IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v50y1999i7d10.1057_palgrave.jors.2600769.html
   My bibliography  Save this article

Two-machine open shop scheduling with special transportation times

Author

Listed:
  • D Rebaine

    (University of Tizi-Ouzou)

  • V A Strusevich

    (University of Greenwich)

Abstract

The paper considers a problem of scheduling n jobs in a two-machine open shop to minimise the makespan, provided that preemption is not allowed and the interstage transportation times are involved. In general, this problem is known to be NP-hard. We present a linear time algorithm that finds an optimal schedule if no transportation time exceeds the smallest of the processing times. We also describe an algorithm that creates a heuristic solution to the problem with job-independent transportation times. Our algorithm provides a worst-case performance ratio of 8/5 if the transportation time of a job depends on the assigned processing route. The ratio reduces to 3/2 if all transportation times are equal.

Suggested Citation

  • D Rebaine & V A Strusevich, 1999. "Two-machine open shop scheduling with special transportation times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 756-764, July.
  • Handle: RePEc:pal:jorsoc:v:50:y:1999:i:7:d:10.1057_palgrave.jors.2600769
    DOI: 10.1057/palgrave.jors.2600769
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2600769
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2600769?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    2. Averbakh, Igor & Berman, Oded & Chernykh, Ilya, 2005. "A -approximation algorithm for the two-machine routing open-shop problem on a two-node network," European Journal of Operational Research, Elsevier, vol. 166(1), pages 3-24, October.
    3. Munier-Kordon, Alix & Rebaine, Djamal, 2010. "The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 203(1), pages 42-49, May.
    4. Haiyan Wang & Chung‐Yee Lee, 2005. "Production and transport logistics scheduling with two transport mode choices," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(8), pages 796-809, December.
    5. Zhang, Xiandong & van de Velde, Steef, 2010. "On-line two-machine open shop scheduling with time lags," European Journal of Operational Research, Elsevier, vol. 204(1), pages 14-19, July.
    6. Wiesław Kubiak, 2023. "On the complexity of open shop scheduling with time lags," Journal of Scheduling, Springer, vol. 26(3), pages 331-334, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:50:y:1999:i:7:d:10.1057_palgrave.jors.2600769. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.