Author
Listed:
- Alfin Kusuma
(Industrial Engineering, Pelita Bangsa University)
- Bagaskoro Nur Rofiq
(Industrial Engineering, Pelita Bangsa University)
- Sadin Hartono
(Industrial Engineering, Pelita Bangsa University)
- Ali Sadiman
(Industrial Engineering, Pelita Bangsa University)
- Aris Suryadi
(Industrial Engineering, Pelita Bangsa University)
- Aris Suryadi
(Industrial Engineering, Pelita Bangsa University)
Abstract
This study aims to improve the overhaul time efficiency of coating equipment at PT XYZ, which is a crucial part of the steel sheet galvanizing process. Inefficient overhaul processes can lead to significant downtime, affecting the company’s productivity and profitability. The study identifies factors contributing to prolonged overhaul times and provides solutions to enhance time efficiency through the application of the Seven Tools method. The research employs a qualitative approach with a case study methodology. Data were collected from the Maintenance Department of PT XYZ from February to May 2024, through interviews with technicians and maintenance managers, as well as historical data on overhaul times and maintenance frequency. Analysis was conducted using cause-and-effect diagrams (fishbone), Pareto charts, and process flow analysis. The results indicate that the frame cleaning process using a burner takes the longest time, specifically 17 hours. The primary causes are insufficient burner operation training for workers and the use of only one burner. Proposed solutions include operator training and the addition of burners to expedite the frame cleaning process simultaneously on both sides. Implementing these solutions successfully reduced the overhaul time from 60 hours to 50 hours, a 17% reduction. This research contributes to improving maintenance process efficiency in the manufacturing industry, offering practical solutions to enhance productivity and competitiveness.
Suggested Citation
Alfin Kusuma & Bagaskoro Nur Rofiq & Sadin Hartono & Ali Sadiman & Aris Suryadi & Aris Suryadi, 2025.
"Reducing Overhaul Time of Coating Equipment with Seven Tools Method in PT XYZ,"
International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 9(1), pages 2320-2327, January.
Handle:
RePEc:bcp:journl:v:9:y:2025:i:1:p:2320-2327
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:9:y:2025:i:1:p:2320-2327. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.