Author
Listed:
- Kithinji Makena Immaculate
- Mathias Nzomo Muinde
- Agnes Mungania
Abstract
Purpose: The study sought to establish the influence of contract management on performance of roads construction projects in Kenya Urban Roads Authority. It was anchored in the institutional theory. Methodology: The study adopted descriptive research design. The target population involved the Kenya Urban Roads Authority in the Upper Eastern Region. The total population for the study was 145 staffs. Using Slovin’s formulae and stratified random sampling, the study sample size was determined to be 106 respondents. The study used structured questionnaires to gather primary data. A 10% of the study sample population was used for pilot testing in Kenya urban roads, central region. In the data processing and analysis, the quantitative data collected was analyzed using SPSS version 26 where descriptive statistics, including means, and standard deviations was analyzed. Inferential analysis focusing on correlation analysis and regression analysis was also done. The results were summarized using tables and figures. Findings: The findings indicated that contract management practices had a strong influence on project performance. These findings suggest that improvements in contract management, particularly in feedback mechanisms, compliance, relationship building, and risk management, can significantly enhance the success of road construction projects managed by the Kenya Urban Roads Authority. Unique Contribution to Theory, Practice and Policy: The study demonstrates that contract management measured by contractor collaboration, legal compliance, and risk management together drive better contract performance in road construction projects. It integrates relational, institutional, and risk frameworks to extend contract-management aspects in devolved infrastructure settings. Practically, it offers actionable measures to reduce delays, cost overruns and defects. Lastly, it supports reforms on contract clauses, enforcement, and payment/retention rules to boost accountability and value-for-money.
Suggested Citation
Kithinji Makena Immaculate & Mathias Nzomo Muinde & Agnes Mungania, 2025.
"Contract Management and Performance of Roads Construction Projects in Kenya Urban Roads Authority,"
International Journal of Supply Chain and Logistics, CARI Journals Limited, vol. 9(8), pages 39-55.
Handle:
RePEc:bhx:oijscl:v:9:y:2025:i:8:p:39-55:id:3188
Download full text from publisher
References listed on IDEAS
- Anne Wanjiru Karoki & Dr. Patrick Mwangangi, 2020.
"Influence of Contract Management on Performance of Public Hospitals in Nairobi City County, Kenya,"
International Journal of Supply Chain and Logistics, CARI Journals Limited, vol. 4(1), pages 46-69.
- Riza Yosia Sunindijo & Patrick X.W. Zou, 2011.
"CHPT construct: essential skills for construction project managers,"
International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 3(2), pages 139-163.
Full references (including those not matched with items on IDEAS)
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bhx:oijscl:v:9:y:2025:i:8:p:39-55:id:3188. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chief Editor (email available below). General contact details of provider: https://carijournals.org/journals/IJSCL/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.