IDEAS home Printed from https://ideas.repec.org/a/clh/resear/v10y2017i1.html
   My bibliography  Save this article

Public-Interest Benefit Evaluation of Partial-Upgrading Technology

Author

Listed:
  • G. Kent Fellows

    (The School of Public Policy, University of Calgary)

  • Robert Mansell

    (The School of Public Policy, University of Calgary)

  • Ronald Schlenker

    (Department of Economics, University of Calgary)

  • Jennifer Winter

    (The School of Public Policy, University of Calgary)

Abstract

Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent) to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial) pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the long term, it would also provide important benefits to Alberta from a social perspective. Since partially upgraded crude can be shipped via pipeline without diluent (as bitumen requires), producing it in Alberta would free up pipeline capacity otherwise tied up by current volumes of diluted bitumen or dilbit (diluent typically represents about one-third of each barrel of dilbit). It also reduces the cost to shippers of paying tolls for diluent exported in the dilbit and recovering diluent at the U.S. pipeline terminal, where it is less valuable than if it were recovered in Alberta at the partial upgrader. The value of each barrel produced would also be higher, benefitting oil sands producers. Partial upgrading also seems to promise a lower emissions-intensity profile compared to other bitumen-processing technologies. Based on the model of a single 100,000-barrel-a-day partial upgrader, the value uplift could be $10 to $15 per bitumen barrel. Meanwhile, there could be an average annual increase to Alberta’s GDP of $505 million, and as many as 179,000 person-years of employment created (assuming a 40.5-year operating period). The increase in taxable earnings would increase provincial revenues by an average of $60 million a year, not including additional federal tax revenues. If successful, there would be many such partial upgraders with corresponding multiplication of these benefits. But there remains the critical task of proving partial upgrading technology at a higher scale than current testing. This might also depend on the province helping sustain investors through the “death-valley” between successful research and initial testing and demonstration of full commercial viability. The province has stepped into help technologies cross that “death valley” before. The promise of partial upgrading may well justify, as manager and steward of Alberta’s resources, helping bridge that valley again.

Suggested Citation

  • G. Kent Fellows & Robert Mansell & Ronald Schlenker & Jennifer Winter, 2017. "Public-Interest Benefit Evaluation of Partial-Upgrading Technology," SPP Research Papers, The School of Public Policy, University of Calgary, vol. 10(1), January.
  • Handle: RePEc:clh:resear:v:10:y:2017:i:1
    as

    Download full text from publisher

    File URL: http://www.policyschool.ca/wp-content/uploads/2017/03/PIB-Evaluation-Fellows-Mansell-Schlenker-Winter-final3.pdf
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guo, John & Orellana, Andrea & Sleep, Sylvia & Laurenzi, Ian J. & MacLean, Heather L. & Bergerson, Joule A., 2020. "Statistically enhanced model of oil sands operations: Well-to-wheel comparison of in situ oil sands pathways," Energy, Elsevier, vol. 208(C).
    2. Garret Kent Fellows & Jennifer Winter & Alaz Munzur, 2023. "An Analysis of Industrial Policy Mechanisms to Support Commercial Deployment of Bitumen Partial Upgrading in Alberta," Energies, MDPI, vol. 16(6), pages 1-49, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:clh:resear:v:10:y:2017:i:1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Bev Dahlby (email available below). General contact details of provider: https://edirc.repec.org/data/spcalca.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.