Duration forecasting in resource constrained projects: A hybrid risk model combining complexity indicators with sensitivity measures
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2025.03.012
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.References listed on IDEAS
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Martens, Annelies & Vanhoucke, Mario, 2019. "The impact of applying effort to reduce activity variability on the project time and cost performance," European Journal of Operational Research, Elsevier, vol. 277(2), pages 442-453.
- Ünsal-Altuncan, Izel & Vanhoucke, Mario, 2024. "A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks," European Journal of Operational Research, Elsevier, vol. 315(2), pages 511-527.
- De Reyck, Bert & Herroelen, Willy, 1996. "On the use of the complexity index as a measure of complexity in activity networks," European Journal of Operational Research, Elsevier, vol. 91(2), pages 347-366, June.
- Wauters, Mathieu & Vanhoucke, Mario, 2017. "A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1097-1111.
- Dale F. Cooper, 1976. "Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation," Management Science, INFORMS, vol. 22(11), pages 1186-1194, July.
- Vanhoucke, Mario, 2010. "Using activity sensitivity and network topology information to monitor project time performance," Omega, Elsevier, vol. 38(5), pages 359-370, October.
- Rob Eynde & Mario Vanhoucke & José Coelho, 2024. "On the summary measures for the resource-constrained project scheduling problem," Annals of Operations Research, Springer, vol. 337(2), pages 593-625, June.
- Mario Vanhoucke & Erik Demeulemeester & Willy Herroelen, 2001. "On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints," Management Science, INFORMS, vol. 47(8), pages 1113-1121, August.
- Rosseel, Yves, 2012. "lavaan: An R Package for Structural Equation Modeling," Journal of Statistical Software, Foundation for Open Access Statistics, vol. 48(i02).
- R. Van Eynde & Mario Vanhoucke & José Coelho, 2024. "Correction to: On the summary measures for the resource-constrained project scheduling problem," Annals of Operations Research, Springer, vol. 332(1), pages 1309-1309, January.
- M Vanhoucke & S Vandevoorde, 2007.
"A simulation and evaluation of earned value metrics to forecast the project duration,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1361-1374, October.
- M. Vanhoucke & S. Vandevoorde, 2005. "A simulation and evaluation of earned value metrics to forecast the project duration," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 05/317, Ghent University, Faculty of Economics and Business Administration.
- Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
- Gupta, Sumeet & Kim, Hee W., 2008. "Linking structural equation modeling to Bayesian networks: Decision support for customer retention in virtual communities," European Journal of Operational Research, Elsevier, vol. 190(3), pages 818-833, November.
- James H. Patterson, 1976. "Project scheduling: The effects of problem structure on heuristic performance," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 23(1), pages 95-123, March.
- Elmaghraby, Salah E. & Herroelen, Willy S., 1980. "On the measurement of complexity in activity networks," European Journal of Operational Research, Elsevier, vol. 5(4), pages 223-234, October.
- Scutari, Marco, 2010. "Learning Bayesian Networks with the bnlearn R Package," Journal of Statistical Software, Foundation for Open Access Statistics, vol. 35(i03).
- Anthony A. Mastor, 1970. "An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques," Management Science, INFORMS, vol. 16(11), pages 728-746, July.
- Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2021. "Using Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 288(3), pages 736-752.
- Cho, Sungbin, 2009. "A linear Bayesian stochastic approximation to update project duration estimates," European Journal of Operational Research, Elsevier, vol. 196(2), pages 585-593, July.
- Vanhoucke, Mario & Coelho, Jose & Debels, Dieter & Maenhout, Broos & Tavares, Luis V., 2008. "An evaluation of the adequacy of project network generators with systematically sampled networks," European Journal of Operational Research, Elsevier, vol. 187(2), pages 511-524, June.
- Van Eynde, Rob & Vanhoucke, Mario, 2022. "New summary measures and datasets for the multi-project scheduling problem," European Journal of Operational Research, Elsevier, vol. 299(3), pages 853-868.
- Valadares Tavares, L. & Antunes Ferreira, J. & Silva Coelho, J., 1999. "The risk of delay of a project in terms of the morphology of its network," European Journal of Operational Research, Elsevier, vol. 119(2), pages 510-537, December.
- Vanhoucke, Mario, 2011. "On the dynamic use of project performance and schedule risk information during projecttracking," Omega, Elsevier, vol. 39(4), pages 416-426, August.
- W Herroelen & B De Reyck, 1999. "Phase transitions in project scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(2), pages 148-156, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Siyao Liu & Changfeng Wang, 2025. "Research on External Risk Prediction of Belt and Road Initiative Major Projects Based on Machine Learning," Sustainability, MDPI, vol. 17(20), pages 1-20, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Artigues, Christian & Hartmann, Sönke & Vanhoucke, Mario, 2026. "Fifty years of research on resource-constrained project scheduling explored from different perspectives," European Journal of Operational Research, Elsevier, vol. 328(2), pages 367-389.
- Ünsal-Altuncan, Izel & Vanhoucke, Mario, 2024. "A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks," European Journal of Operational Research, Elsevier, vol. 315(2), pages 511-527.
- Song, Jie & Song, Jinbo & Vanhoucke, Mario, 2025. "Automatic selection of the best performing control point approach for project control with resource constraints," European Journal of Operational Research, Elsevier, vol. 322(1), pages 15-38.
- Rob Eynde & Mario Vanhoucke & José Coelho, 2024. "On the summary measures for the resource-constrained project scheduling problem," Annals of Operations Research, Springer, vol. 337(2), pages 593-625, June.
- M. Vanhoucke & J. Coelho & L. V. Tavares & D. Debels, 2004.
"On The Morphological Structure Of A Network,"
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium
04/272, Ghent University, Faculty of Economics and Business Administration.
- Vanhoucke, Mario & Coelho, José & Debels, Dieter & Tavares, Luis V., 2005. "On the morphological structure of a network," Vlerick Leuven Gent Management School Working Paper Series 2005-9, Vlerick Leuven Gent Management School.
- Fangfang Cao & Tom Servranckx & Zhengwen He & Mario Vanhoucke, 2025. "A buffer allocation evolutionary algorithm for resource-constrained projects with activity clusters," Journal of Scheduling, Springer, vol. 28(5), pages 483-511, October.
- Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2020. "The impact of a limited budget on the corrective action taking process," European Journal of Operational Research, Elsevier, vol. 286(3), pages 1070-1086.
- Messelis, Tommy & De Causmaecker, Patrick, 2014. "An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 233(3), pages 511-528.
- Guo, Weikang & Vanhoucke, Mario & Coelho, José, 2023. "A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 579-595.
- Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2021. "Using Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 288(3), pages 736-752.
- Mario Vanhoucke, 2002.
"Optimal due date assignment in project scheduling,"
Vlerick Leuven Gent Management School Working Paper Series
2002-19, Vlerick Leuven Gent Management School.
- M. Vanhoucke, 2002. "Optimal Due Date Assignment In Project Scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 02/159, Ghent University, Faculty of Economics and Business Administration.
- Colin, Jeroen & Vanhoucke, Mario, 2014. "Setting tolerance limits for statistical project control using earned value management," Omega, Elsevier, vol. 49(C), pages 107-122.
- Song, Jie & Martens, Annelies & Vanhoucke, Mario, 2022. "Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control," European Journal of Operational Research, Elsevier, vol. 297(2), pages 451-466.
- Vaseghi, Forough & Martens, Annelies & Vanhoucke, Mario, 2024. "Analysis of the impact of corrective actions for stochastic project networks," European Journal of Operational Research, Elsevier, vol. 316(2), pages 503-518.
- V. Van Peteghem & M. Vanhoucke, 2009. "Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 09/595, Ghent University, Faculty of Economics and Business Administration.
- Vanhoucke, Mario & Coelho, Jose & Debels, Dieter & Maenhout, Broos & Tavares, Luis V., 2008. "An evaluation of the adequacy of project network generators with systematically sampled networks," European Journal of Operational Research, Elsevier, vol. 187(2), pages 511-524, June.
- Wauters, Mathieu & Vanhoucke, Mario, 2017. "A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1097-1111.
- Martens, Annelies & Vanhoucke, Mario, 2017. "A buffer control method for top-down project control," European Journal of Operational Research, Elsevier, vol. 262(1), pages 274-286.
- Vanhoucke, Mario, 2011. "On the dynamic use of project performance and schedule risk information during projecttracking," Omega, Elsevier, vol. 39(4), pages 416-426, August.
- She, Bingling & Chen, Bo & Hall, Nicholas G., 2021. "Buffer sizing in critical chain project management by network decomposition," Omega, Elsevier, vol. 102(C).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:325:y:2025:i:2:p:329-343. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/eee/ejores/v325y2025i2p329-343.html