IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v334y2026i2p604-620.html

Procurement scheduling for Assemble-to-Order systems

Author

Listed:
  • Pang, Huiyuan
  • Zhen, Lu
  • Wang, Shuaian
  • Laporte, Gilbert

Abstract

Due to the increasing complexity and diversity of customer demand, assemble-to-order (ATO) systems should account for more realistic factors in their procurement decisions. The classical literature offers analytical elegance but oversimplifies reality. This study bridges this gap by developing a multi-period procurement problem for multi-product ATO systems under scenario-based demand uncertainty, considering realistic factors like varying product prices, bill of materials (BOM) structures, multiple suppliers with different lead times and costs, and contract options provided by suppliers with different discount prices. A multi-stage stochastic programming model is formulated to maximize the profit of the ATO system by optimally making decisions on (i) pre-stocked inventory, (ii) supplier selection, (iii) contract signing with options, and (iv) assembly planning. To solve the model efficiently, we propose an exact Benders decomposition algorithm with tailored subproblem (SP) relaxation, valid inequalities, and Pareto-optimal cuts. Experiments based on real data validate the exact algorithm’s effectiveness. For large-scale instances, the proposed algorithm improves the objective value by 13.7% over Gurobi’s best-found solution within a one-hour time limit. To further accelerate the algorithm, we introduce an efficient scenario reduction method based on forward-looking distance matrices. The proposed reduction method is proven to be more effective than traditional approaches, improving solution quality by up to 15.4% while accelerating computation by a factor of 3.5. This study also provides managerial insights for contract design, pre-stocking strategies, and supplier selection. For example, decision-makers should negotiate with suppliers for more contract options in volatile markets, prioritize slow suppliers while maintaining a pool of fast suppliers as backups, and increase pre-stocked inventory for those with high and very high commonality.

Suggested Citation

  • Pang, Huiyuan & Zhen, Lu & Wang, Shuaian & Laporte, Gilbert, 2026. "Procurement scheduling for Assemble-to-Order systems," European Journal of Operational Research, Elsevier, vol. 334(2), pages 604-620.
  • Handle: RePEc:eee:ejores:v:334:y:2026:i:2:p:604-620
    DOI: 10.1016/j.ejor.2026.01.043
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221726000858
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2026.01.043?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:334:y:2026:i:2:p:604-620. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.