IDEAS home Printed from https://ideas.repec.org/a/bcp/journl/v9y2025issue-5p6230-6242.html
   My bibliography  Save this article

BIM in Chinese High-Rise Building Projects: Challenges to Adoption and Strategic Recommendations

Author

Listed:
  • Salman Riazi Mehdi Riazi

    (School of Housing, Building and Planning, University Sains Malaysia, 11800 USM, Penang)

  • Hao Zelong

    (School of Housing, Building and Planning, University Sains Malaysia, 11800 USM, Penang)

  • Meng Zichen

    (School of Housing, Building and Planning, University Sains Malaysia, 11800 USM, Penang)

  • Liu Qianwen

    (School of Housing, Building and Planning, University Sains Malaysia, 11800 USM, Penang)

Abstract

Building Information Modeling (BIM) is a key innovation for dealing with many issues troubling the construction industry, especially in dealing with complex projects, like high-rise building projects. Despite the well-documented benefits of BIM, such as increased efficiency, greater accuracy, better collaboration, and reduced errors in workflows, its adoption in China is still limited. This gap in adoption, given the context of rapid urbanization and increased demand in housing, presents a clear challenge in meeting industry expectations and other stakeholder requirements. Even though the Ministry of Housing and Urban-Rural Development acknowledges the advantages of BIM and actively encourages its integration into construction processes, there are still numerous barriers to its adoption. This research focuses on identifying the barriers that hinder the application of BIM and offers solutions to overcome these challenges, emphasizing on high-rise building projects in China. 200 close-ended questionnaires were distributed and 132 usable responses were received, resulting in a 66 percent response rate. Data was analyzed using the Statistical Package for Social Sciences (SPSS). Respondents were balanced in terms of gender and most of them pose commendable education level and industry experience. Most of them also are directly linked to site-based operations hence, experienced insights were offered. As outlined in the analysis, major barriers that were noted include the need for advanced technical expertise, high implementation costs, and a limited understanding of BIM’s long-term ROI. Combined, these obstacles have created an insufficient pool of skilled BIM professionals and delayed industry-wide adoption. To resolve these concerns, ways forward include improving stakeholder communication to promote streamlined workflows, government policy action, strategic incentive design, targeted training program accessibility, and reduced financial barriers to adoption. Altogether, these approaches alleviate barriers associated with the integration of BIM technology in high-rise building construction in China.

Suggested Citation

  • Salman Riazi Mehdi Riazi & Hao Zelong & Meng Zichen & Liu Qianwen, 2025. "BIM in Chinese High-Rise Building Projects: Challenges to Adoption and Strategic Recommendations," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(5), pages 6230-6242, May.
  • Handle: RePEc:bcp:journl:v:9:y:2025:issue-5:p:6230-6242
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-9-issue-5/6230-6242.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijriss/articles/bim-in-chinese-high-rise-building-projects-challenges-to-adoption-and-strategic-recommendations/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:issue-5:p:6230-6242. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.