Author
Listed:
- Krpelik, Daniel
- Vrtal, Matej
- Bris, Radim
- Praks, Pavel
- Fujdiak, Radek
- Toman, Petr
Abstract
This paper presents a method for multi-criteria optimization of system operations using transient operation models. Real systems often combine long-living components with rapid repairs, creating challenges for numerical integration due to fine discretization requirements. These challenges significantly increase the computational cost when evaluating renewal processes with recurrent terms of quadratic complexity in mission time. To address this, we derive new mathematical formulas for evaluating unavailability and operational costs of components under periodic, age-based preventive restoration. The key innovation is a decomposition of the renewal equation: repair-related terms are approximated analytically, eliminating the need for fine discretization throughout the process. A special formula is introduced for components with uniformly distributed repair times and mean time to repair much shorter than mean time to failure, applicable to many real-world systems. The accuracy of the proposed approach is validated against Monte Carlo simulations, showing significant reduction in computational effort. This efficiency enables repeated evaluations in optimization tasks, demonstrated on a real-world case involving interconnected energy and communication infrastructure in the Czech Republic. A multi-objective NSGA-II algorithm is employed to optimize the preventive replacement policy, minimizing both system maintenance cost and expected downtime. We also explore systems with components of non-zero initial age. Results show that relying solely on asymptotic approximations may lead to suboptimal strategies, potentially worsening performance. However, allowing preventive renewal of selected components at time zero enables identification of superior solutions.
Suggested Citation
Krpelik, Daniel & Vrtal, Matej & Bris, Radim & Praks, Pavel & Fujdiak, Radek & Toman, Petr, 2026.
"Multi-objective optimization of smart grid operations via preventive maintenance scheduling using time-dependent unavailability,"
Reliability Engineering and System Safety, Elsevier, vol. 265(PA).
Handle:
RePEc:eee:reensy:v:265:y:2026:i:pa:s0951832025007677
DOI: 10.1016/j.ress.2025.111567
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:265:y:2026:i:pa:s0951832025007677. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.