Optimal scheduling and benefit sharing of hybrid pumped storage hydropower plants with multiple operators

Author

Listed:
  • Xie, Zhengyi
  • Wang, Yimin
  • Chang, Jianxia
  • Guo, Aijun
  • Niu, Chen
  • Zheng, Yongheng
  • Tian, Zelin

Abstract

Retrofitting cascade hydropower stations (CHPs) with pumped storage units (PSs) to form hybrid pumped storage hydropower plants (HPSHs) can effectively mitigate peaking pressures on power systems. However, the multi-stakeholder structure of CHPs greatly limits the regulatory flexibility of HPSHs. To conquer the issue, a multi-timescale peak-shaving operation strategy and an internal benefit allocation mechanism for HPSHs involving multiple stakeholders are proposed. First, a joint scheduling model is developed to optimize the peak-shaving operation of HPSHs across both mid-long and short-term timescales, guided by electricity price signals. The operational impacts of PSs on the power generation and economic returns of CHPs are then quantitatively assessed. Finally, a benefit compensation framework is designed using the Shapley value method to allocate profits among multiple generation entities within HPSHs. It was found that: (1) the proposed price-driven multi-timescale scheduling model enhances the peak-shaving capability of HPSHs across both mid-long and short-term horizons. (2) PSs operations increase the power generation and revenue of the upstream station by 0.04 % and 0.03 %, respectively, while the downstream station experiences a 0.42 % reduction in output but sees a 0.50 % increase in profitability; (3) equitable allocation of joint scheduling benefits improves the profits of upstream and downstream hydropower stations by 6 % and 19.5 %, respectively, thereby enhancing their willingness to engage in coordinated scheduling with PSs.

Suggested Citation

  • Xie, Zhengyi & Wang, Yimin & Chang, Jianxia & Guo, Aijun & Niu, Chen & Zheng, Yongheng & Tian, Zelin, 2025. "Optimal scheduling and benefit sharing of hybrid pumped storage hydropower plants with multiple operators," Energy, Elsevier, vol. 333(C).
  • Handle: RePEc:eee:energy:v:333:y:2025:i:c:s0360544225028841
    DOI: 10.1016/j.energy.2025.137242
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0360544225028841
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.energy.2025.137242?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:333:y:2025:i:c:s0360544225028841. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.