The Necessity for Precise Estimation: Formulating a Malaysian Labour and Plant Constant for Construction Productivity

Author

Listed:
  • Mohd Nasir Saari

    (JKR Centre of Excellence for Engineering and Technology (CREaTE), Public Works of Department (JKR) Alor Gajah, Melaka, Malaysia)

  • Mohd Adza Arshad

    (JKR Centre of Excellence for Engineering and Technology (CREaTE), Public Works of Department (JKR) Alor Gajah, Melaka, Malaysia)

  • Wan Faida Wan Mohd Azmi

    (Department of Quantity Surveying, College of Built Environment and Technology, University Teknologi MARA, Perak Branch, Malaysia)

  • Syed Abdul Haris Syed Mustapa

    (Department of Quantity Surveying, College of Built Environment and Technology, University Teknologi MARA, Perak Branch, Malaysia)

  • Lilawati Ab Wahab

    (Department of Quantity Surveying, College of Built Environment and Technology, University Teknologi MARA, Perak Branch, Malaysia)

  • Mohd Nazri Abdullah

    (Department of Quantity Surveying, College of Built Environment and Technology, University Teknologi MARA, Perak Branch, Malaysia)

Abstract

The Malaysian construction industry plays a vital role in driving economic growth and infrastructure development. However, the sector faces significant challenges in achieving accurate productivity measurement and cost estimation due to its reliance on foreign-based Labour and Plant Constants. These metrics, often misaligned with local conditions, lead to budget overruns, project delays, Extension of Time (EOT) claims, and Variation Orders (VOs). The lack of a standardized approach to determine the optimal combination of labour, plant, and machinery further complicates resource allocation and project planning, ultimately affecting the industry’s overall efficiency and competitiveness. This paper emphasizes the urgent need to develop a Malaysian Labour and Plant Constant that reflects the unique conditions of the local construction environment, including labour skills, environmental factors, and machinery capabilities. Such localized constants will enhance cost estimation accuracy, improve resource management, reduce project delays, and foster sustainability in Malaysia’s construction sector. Additionally, this initiative would align the industry with global best practices, boosting its competitiveness both locally and internationally. Establishing a robust resource optimization methodology will improve cost estimates, reduce project delays, and enhance overall efficiency. This paper emphasizes the necessity for a Malaysian-specific approach to productivity measurement and cost estimation to boost the accuracy and reliability of tender evaluations, ultimately strengthening the competitiveness and sustainability of the Malaysian construction industry.

Suggested Citation

  • Mohd Nasir Saari & Mohd Adza Arshad & Wan Faida Wan Mohd Azmi & Syed Abdul Haris Syed Mustapa & Lilawati Ab Wahab & Mohd Nazri Abdullah, 2024. "The Necessity for Precise Estimation: Formulating a Malaysian Labour and Plant Constant for Construction Productivity," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(10), pages 1509-1515, October.
  • Handle: RePEc:bcp:journl:v:8:y:2024:i:10:p:1509-1515
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-8-issue-10/1509-1515.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijriss/articles/the-necessity-for-precise-estimation-formulating-a-malaysian-labour-and-plant-constant-for-construction-productivity/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:8:y:2024:i:10:p:1509-1515. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.