IDEAS home Printed from https://ideas.repec.org/r/eee/transa/v37y2003i3p195-224.html
   My bibliography  Save this item

Scheduling and platforming trains at busy complex stations

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Sels, P. & Vansteenwegen, P. & Dewilde, T. & Cattrysse, D. & Waquet, B. & Joubert, A., 2014. "The train platforming problem: The infrastructure management company perspective," Transportation Research Part B: Methodological, Elsevier, vol. 61(C), pages 55-72.
  2. Gabrio Caimi & Dan Burkolter & Thomas Herrmann & Fabian Chudak & Marco Laumanns, 2009. "Design of a Railway Scheduling Model for Dense Services," Networks and Spatial Economics, Springer, vol. 9(1), pages 25-46, March.
  3. Burdett, R.L. & Kozan, E., 2010. "A disjunctive graph model and framework for constructing new train schedules," European Journal of Operational Research, Elsevier, vol. 200(1), pages 85-98, January.
  4. Alberto Caprara & Laura Galli & Paolo Toth, 2011. "Solution of the Train Platforming Problem," Transportation Science, INFORMS, vol. 45(2), pages 246-257, May.
  5. Carey, Malachy & Crawford, Ivan, 2007. "Scheduling trains on a network of busy complex stations," Transportation Research Part B: Methodological, Elsevier, vol. 41(2), pages 159-178, February.
  6. Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005. "Operations Research in passenger railway transportation," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
  7. Richard Lusby & Jesper Larsen & David Ryan & Matthias Ehrgott, 2011. "Routing Trains Through Railway Junctions: A New Set-Packing Approach," Transportation Science, INFORMS, vol. 45(2), pages 228-245, May.
  8. Yuan, Jianxin & Hansen, Ingo A., 2007. "Optimizing capacity utilization of stations by estimating knock-on train delays," Transportation Research Part B: Methodological, Elsevier, vol. 41(2), pages 202-217, February.
  9. Lu, Gongyuan & Nie, Yu(Marco) & Liu, Xiaobo & Li, Denghui, 2019. "Trajectory-based traffic management inside an autonomous vehicle zone," Transportation Research Part B: Methodological, Elsevier, vol. 120(C), pages 76-98.
  10. Kenetsu Uchida & Agachai Sumalee & David Watling & Richard Connors, 2007. "A Study on Network Design Problems for Multi-modal Networks by Probit-based Stochastic User Equilibrium," Networks and Spatial Economics, Springer, vol. 7(3), pages 213-240, September.
  11. Amitrajeet Batabyal, 2007. "A probabilistic analysis of a scheduling problem in the economics of tourism," Economics Bulletin, AccessEcon, vol. 12(4), pages 1-7.
  12. Vromans, Michiel J.C.M. & Dekker, Rommert & Kroon, Leo G., 2006. "Reliability and heterogeneity of railway services," European Journal of Operational Research, Elsevier, vol. 172(2), pages 647-665, July.
  13. Lu, Gongyuan & Ning, Jia & Liu, Xiaobo & Nie, Yu (Marco), 2022. "Train platforming and rescheduling with flexible interlocking mechanisms: An aggregate approach," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
  14. Zhang, Jiamin, 2015. "Analysis on line capacity usage for China high speed railway with optimization approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 77(C), pages 336-349.
  15. Lee, Yusin & Chen, Chuen-Yih, 2009. "A heuristic for the train pathing and timetabling problem," Transportation Research Part B: Methodological, Elsevier, vol. 43(8-9), pages 837-851, September.
  16. Sels, P. & Dewilde, T. & Cattrysse, D. & Vansteenwegen, P., 2016. "Reducing the passenger travel time in practice by the automated construction of a robust railway timetable," Transportation Research Part B: Methodological, Elsevier, vol. 84(C), pages 124-156.
  17. Nikola Bešinović & Rob M. P. Goverde, 2019. "Stable and robust train routing in station areas with balanced infrastructure capacity occupation," Public Transport, Springer, vol. 11(2), pages 211-236, August.
  18. Yidong Wang & Rui Song & Shiwei He & Zilong Song, 2022. "Train Routing and Track Allocation Optimization Model of Multi-Station High-Speed Railway Hub," Sustainability, MDPI, vol. 14(12), pages 1-21, June.
  19. Flamini, Marta & Pacciarelli, Dario, 2008. "Real time management of a metro rail terminus," European Journal of Operational Research, Elsevier, vol. 189(3), pages 746-761, September.
  20. Carlo Mannino & Alessandro Mascis, 2009. "Optimal Real-Time Traffic Control in Metro Stations," Operations Research, INFORMS, vol. 57(4), pages 1026-1039, August.
  21. repec:ebl:ecbull:v:12:y:2007:i:4:p:1-7 is not listed on IDEAS
  22. G. Caimi & F. Chudak & M. Fuchsberger & M. Laumanns & R. Zenklusen, 2011. "A New Resource-Constrained Multicommodity Flow Model for Conflict-Free Train Routing and Scheduling," Transportation Science, INFORMS, vol. 45(2), pages 212-227, May.
  23. Andrea D'Ariano & Francesco Corman & Dario Pacciarelli & Marco Pranzo, 2008. "Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time," Transportation Science, INFORMS, vol. 42(4), pages 405-419, November.
  24. Jingliu Xu & Zhimei Wang & Shangjun Yao & Jiarong Xue, 2022. "Train Operations Organization in High-Speed Railway Station Considering Variable Configuration," Sustainability, MDPI, vol. 14(4), pages 1-17, February.
  25. Matthew E. H. Petering & Mojtaba Heydar & Dietrich R. Bergmann, 2016. "Mixed-Integer Programming for Railway Capacity Analysis and Cyclic, Combined Train Timetabling and Platforming," Transportation Science, INFORMS, vol. 50(3), pages 892-909, August.
  26. Samà, Marcella & Pellegrini, Paola & D’Ariano, Andrea & Rodriguez, Joaquin & Pacciarelli, Dario, 2016. "Ant colony optimization for the real-time train routing selection problem," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 89-108.
  27. Martin Josef Geiger & Sandra Huber & Sebastian Langton & Marius Leschik & Christian Lindorf & Ulrich Tüshaus, 2018. "Multi-attribute assignment of trains to departures in rolling stock management," Annals of Operations Research, Springer, vol. 271(2), pages 1131-1163, December.
  28. Burdett, R.L. & Kozan, E., 2009. "Techniques for inserting additional trains into existing timetables," Transportation Research Part B: Methodological, Elsevier, vol. 43(8-9), pages 821-836, September.
  29. Andreas Økland & Nils O. E. Olsson, 2021. "Punctuality development and delay explanation factors on Norwegian railways in the period 2005–2014," Public Transport, Springer, vol. 13(1), pages 127-161, March.
  30. Chow, Andy H.F. & Pavlides, Aris, 2018. "Cost functions and multi-objective timetabling of mixed train services," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 335-356.
  31. Chakroborty, Partha & Vikram, Durgesh, 2008. "Optimum assignment of trains to platforms under partial schedule compliance," Transportation Research Part B: Methodological, Elsevier, vol. 42(2), pages 169-184, February.
  32. Yinggui Zhang & Ruihua Hu & Qiongfang Zeng & Yuhang Wang & Ya Liu & Shan Huang, 2023. "Optimal Train Platforming with Shunting Operations for Multidirectional Passenger Stations: A Case Study of Guangzhou Station," Mathematics, MDPI, vol. 11(14), pages 1-19, July.
  33. Bhatia, Vinod & Sharma, Seema, 2021. "Expense based performance analysis and resource rationalization: Case of Indian Railways," Socio-Economic Planning Sciences, Elsevier, vol. 76(C).
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.