Author
Listed:
- Idris I. Oshin
(Department of Project Management Technology Faculty of Management Sciences, Lagos State University, Lagos, Nigeria)
- Rukayat O. Pelumi
(Department of Project Management Technology Faculty of Management Sciences, Lagos State University, Lagos, Nigeria)
- Riyanat O. Tiamiyu
(Department of Project Management Technology Faculty of Management Sciences, Lagos State University, Lagos, Nigeria)
Abstract
Nigeria, like most other developing nations, is experiencing a rapid increase in population with the attendant environmental change which create more centers of daily activities, and the intensity of these centers are of increasing environmental liabilities. Society is currently disposing of tons of waste at designated landfills per day. The sorting facilities are currently saturated, and this is becoming a menace to society. This study seeks to determine the impact of Project Scheduling (PS) and Project Monitoring on the 3Rs of Waste Management. (Reduce, Reuse and Recycle) of some selected waste management companies in Lagos State. Survey research design was adopted for this study. The stratified random sampling technique was employed in selecting 129 staff randomly selected from the population. Data was gotten from primary source by using structured questionnaire. The study considered construct and content validities. To test relevant hypotheses, Multiple Regression analysis was adopted. The study found out that there is a strong positive relationship among Project Scheduling, Project monitoring and the 3Rs of Waste Management (R = 0.703)70.3%; the coefficient of multiple determination (Adj. R2 = 0.486) shows that 48.6% of the change in the 3Rs of Waste Management is accounted for by Project Scheduling and Project Monitoring. This implies that Project Scheduling and Project monitoring has a strong influence on the 3Rs of Waste Management. It was therefore recommended that Proper implementation of the 3Rs of Waste Management should be adopted by Waste Management organisations in other to ensure that Project Scheduling and Project Monitoring are adequately executed in other to enhance the Performance of Waste.
Suggested Citation
Idris I. Oshin & Rukayat O. Pelumi & Riyanat O. Tiamiyu, 2025.
"Project Management Techniques and Performance of Selected Solid Waste Management Companies in Lagos State,"
International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(5), pages 1638-1648, May.
Handle:
RePEc:bcp:journl:v:9:y:2025:issue-5:p:1638-1648
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:issue-5:p:1638-1648. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.