- Díaz-Pastor, Santos J.
- de Abajo, Carlos
- Stoner, Robert
- Pérez-Arriaga, Ignacio J.
Abstract
Achieving universal electricity access requires more than a least-cost electrification plan. In many low- and middle-income power sectors, affordability constraints, distressed distribution utilities, and high perceived risk prevent least-cost pathways from being implemented by raising the cost of capital. This paper develops an integrated regulatory–financial framework that completes least-cost planning by linking: (i) techno-economic analysis across grid and off-grid options; (ii) implementable business models under cost-of-service regulation; and (iii) a financing architecture that coordinates public resources, concessional instruments, and commercial capital through a centralized platform that pools and ring-fences flows and disbursement rules. The results separate two implementation constraints. The first is the “viability gap”, the shortfall between realized cash revenues and the regulated cost of service when affordability and weak retail performance prevent full annual recovery. The second is “financing needs”, which arise because electrification requires large upfront investment, while cost recovery occurs gradually, even when the plan is viable in the long run. The framework clarifies the policy levers: viability gaps require explicit and predictable compensation mechanisms, while financing needs require capital structures, tenors, and liquidity facilities aligned with the regulatory recovery schedule and allowed returns sufficient to cover financing costs and preserve equity value. The approach provides a transferable methodology for regulators and policymakers to move from least-cost targets to implementable electrification programs with revenue adequacy and financeable cash-flow trajectories. It is illustrated with applications in Rwanda and Uganda, showing how the same logic can be parameterized across institutional forms to support universal access.
Suggested Citation
Díaz-Pastor, Santos J. & de Abajo, Carlos & Stoner, Robert & Pérez-Arriaga, Ignacio J., 2026.
"From least-cost plans to implementable electrification: A regulatory–financial framework to achieve universal access,"
Utilities Policy, Elsevier, vol. 101(C).
Handle:
RePEc:eee:juipol:v:101:y:2026:i:c:s0957178726000809
DOI: 10.1016/j.jup.2026.102221
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:101:y:2026:i:c:s0957178726000809. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.sciencedirect.com/journal/utilities-policy .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.