IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v62y2011i10p1898-1902.html
   My bibliography  Save this article

Parallel machines scheduling with a deteriorating maintenance activity

Author

Listed:
  • J-J Wang

    (School of Management, Dalian University of Technology, Dalian, China)

  • J-B Wang

    (School of Science, Shenyang Aerospace University, Shenyang, China)

  • F Liu

    (School of Management, Dalian University of Technology, Dalian, China)

Abstract

In this paper, we consider parallel identical machines scheduling problems with a deteriorating maintenance activity. In this model, each machine has a deteriorating maintenance activity, that is, delaying the maintenance increases the time required to perform it. We need to make a decision on when to schedule the deteriorating maintenance activities and the sequence of jobs to minimize total completion time. We provide a polynomial time algorithm to solve the total completion time minimization problem.

Suggested Citation

  • J-J Wang & J-B Wang & F Liu, 2011. "Parallel machines scheduling with a deteriorating maintenance activity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(10), pages 1898-1902, October.
  • Handle: RePEc:pal:jorsoc:v:62:y:2011:i:10:p:1898-1902
    as

    Download full text from publisher

    File URL: http://www.palgrave-journals.com/jors/journal/v62/n10/pdf/jors2010143a.pdf
    File Function: Link to full text PDF
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: http://www.palgrave-journals.com/jors/journal/v62/n10/full/jors2010143a.html
    File Function: Link to full text HTML
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chun-Lai Liu & Jian-Jun Wang, 2016. "Unrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under Consideration," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(01), pages 1-16, February.
    2. Shi-Sheng Li & Ren-Xia Chen, 2017. "Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-17, April.
    3. Kim, Hyunjoon & Kim, Byung-In, 2022. "Optimal sequence for single server scheduling incorporating a rate-modifying activity under job-dependent linear deterioration," European Journal of Operational Research, Elsevier, vol. 298(2), pages 439-450.
    4. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    5. Gara-Ali, Ahmed & Finke, Gerd & Espinouse, Marie-Laure, 2016. "Parallel-machine scheduling with maintenance: Praising the assignment problem," European Journal of Operational Research, Elsevier, vol. 252(1), pages 90-97.
    6. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    7. Zhusong Liu & Zhenyou Wang & Yuan-Yuan Lu, 2017. "A Bicriteria Approach for Single Machine Scheduling with Resource Allocation, Learning Effect and a Deteriorating Maintenance Activity," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-16, August.
    8. Rustogi, Kabir & Strusevich, Vitaly A., 2012. "Simple matching vs linear assignment in scheduling models with positional effects: A critical review," European Journal of Operational Research, Elsevier, vol. 222(3), pages 393-407.
    9. Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:62:y:2011:i:10:p:1898-1902. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.