IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v68y2000i1p73-93.html
   My bibliography  Save this item

Modelling input-output workload control for dynamic capacity planning in production planning systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
  2. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
  3. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
  4. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2016. "Tactical capacity planning in a real-world ETO industry case: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 180(C), pages 158-171.
  5. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2002. "Exploring applicability of the workload control concept," Research Report 02A72, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  6. Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
  7. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
  8. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
  9. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
  10. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
  11. Suresh Muthulingam & Anupam Agrawal, 2016. "Does Quality Knowledge Spillover at Shared Suppliers? An Empirical Investigation," Manufacturing & Service Operations Management, INFORMS, vol. 18(4), pages 525-544, October.
  12. Soepenberg, G.D. & Land, Martin & Gaalman, Gerard, 2008. "The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies," International Journal of Production Economics, Elsevier, vol. 112(1), pages 495-503, March.
  13. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
  14. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
  15. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
  16. Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
  17. Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
  18. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
  19. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
  20. repec:dgr:rugsom:02a72 is not listed on IDEAS
  21. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
  22. Betrand, J.W.M. & van Ooijen, H.P.G., 2008. "Optimal work order release for make-to-order job shops with customer order lead-time costs, tardiness costs and work-in-process costs," International Journal of Production Economics, Elsevier, vol. 116(2), pages 233-241, December.
  23. Haeussler, Stefan & Missbauer, Hubert, 2014. "Empirical validation of meta-models of work centres in order release planning," International Journal of Production Economics, Elsevier, vol. 149(C), pages 102-116.
  24. Chen-Yang Cheng & Pourya Pourhejazy & Tzu-Li Chen, 2023. "Computationally efficient approximate dynamic programming for multi-site production capacity planning with uncertain demands," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 797-837, September.
  25. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
  26. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
  27. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
  28. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
  29. Pergher, Isaac & Frej, Eduarda Asfora & Roselli, Lucia Reis Peixoto & de Almeida, Adiel Teixeira, 2020. "Integrating simulation and FITradeoff method for scheduling rules selection in job-shop production systems," International Journal of Production Economics, Elsevier, vol. 227(C).
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.