect to baseline case. For the case studied, these criteria also have a maximum, which allows for further improvement if desired. The results also show the importance of using balanced performance measures in the decision process. A multi-criteria optimization was also performed, showing the Pareto front of considered indicators. We discuss the trade-offs among different criteria, and the implications in finding balanced solutions. The proposed analytical approach is easy to implement and requires low computational effort. It also allows for an easy re-evaluation of resources when the business cycle changes and relevant exogenous factors vary.

Suggested Citation

  • R Pascual & A Martínez & R Giesen, 2013. "Joint optimization of fleet size and maintenance capacity in a fork-join cyclical transportation system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(7), pages 982-994, July.
  • Handle: RePEc:pal:jorsoc:v:64:y:2013:i:7:p:982-994
    as

    Download full text from publisher

    File URL: http://www.palgrave-journals.com/jors/journal/v64/n7/pdf/jors2012103a.pdf
    File Function: Link to full text PDF
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: http://www.palgrave-journals.com/jors/journal/v64/n7/full/jors2012103a.html
    File Function: Link to full text HTML
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nakousi, C. & Pascual, R. & Anani, A. & Kristjanpoller, F. & Lillo, P., 2018. "An asset-management oriented methodology for mine haul-fleet usage scheduling," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 336-344.
    2. Mohamed Amjath & Laoucine Kerbache & James MacGregor Smith, 2024. "A Closed Queueing Networks Approach for an Optimal Heterogeneous Fleet Size of an Inter-Facility Bulk Material Transfer System," Logistics, MDPI, vol. 8(1), pages 1-38, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:64:y:2013:i:7:p:982-994. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.