Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance

Author

Listed:
  • Karin Thörnblad
  • Ann-Brith Strömberg
  • Michael Patriksson
  • Torgny Almgren

Abstract

The multitask cell at GKN Aerospace Sweden is a flexible job shop containing ten resources aimed at being flexible with regard to product mix and processing types. We present a time-indexed formulation of the problem of optimally scheduling the planned jobs on the resources, also considering a limited availability of fixtures as well as required preventive maintenance activities. The objective is to minimise a weighted sum of the completion times and tardiness for the jobs, where the tardiness weight for a given job is a non-increasing function of its due date. We propose a fast iterative approach to finding a suitable value of the length of the time horizon that needs to be set for the time-indexed formulation and which considerably influences the computation time. Computational results show that the method developed is able to produce optimal, or near-optimal, schedules for real data instances within an acceptable practical time frame. [Received 1 October 2012; Revised 13 May 2013; Accepted 20 September 2013]

Suggested Citation

  • Karin Thörnblad & Ann-Brith Strömberg & Michael Patriksson & Torgny Almgren, 2015. "Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 9(1), pages 126-145.
  • Handle: RePEc:ids:eujine:v:9:y:2015:i:1:p:126-145
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=67451
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Song Jiu, 2021. "A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine," Journal of Heuristics, Springer, vol. 27(6), pages 991-1020, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:eujine:v:9:y:2015:i:1:p:126-145. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=210 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.