IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v170y2015ipbp513-520.html
   My bibliography  Save this article

Order release in the hybrid MTO–FTO production

Author

Listed:
  • Fernandes, Nuno O.
  • Silva, Cristóvão
  • Carmo-Silva, S.

Abstract

In this paper, we analyse and compare the impact of the choice of the release method in a hybrid make-to-order (MTO)–finish-to-order (FTO) production system composed of two stages. The study is motivated by a practical problem from the aluminium profiles manufacturing industry, where for shortening throughput times it is allowed to start production of standard and regular items without confirmed orders, holding a stock of semi-finished products. The first stage manufactures both, items to order and items to a stock of semi-finished products, while the second stage is a customization stage based on customer demand requests and specifications. The paper addresses the questions of where order release control should be exercised, i.e., at only one stage or at both stages, and when should it be exercised. Simulation results suggest that load-based order release can be successfully applied to this hybrid production system when combined with a replenishment control policy for semi-finished products. Load-based order release contributes to reduce the total throughput time and the percentage of tardy orders of both, MTO and FTO, while contributing to a reduction of the semi-finished products inventory levels required to achieve a given fill rate. The study is a contribution toward the alignment of workload control theory to industrial practice.

Suggested Citation

  • Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
  • Handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:513-520
    DOI: 10.1016/j.ijpe.2015.03.025
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527315001000
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.03.025?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Soman, C.A. & van Donk, D.P. & Gaalman, G.J.C., 2007. "Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 191-199, July.
    2. Brian Denton & Diwakar Gupta & Keith Jawahir, 2003. "Managing Increasing Product Variety at Integrated Steel Mills," Interfaces, INFORMS, vol. 33(2), pages 41-53, April.
    3. van Donk, Dirk Pieter, 2001. "Make to stock or make to order: The decoupling point in the food processing industries," International Journal of Production Economics, Elsevier, vol. 69(3), pages 297-306, February.
    4. Jayant R. Kalagnanam & Milind W. Dawande & Mark Trumbo & Ho Soo Lee, 2000. "The Surplus Inventory Matching Problem in the Process Industry," Operations Research, INFORMS, vol. 48(4), pages 505-516, August.
    5. Wu, Muh-Cherng & Jiang, Jr-Hsiung & Chang, Wen-Jen, 2008. "Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features," International Journal of Production Economics, Elsevier, vol. 112(1), pages 416-426, March.
    6. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    7. Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
    8. Zhang, Zhe George & Kim, Ilhyung & Springer, Mark & Cai, Gangshu (George) & Yu, Yugang, 2013. "Dynamic pooling of make-to-stock and make-to-order operations," International Journal of Production Economics, Elsevier, vol. 144(1), pages 44-56.
    9. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    10. Morikawa, Katsumi & Takahashi, Katsuhiko & Hirotani, Daisuke, 2014. "Make-to-stock policies for a multistage serial system under a make-to-order production environment," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 30-37.
    11. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
    12. Fernandes, Nuno O. & Carmo-Silva, S., 2011. "Workload control under continuous order release," International Journal of Production Economics, Elsevier, vol. 131(1), pages 257-262, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    2. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
    3. Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
    4. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
    5. Morikawa, Katsumi & Takahashi, Katsuhiko, 2017. "Scheduling appointments for walk-ins," International Journal of Production Economics, Elsevier, vol. 190(C), pages 60-66.
    6. Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
    7. Dieter Fiems & Eline De Cuypere & Koen De Turck & Dieter Claeys, 2020. "Performance Analysis of Hybrid MTS/MTO Systems with Stochastic Demand and Production," Mathematics, MDPI, vol. 8(11), pages 1-16, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
    2. Wikner, Joakim & Naim, Mohamed M. & Spiegler, Virginia L.M. & Lin, Junyi, 2017. "IOBPCS based models and decoupling thinking," International Journal of Production Economics, Elsevier, vol. 194(C), pages 153-166.
    3. Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
    4. Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
    5. Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
    6. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
    7. Shouyao Xiong & Yuanyuan Feng & Kai Huang, 2020. "Optimal MTS and MTO Hybrid Production System for a Single Product Under the Cap-And-Trade Environment," Sustainability, MDPI, vol. 12(6), pages 1-16, March.
    8. Calle, Marcos & González-R, Pedro L. & Leon, Jose M. & Pierreval, Henri & Canca, David, 2016. "Integrated management of inventory and production systems based on floating decoupling point and real-time information: A simulation based analysis," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 48-57.
    9. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
    10. Zhang, Zhe George & Kim, Ilhyung & Springer, Mark & Cai, Gangshu (George) & Yu, Yugang, 2013. "Dynamic pooling of make-to-stock and make-to-order operations," International Journal of Production Economics, Elsevier, vol. 144(1), pages 44-56.
    11. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
    12. Luo, Hao & Yang, Xuan & Kong, Xiang T.R., 2019. "A synchronized production-warehouse management solution for reengineering the online-offline integrated order fulfillment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 211-230.
    13. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
    14. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    15. Milind Dawande & Jayant Kalagnanam & Ho Soo Lee & Chandra Reddy & Stuart Siegel & Mark Trumbo, 2004. "The Slab-Design Problem in the Steel Industry," Interfaces, INFORMS, vol. 34(3), pages 215-225, June.
    16. repec:dgr:rugsom:02a72 is not listed on IDEAS
    17. Zhiming Shi & Yisong Li & Gábor Bohács & Qiang Zhou, 2022. "A Study on Optimal Location Selection and Semi-Finished Product Inventory Allocation in the Steel Industry," Sustainability, MDPI, vol. 14(22), pages 1-21, November.
    18. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
    19. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    20. Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
    21. Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:513-520. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.