IDEAS home Printed from https://ideas.repec.org/a/bcp/journl/v9y2025issue-8p5279-5290.html

Assessment of Level of Bim Integration into Working Drawing and Specification within the Nigerian Construction Industry

Author

Listed:
  • Shafe Ezekiel B

    (Department of Architecture, College of Environmental Science and Management Caleb University, Imota, Ikorodu, Lagos, Nigeria)

  • Amao Abdulkhaliq O

    (Department of Architecture, College of Environmental Science and Management Caleb University, Imota, Ikorodu, Lagos, Nigeria)

  • Alagbe Faithfulness Ifeoluwa

    (Department of Architecture, College of Environmental Science and Management Caleb University, Imota, Ikorodu, Lagos, Nigeria)

  • Bamidele J. ADEWUMI

    (Department of Architecture, College of Environmental Science and Management Caleb University, Imota, Ikorodu, Lagos, Nigeria)

  • Adekunle O. OGUNNAIKE

    (Department of Architecture, College of Environmental Science and Management Caleb University, Imota, Ikorodu, Lagos, Nigeria)

Abstract

Building Information Modelling (BIM) has emerged as a game-changing tool in international construction, enhancing lifecycle efficiency, documentation correctness, and teamwork. But BIM adoption is still low in Nigeria, especially when it comes to creating functional drawings and specifications, which are essential for a project's success. This study investigated the amount of BIM integration into key documentation procedures throughout the Nigerian construction industry. 539 experts from the architectural, engineering, and construction (AEC) fields were given standardised questionnaires as part of a quantitative study design. Responses were analysed using descriptive statistics and the Relative Importance Index (RI). The results show that even while working drawings are produced using BIM programs like Revit and ArchiCAD, many experts still export their outputs into 2D formats for real-world applications. The majority of practitioners prepare specifications manually or as separate documents, and there is little integration of specifications directly into BIM settings. Lack of training, software expense, low client demand, and dependence on conventional CAD systems are some of the main obstacles that have been found. Notwithstanding these difficulties, the survey discovered that experts are aware of how BIM can improve precision, coordination, and design effectiveness. In order to encourage broad adoption, the study finds that BIM integration in Nigeria is still at the fundamental level and suggests focused training, policy enforcement, and workflow standardisation. This study adds to the current discussion on the digital transformation of the construction industry and provides useful tactics for enhancing the quality of documentation in emerging economies using BIM.

Suggested Citation

  • Shafe Ezekiel B & Amao Abdulkhaliq O & Alagbe Faithfulness Ifeoluwa & Bamidele J. ADEWUMI & Adekunle O. OGUNNAIKE, 2025. "Assessment of Level of Bim Integration into Working Drawing and Specification within the Nigerian Construction Industry," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(8), pages 5279-5290, August.
  • Handle: RePEc:bcp:journl:v:9:y:2025:issue-8:p:5279-5290
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-9-issue-8/5279-5290.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijriss/articles/assessment-of-level-of-bim-integration-into-working-drawing-and-specification-within-the-nigerian-construction-industry/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. W. K. Alugbue & G.A. Otuonuyo & B.J. Adewumi & A.O. Onamade & O.A. Asaju, 2024. "Impact of Specification on Construction Administration for Project Management Within Lagos Megacity," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(3s), pages 4664-4680, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. ADEWUMI, Bamidele J. & ONAMADE, Akintunde O. & DAVID-MUKORO, Kesena D. & BAMILOYE, Mercy I. & OTUONUYO George A. & CHUKWUKA Obianuju P. & ORU Theresa O., 2025. "Quality Reassurance in Construction Project: Leveraging Specifications for Standards and Testing Materials/ Workmanship," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(3), pages 1662-1672, March.
    2. Emesiobi, P.M. & Otuonuyo, G.A. & Adewumi, Bamidele, J. & Asaju, Opeyemi, A. & Onamade, A.O., 2024. "Specification: A Key Tool for Efficient Facility Management in Lagos Megacity," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(11), pages 2717-2727, November.
    3. repec:bjc:journl:v:12:y:2025:i:9:p:2628-2635 is not listed on IDEAS
    4. Andrew Chiduzie EKUGO & Helen O. ODEYEMI & Stephen Oyebisi TITILOYE & Bamidele Jonathan ADEWUMI & Adekunle Owolabi OGUNNAIKE, 2025. "Impact of Precision on Working Drawing and Specification in the Nigerian Construction Industry," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(8), pages 7822-7834, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:issue-8:p:5279-5290. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.