Abstract
High-penetration photovoltaic (PV) plants introduce short-term power fluctuations that can violate grid-code ramp-rate limits and lead to penalization. Although battery energy storage systems (BESS) are widely used to enforce ramp-rate constraints, the impact of practical time delays arising from sensing, control execution, communication, converter dynamics, and battery response is typically neglected or treated heuristically in existing studies. This paper proposes a deterministic, measurement-driven framework to quantify how time delay degrades ramp-rate compliance and to prescribe delay-robust mitigation measures for different PV plant sizes and grid-code requirements. The framework is developed using one-year field measurements sampled at 5 s from the 38.5 MW Amaraleja PV plant in Portugal (including subsections from 0.55 MW to 38.5 MW), complemented by validation with datasets from Navarra, Spain, and experimental observations from a 1 MW PV–BESS facility indicating an overall delay of approximately 3 s. The results demonstrate that implementation delays can significantly increase ramp-rate non-compliance, potentially triggering curtailment penalties under strict grid-code regimes. To address this issue, two complementary solutions are proposed to achieve zero non-compliance without requiring costly hardware upgrades: (i) ramp-rate parameterization, which adjusts the internal ramp limit to account for delay effects, and (ii) a deterministic tolerance-based approach for grid-code amendment. The proposed framework provides a systematic methodology to ensure reliable ramp-rate compliance under realistic operating conditions, offering practical guidance for both plant operators and system operators.
Suggested Citation
Abdelemam, Ahmed M. & Habib, Salman & Abdallah, Ammar Atif & Gulzar, Muhammad Majid & El Moursi, Mohamed Shawky & Abdel-Hamid, Radwan Hassan, 2026.
"Time delay consequences on ramp rate control for grid-connected PV systems: A deterministic approach to grid code compliance,"
Applied Energy, Elsevier, vol. 419(C).
Handle:
RePEc:eee:appene:v:419:y:2026:i:c:s0306261926007439
DOI: 10.1016/j.apenergy.2026.128091
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:appene:v:419:y:2026:i:c:s0306261926007439. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/description#description .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.