Abstract
An efficient very short-term load forecast (VSTLF) is essential for power plant unit scheduling because it reduces the planning uncertainty caused by variable renewable energy outputs, which in turn decreases the overall electricity production costs in a power production system. Even though this sector has seen a number of studies and applications in plant scheduling, improving projections with minimum errors is still necessary. In this paper, a novel machine learning framework for predicting very short-term electricity usage was developed. The data utilized in this study are publicly available and were accessed from Kaggle's platform. The framework involved two pivotal stages in its development: robust feature engineering and electric load forecasting via a Prophet-XGBoost-CatBoost (Pr-XGB-CB) model. Feature engineering involves the use of multiple sets of historical electricity consumption data with different time lags for analysis and enhancement. Prophet dissects forecasted data into understandable seasonal, trend, and holiday segments, whereas XGBoost stands out for its speed and effectiveness, especially when dealing with numerous features. To obtain the ensembled forecast, the CatBoost algorithm was utilized. The optimal hyperparameters for the model are evaluated by Optuna. The effectiveness of the suggested model was evaluated by contrasting its performance with that of five alternative machine learning (ML) and deep learning (DL) algorithms. In addition, a sensitivity analysis was conducted to assess the model's robustness under scenarios of missing or limited data, demonstrating its resilience in real-world applications. The proposed framework outperformed the state-of-the-art (SOTA) models, with a Mean Absolute Error (MAE) of 23.70, Root Mean Squared Error (RMSE) of 32.32, and an R2 of 0.97; hence, the proposed framework performs an efficient guiding role in electrical load prediction. This research offered practical significance by enhancing power plant scheduling efficiency and reducing overall electricity production costs through superior predictive accuracy.
Suggested Citation
Shafiuzzaman, Md & Safayet Islam, Md & Rubaith Bashar, T.M. & Munem, Mohammad & Nahiduzzaman, Md & Ahsan, Mominul & Haider, Julfikar, 2025.
"Enhanced very short-term load forecasting with multi-lag feature engineering and prophet-XGBoost-CatBoost architecture,"
Energy, Elsevier, vol. 335(C).
Handle:
RePEc:eee:energy:v:335:y:2025:i:c:s0360544225036230
DOI: 10.1016/j.energy.2025.137981
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:335:y:2025:i:c:s0360544225036230. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.