IDEAS home Printed from https://ideas.repec.org/a/bcp/journl/v9y2025issue-9p7405-7419.html

Cost Structure of Direct and Indirect Cost During Pre-Construction Stage in Construction EPC Project of Built Environment in Indonesia

Author

Listed:
  • Muhammad Fahmi

    (School of Built Environment, University Technology Sarawak, 96000 Sibu, Sarawak, Malaysia)

  • Mohd Saidin Misnan

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Johor Bahru, Johor, Malaysia)

  • Syamsul Hendra Mahmud

    (Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310, Johor Bahru, Johor, Malaysia)

  • Yulcherlina

    (Faculty of Civil Engineering and Planning, Bung Hatta University, Jalan Sumatera Ulak Karang, 25134, Indonesia)

Abstract

The construction industry in Indonesia has experienced significant growth, particularly in Engineering, Procurement, and Construction (EPC) projects for the built environment. Efficient management of direct and indirect costs during the pre-construction stage is critical for project success, impacting budget adherence, timelines, and quality standards. This research analyzes the cost structure of direct and indirect costs in Indonesian EPC projects, focusing on the pre-construction phase. By comparing cost components across 116 projects in the mining and data center sectors from 2020 to 2024, the study identifies patterns in cost allocation and key factors influencing cost structure, such as project size, location, industry, and remoteness. The findings reveal that medium-scale projects and those in the mining sector demonstrate optimal direct cost efficiency, while projects in remote areas tend to manage indirect costs more effectively. The research highlights the importance of context, specific strategies in cost management and recommends future longitudinal studies to compare pre-construction estimates with actual costs, development of a weighted remote scale index, and detailed investigation of indirect cost components. These insights aim to support better financial planning, resource allocation, and risk mitigation in future EPC projects in Indonesia.

Suggested Citation

  • Muhammad Fahmi & Mohd Saidin Misnan & Syamsul Hendra Mahmud & Yulcherlina, 2025. "Cost Structure of Direct and Indirect Cost During Pre-Construction Stage in Construction EPC Project of Built Environment in Indonesia," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(9), pages 7405-7419, September.
  • Handle: RePEc:bcp:journl:v:9:y:2025:issue-9:p:7405-7419
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-9-issue-9/7405-7419.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijriss/articles/cost-structure-of-direct-and-indirect-cost-during-pre-construction-stage-in-construction-epc-project-of-built-environment-in-indonesia/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:issue-9:p:7405-7419. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.